Session 2 (System Aspects) Rapporteur: Hiroshi Okamoto (JP) 2 nd International Symposium on International Standards for Ultra High Voltage, New Delhi,

Slides:



Advertisements
Similar presentations
International Telecommunication Union ITU-T Study Group 5 The need for special requirements Tetsuya Tominaga Technical Session on Home Networks Geneva,
Advertisements

1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
AG.03: CIGRE SC A3 Green Book planning
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
Study Committee A2 Colloquium in Shanghai, September, 2015 Study Committee A2 Colloquium in Shanghai, September, 2015 SC A2 will have their.
Second IEC-CIGRE UHV Symposium, January 2009, New Delhi
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
Brief on HVDC 2015 Brief on HVDC 2015
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
The Saudi National Committee of the IEC Activities Prepared by: Secretary of Saudi National Electrotechnical Committee (SNEC)
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
© ABB Group August 7, 2015 | Slide 1 Variable Shunt Reactors Optimize Transmission Systems Dr. Claes Bengtsson, Global Product Manager, Reactors. PowerGen.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Report on SC 17A Activity HV switchgear & controlgear Denis Dufournet Anne Bosma A3-14 (AG 01 ) 013 IWD.
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
BRIEF ON THE REPORT OF CIGRE WG B4-45 –
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
Join Us Now at: Enabling Interoperability for the Utility Enterprise And TESTING.
Svc. Transformer A step-down transformer is usually placed between the AC system bus-bar and the low voltage bus-bar to which the thyristor valves are.
לירן קציר Connectivity in Computers IEC TC 57 - Power system management and associated information exchange Established in 1964 – with focus.
All rights reserved Surge Arrester.
All rights reserved Gas-insulated Switchgear (GIS)
Submittal of C as an IEC/IEEE Dual Logo Document IEEE Switchgear Committee Main Committee Meeting 18 October 2007.
All rights reserved MV SWITCHGEAR.
SLIDE 1 ISSUES AND PRACTICAL EXPERIENCES WITH CONNECTION OF WIND FARMS TO WEAK AC NETWORKS June 2013 PRESENTED BY BABAK BADRZADEH.
1200 kV AC Substations - Products and Integrated Solutions International UHV Symposium New Delhi, 29. January 2009 Edelhard Kynast Siemens AG, Energy.
International Council on Large Electric Systems Brasilia Workshop 22 September 2003 TRANSMISSION ACCESS AND CONGESTION MANAGEMENT O. Lavoine-RTE-France.
Accelerate the Construction of the UHV Power Grid and Promote the Sustainable Development of Chinese Power Industry Liu Zhenya State Grid Corporation of.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
1 Progress of, and prospects for, commercial applications of UHV 1100kV Transmission System in TEPCO 2 nd International Symposium on International Standards.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
POWER HOUSE.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
A PRESENTATION OF PRACTICAL TRAINING ON “400KV GSS “ \
A SUMMER TRANNING PRESENTATION ON 400 KV GRID SUB STATION BIKANER
Submitted to: Submitted by:
UHV Equipment Requirements Anton Janssen
MIT requirements from the TSO perspective MIDDLEWARE IMPROVED TECHNOLOGY (MIT) for increased resilience of Interdependent Critical Infrastructure ROME,
P1 All rights reserved by SGCC 1 State Grid Corporation of China Jan.2009 India Innovations in the engineering of ±800kV UHVDC in China.
220 KV GRID SUB STATION MORAK,KOTA SUBMITTED TO:- SUBMITTED BY:- SHRI VIKAS BHALLA LAKHAN SINGH ASSISTENT PROFESSOR ROLL NO.-12ECTEE029 ELECRTICAL DEPARTMENT.
Submitted To:- Submitted By:- Mr.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
What makes substation work?
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
KAIST NUCLEAR & QAUNTUM NICIEL SEMINAR 1 / 23 Review on Power Factor Young Seung LEE 04/26/2005 SEMINAR.
Study of Line-used Magnetically Controlled Reactor(MCR) Zhanfeng Deng China Electrical Power Research Institute.
6 Week industrial Training Presentation
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Energy Storage Systems (ESS) Standards Activities
IG BASED WINDFARMS USING STATCOM
Engineering Technology Division
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
IN ADDITION OF UI RATE CORROSPONDING TO FREQUENCY OF 49
Evolution of HV Cable Systems
POWER SYSTEM PLANNING AND DESIGN. TITLE : DESIGN OF EHV TRANSMISSION LINES & BUNDELED CONDUCTORS IN EHV LINES. PREPARED BY : JOBIN ABRAHAM.
Overview Key diagram of 220 KV Sub station, Ablowal Cables
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
Context : Deregulation of the electricity market
Review of Distribution Network Protection
All rights reserved Gas-insulated Switchgear (GIS)
NOTICE The size of display board is 1m (width)×2.40m(height). A size 0.95m (width)×1.40m(height) of your poster is recommend. In the poster, please edit.
Substation Equipment's
Addis Ababa April 27,
Presentation transcript:

Session 2 (System Aspects) Rapporteur: Hiroshi Okamoto (JP) 2 nd International Symposium on International Standards for Ultra High Voltage, New Delhi, India

1 Key issues in Session 2 System aspects of UHV technologies Standard voltage (highest voltage of equipment), Power system stabilities especially in the UHVAC/(U)HVDC hybrid systems, Insulation coordination, and Technical requirements and standardization aspects for equipment installed in the UHV network

2 Session 2 “ System Aspects ” 2-1 “1200 kV system parameters and status of development of substation equipment & transmission lines in India” 2-2 “Selection of the rated voltage for the UHV AC system in China” 2-3 “Analysis of overvoltages related to the UHV AC system”, China 2-4 “Stability research on the planned UHV power grid in China” 2-5 “Standardization aspects of UHV in AC networks”, IEC/TC17

3 Summary System aspects Standard voltage: 2-1(India) and 2-2(China) Overvoltage control: 2-1(India) and 2-3(China) Secondary arc extinction : 2-3 (China) Stability of UHVAC/(U)HVDC system: 2- 4(China) Technical requirements for equipment in UHVAC network Switchgear : 2-5 (IEC/TC17), 2-1 (India), 2-3 (China) Surge Arrestor : 2-1 (India), 2-3 (China)

4 System Aspects (1) In India, highest voltage and test voltage for equipment are determined for their first project expected in 2013/2014. Standard voltage: 1200kV SIWV: 1800kV LIWV: 2250kV, 2400kV In China, the first project will start its commercial operation in Standard voltage: 1100kV SIWV: 1800kV LIWV: 2250kV, 2400kV

5 System Aspects (1) Question 1 Are IEC/TC8 and IEC/TC28 proceeding with their work on necessary revisions in IS and IS to meet the urgent market needs in China and India? Are proposed revisions and work schedules in TC8 and TC28 consistent with the project considered in both markets?

6 System Aspects (2) In India and China, large scale UHVAC / (U)HVDC hybrid systems will be constructed. In this context, the dynamic security of the hybrid system will be one major concern of power system planners and operators mainly because of - the very large transmission capacity of UHV transmission and - interaction between UHVAC and (U)HVDC systems.

7 System Aspects (2) Question 2 Given the growing applications of UHVAC / (U)HVDC transmission technologies, there may exist some needs for standardization on the system design and operation guidelines of UHV transmission systems considering some stability control measures. What role should TC8 and TC115 play in the design and operating guidelines of UHVAC/(U)HVDC hybrid system?

8 Technical Requirements for equipment in UHVAC networks (1) IEC/TC17 will start standardization of switchgear for UHVAC networks, based on the report from CIGRE WG A3.22. Some technical requirements for UHV equipment will not be simply an extrapolation of those already defined in IEC standards up to 800kV, mainly because there exist some peculiarities in UHV AC network.

9 Technical Requirements for equipment in UHVAC networks (1) Question 3 Are there any other modifications or new items by SC17A or SC17C needed for China and India? Comments from both countries are welcome. What kind of peculiarities in UHVAC networks should be considered in the standardization process in TC17?

10 Technical Requirements for equipment in UHVAC networks (2) High performance metal oxide surge arrestor (MOSA) plays a pivotal role in insulation coordination of UHVAC network, as well as other countermeasures such as circuit breakers equipped with pre-insertion resistor, and shunt reactors directly connected to UHV lines.

11 Technical Requirements for equipment in UHVAC networks (2) Question 4 How were specifications of MOSA (Metal Oxide Surge Arrestor) determined in China? Residual voltage of MOSA with respect to highest voltage of equipment is determined to be lower in India than that in China, probably because the lower protection level is preferable from the viewpoint of overvoltage control. Are there any technical challenges in application of the lower protection level of MOSA?