Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.

Slides:



Advertisements
Similar presentations
Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Reporting on Projections and the Total Effect of Policies and Measures Introductory presentation by the UNFCCC secretariat Workshop on the preparation.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Fundamentals of PDD Analysis Recap of Theory and presentation of an illustrative PDD by Steve Thorne Maputo second SSA regional workshop 17 August 2004.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
James Grabert Manager, Joint Implementation, UNFCCC secretariat Joint Implementation Overview & Status Kyoto Protocol and Carbon Market.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
1 Andrew Howard Climate Change Secretariat Emissions trading and project-based mechanisms 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop.
Reporting on Policies and Measures Introductory presentation by the UNFCCC secretariat Workshop on the preparation of fourth national communications from.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
Quality assurance / Quality control system for the Greek GHG emissions inventory Yannis Sarafidis, Elena Georgopoulou UNFCCC Workshop on National Systems.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
ENDA TM / CDM-PDD1 Analysis of a CDM-PDD illustrated by the El Gallo project Second Regional Workshop on CD4CDM August 2004 Maputo, Mozambique Dr.
Francisco Arango UNFCCC secretariat Draft JI LULUCF PDD form (incl. guidelines for users) Fourth meeting of the.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Capacity Development for CDM - National Workshop on PDD Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
CD4CDM Review of Workshop 1 ….innovating energy solutions…. KITE, SSN & UNEP.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
1 Formato de um PDD. 2 índice Formato de um PDD Descrição geral da atividade do projeto Aplicação de uma metodologia de linha de base e monitoramento.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Task Force on Emission Inventories and Projections Emission inventory adjustments – an update TFEIP co-chairs: Chris Dore, Martin Adams and Kristina Saarinen.
1 NATIONAL SYSTEMS UNFCCC Workshop on National Systems under Article 5, paragraph 1, of the Kyoto Protocol 11–12 April 2005 Wissenschaftszentrum, Bonn,
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
Ecuador frente al mercado global de carbono CD4CDM in Ecuador CD4CDM side event at CoP-10 Buenos Aires, 11/XII/2004 Marcos Castro Ecuadorian CDM Promotion.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Conservativeness in baselines WB workshop for CDM project developers Buenos Aires, 5 December 2004 Lambert Schneider.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
European Environment Agency European Topic Centre on Air and Climate Change The Guidelines 2007 Comments and issues remaining: Drafting Team: Justin (ETC-ACC),
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Clean Development Mechanism
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
JISC work regarding criteria for baseline setting and monitoring
CDM Methods and project design: Baselines
Q&A sessions at UNFCCC SB26
Session 1 Guidelines for projects under Article 6 of the Kyoto Protocol First UNFCCC workshop on implementation of Article 6 projects under the Kyoto Protocol.
Theoretical differences between CDM and JI validation/determination
Small-Scale Projects Under JI
Presentation title Second workshop on the revision of the UNFCCC Annex I reporting guidelines Time-series consistency and recalculations Bonn, Germany,
Development of determination and verification manual (DVM)
Work Accomplished by JISC
Revised emission reporting Guidelines – Projection issues
Presentation transcript:

Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol Guidelines to fill CDM-PDD, CDM-NMB and CDM-NMM WB Workshop for developers Buenos Aires 5 December 2004

Project design document| Overview Based on Appendix B of the CDM M&P – was revised twice Guidelines + forms: CDM-PDD, CDM-NMB, CDM-NMM (see UNFCCC CDM web site) For A&R projects forms and guidelines are different (correspond to A&R M&P) For small-scale project activities a simplified PDD is available. Submissions of new methodologies and/or categories do not need to use forms (correspond to SSC M&P)

Project design document| Important reminders in filling forms Always reading very carefully the latest version of guidelines before filling in forms Also need to consult clarifications and guidance from the Board (see UNFCCC CDM web site section for this) before filling forms. Not to add logos, change text, forms, font or fields Fill in all requested fields

Guidelines| Overview CDM Glossary of terms: Important clarifications by EB on terms and info to be filled in the forms (e.g. project participants, crediting period, etc.) General explanations on how to fill forms (e.g. fill in English, not change logos, etc.) Explanations relating to each form (e.g. important issues to consider relating to baselines in CDM-NMB, etc) Explanations relating to each field in a form Important: The guidelines may be revised as clarifications and guidance by EB evolves.

Guidelines| Glossary of terms Important clarifications – be careful in adhering to them in filling the CDM-PDD (i.e. definition of project participants) The Glossary of terms for A&R project activities provides also for key definitions to be taken care of in filling forms

Guidelines| CDM - PDD A. General description of project activity B. Application of a baseline methodology C. Duration of the project activity / Crediting period D. Application of a monitoring methodology and plan E. Estimation of GHG emissions by sources F. Environmental impacts G. Stakeholders’ comments Annexes: Annex 1: Contact information on participants in the project activity Annex 2: Information regarding public funding Annex 3: Baseline Information Annex 4: Monitoring plan Needed info to submit CDM-NMM and CDM-NMB Needed info to submit CDM-NMM and CDM-NMB

Guidelines| CDM-NMB A. Identification of methodology B. Overall summary description C. Choice of and justification as of baseline approach D. Explanation and justification of the proposed new baseline methodology E. Data sources and assumptions F. Assessment of uncertainties G. Explanation of how the baseline methodology was developed in a transparent and conservative manner To be submitted together with CDM-NMM and CDM-PDD (sections A-E and relevant annexes) IMPORTANT: Need for ensuring consistency with CDM-NMM (i.e. formulae, data).

Guidelines| CDM-NMM A. Identification of methodology B. Proposed new monitoring methodology To be submitted together with CDM-NMM and CDM-PDD (sections A-E and relevant annexes) Two options for monitoring emission reductions depending on project type and baseline methodology (i.e. need to monitor emissions in the baseline scenario and the project scenario OR of the project scenario only) IMPORTANT: Need for ensuring consistency with CDM-NMB (i.e. formulae, data)