Computer Associates International, Regional Office

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Structural Focus 2007 Senior Thesis Capstone Project Advisor: Prof. Kevin Parfitt University of Rochester Biomedical Engineering / Optics Building River.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
First Baptist Church of Doylestown Senior Thesis Structural Emphasis James Chester Preliminary Phase II Design.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Structural Option Senior Thesis Presentation Spring 2007 Advisor: Dr. Lepage Eric R. Mueller th Street – Oakland, CA.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Mathew Nirenberg AE Senior Thesis Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Discovery Communications Headquarters Silver Springs, MD Josh Woolcock Structural Option Architectural Engineering Pennsylvania State University.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Student Health Center Jacob Brambley - AE (structural option)
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Hunter Woron Spring 2012 Structural Professor Parfitt.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Hyatt Regency Pittsburgh International Airport Hiro McNulty Structural Option AE Senior Thesis Spring 2006.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Ryan Johnson - Structural Option
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April 15, 2003

Presentation Outline Background Information Existing Structural Conditions Design Criteria Redesign Construction Management Lighting Design Conclusions and Recommendation Acknowledgements SETH R. TAKOCH STRUCTURAL OPTION

Location 15min. Off Beltway 35mins. Outside D.C Wood Oak Dr. Baseball Field

Background Information Function: Computer Associates Int. Regional Headquarters Size: 233,000 sq. ft. – 6 floors Rentable Office Space: 207,000 sq. ft. Architectural Features: Precast Concrete Façade with Glass Curtain Wall Six Story Glass Enclosed Atrium Adjacent Day Care Facility

Project Team Owner – Computer Associates International Arcitect – Davis, Carter, Scott Structural Engineer – Smislova, Kehnemui, & Associates. General Contractor – Clark Construction Developer – Tishman Speyer Properties Mechanical – GHT Limited Plumbing – GHT Limited

Existing Structure Flat Slab Construction Concrete Structure 30’ x 30’ Bays 9” Thick Slab Thickness 10’ x 10’ x 5-1/2” Drop Panels 24” x 24” Conc. Columns

Existing Structure Wind Loads are Transferred by Diaphragm Action of Façade Transferred to Framing by Tributary Area 8 Frames N-S and 9 Frames E-W Concrete Frames Resist Lateral Forces Short and Long Frames Floor Slab Adds Resistance due to Diaphragm Action

Design Limitations 50 psf 22 psf 30 psf Old Code – BOCA 96 New Code – IBC 2000 Local Zoning Ordinances Similar Square Footage Minimal Architectural Changes Floor-to-Floor Heights LIVE LOADS PER IBC 2000   LOAD TYPE LOAD ROOF ( RAIN ) 50 psf ROOF ( SNOW ) HIGH ROOF 22 psf ROOF (SNOW) LOW ROOF 30 psf OFFICES, CUBICLES ASSEMBLY, STAIRS 100 psf MECHANICAL 150 psf CORRIDORS 80 psf

Proposal To Redesign a Feasible and Desirable Alternative Structural System and to Incorporate Construction Costs and Schedule Length Into My Solution Time = Money … Money = Time $$$$

Possible Faming Alternatives Composite Steel Construction Non-Composite Steel Construction

Steel Construction Code – IBC2000 LRFD Analysis Parameters 30’ x30’ Typical Bays Fy = 50ksi ASTM A992 Steel F’c = 3ksi Normal Weight Concrete Shear Studs - 3-1/2”high, ¾” diameter (composite) 22 gage Metal Deck

Composite Steel Construction Gravity Analysis – RAM Determined Beam Sizes Determined Column Sizes 2 Story Column Lengths 26’ – 28’ Tall Ranging from W10’s to W12’s Beam Sizes W12x14 Spaced at 6’ o.c. Girders as Deep as a W21’s

Non-Composite Construction Gravity Analysis – RAM Determined Beam Sizes Determined Column Sizes 2 Story Column Lengths 26’ – 28’ Tall Using W12’s Beam Sizes W12x14 Spaced at 6’ o.c. Girders as Deep as a W24’s

Depth Comparison Composite Steel Average – W12’s Critical Depth – W21 Composite Saves 20 Tons of Steel Non-Composite Steel Average – W12’s Critical Depth – W24 Advantage – Composite Steel Construction

Lateral System Shear Wall to Resist Lateral Loading Based on Critical Wind Loading and Torsion 2 – 60’ Long Shear Walls Reinforced to Resist Forces Deflection of h/400

Design Reinforcement Based on the Following Wall Floor Shear Bending   1 #4 @ 12" 8 - #11 2 6 - #11 3 6 - #9 4 #6 @ 12" 4 - #9 5 #7 @ 12" 2 - #9 6 #9 @ 12" 1 - #9 #5 @ 12" #8 @ 12" #10 @ 12" Reinforcement Based on the Following Vn =  (2f’c bd + Avfyvd/s) Mn = Asfy (d-a/2)

Construction Management ` Address Two Main Issues Cost Comparison Project Duration

Construction Management ` Total Building Cost D4 Cost Total = $27,678,667 20-25% Accurate Range of $34.6 million to $20.8 million Not Very Accurate $115.33 / sq. ft.

Construction Management ` Total Building Cost Means Building Construction Cost Data Separate Estimates for Steel and Concrete 10 -15% Accurate More Precise Than D4 Steel Framing = $96.74 / sq.ft. Concrete Frame = $98.45 / sq.ft. Difference = $1.71 / sq.ft. = $410,400

Construction Management ` Cost Comparison D4 Cost = $115.33/sq.ft. = $27,678,667 Means Steel = $96.74/sq.ft. = $23,217,600 Means Concrete = $98.45/sq.ft. = $23,628,000 Percentage Savings Using Steel = 1.7% Savings

Construction Management ` Scheduling Means Data to Calculate Duration Primavera Utilized to Schedule Sequences Total Duration Steel Erection = 376days Total Duration Concrete Placement = 847 days

Construction Management ` After Scheduling Concrete – 260 Days

Construction Management ` After Scheduling – 150 Days

Construction Management ` Savings Advantage Composite Steel Construction Time Advantage Composite Steel Construction Composite Design is Considered One of the Most Economical Methods of Floor Construction for an Office Building

Construction Management ` Crane Sizing On Site 3-1/2 Months Tower Crane Placed Through Atrium Liebherr 200HC Hook Radius – 197ft. Capacity – 5,070# Satisfies Critical Lift of 3,000# @160ft.

Lighting Design Design of Lighting of Daycare Facility Minimum Footcandles of 30fc Fluorescent Luminaries 120’ x 56’ Space to Illuminate 2’ x 4’ Fixtures with 3” Louvers Spaced on a 16’ x 8’ grid Specification From Lithonia Workplane of 2-1/2 ft.

Lighting Design Designed Using Luxicon Renderings on April 15, 2003 At 9:00 am with Daylighting At 1:30 pm with Daylighting At 5:00 pm with Daylighting Without Daylighting

Lighting Design 9:00 am

Lighting Design At 1:30 pm

Lighting Design At 5:00 pm

Lighting Design Without Daylighting

Lighting Design The Lighting Design Meets Required Parameters of 30fc

Conclusion In Conclusion, Composite Steel Construction is a Better Alternative to Non-Composite Construction. Composite Steel is a Viable Alternative to a Two-Way Flat Slab System

Shout Outs’ My Family My Friends The AE Student Body The Entire AE Faculity Smislova, Kehnemui, & Associates, P.A. Computer Associates The ‘U’ And All Of Those Out There That Stuck With Me

? Questions