Task 2.1: Software Specifications Markus Kissler-Patig.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Advertisements

Geant4 ESTEC Workshop K.Amako 1 Geant4 User’s Documents Geant4 ESTEC Workshop 23 September, 1999 Katsuya Amako (KEK)
Dean Fortin – Massachusetts WIC 23 July System Testing Objectives  Verify hardware  Verify software  Verify hardware/software interaction  Verify.
DTC AOP GSI October 1, FY09 Funding Resource/Tasks AFWA (February January 2010): – GSI code management and support (1.1FTE)
WP5 – Knowledge Resource Sharing and Management Kick-off Meeting – Valkenburg 8-9 December 2005 Dr. Giancarlo Bo Giunti Interactive Labs S.r.l.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
UGDIE KICK-OFF MEETING F-MAN 1 ΑΝΝΕΧ 1-A by UGDIE.
ESSnet on SDMX phase II Dario Camol
nd Management Meeting Project Overview & Progress EUN, Brussels, 30 September 2010 Caroline Kearney Knowledge-Building.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
NORWEGIAN SOCIAL SCIENCE DATA SERVICES MADIERA Project Management.
Summary Report Project Name: Platform Implementation Project (PIP) Brief Project Description: –PIP will deliver a reference implementation of OHT assets.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Work Package 1 Title: ‘Analysis of the State of the Art and Development.
Kick-off meeting Rome, March 2013 AthenaPlus.
02/11/98ISO-3D Kick-Off Meeting Esprit Project N° Interpretation of Symbolic Objects in 3D representation (ISO-3D) (ISO-3D) Kick-Off Meeting.
Work Package 5 Internet Platform for Cybertaxonomy.
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
WP 6: Tool Suite WP6: Tool Suite CSICURJUPVTotal WP6: Tool suite (Leader: V.Botti – UPV) Task 6.1: Design.
FotoGazmic Software Project Plan Senior Project: CS 425 Spring 2003.
Euro3D RTN Kick-off Meeting IAC, Tenerife July 2-4, Introduction of FP5: „Improving the Human Research Potential and the Socio-economic Knowledge.
Simulation with Open Source Physics Butch DeBerry Advisor: Dr. Bruce Mason.
NOV-3733-SL-9347 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
Work package 2: User analysis and usability testing Responsible partner: Danish Data Archives WP leader: Anne Sofie Fink, DDA.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
Documentation NCRR Documentation for BioPSE/SCIRun and map3d All this great software and you want documentation too!?
First 5 LA Phase III Website Strategic Plan Presentation to Public Affairs Committee July 13, 2006.
Summary Report Project Name: Open Library of HIE (OLHIE), Formerly Interface Library Project (ILP) Brief Project Description: –OLHIE will establish a library,
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
Improvements of Shorelines Defences Against Marine Pollution ISDAMP+ project 2012/PREP/17 Frédéric MUTTIN (EIGSI La Rochelle) Kick-off meeting selected.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Slide 1 Use Case Packets.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
WP2 – Strategy, co-operation and dissemination EuroVO-AIDA – First periodic review – 24 April 2009 Françoise Genova, Project Coordinator WP2 – NA2 Strategy,
Summary Report Project Name : HingX (Health ingenuity eXchange), formerly known as HEART Brief Project Description : HingX is a community-driven platform.
DATA, TOOLS, AND OUTREACH DATA, TOOLS, AND OUTREACH WORKPACKAGE 1 “WP1 will provide a solid data base and archive, powerful tools, and user friendly access.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Astroparticle Physics for Europe ASPERA2WP6: OUTREACH & Electronic Tools Electronic Tools Antonio Ferrer IFIC/MICINN Kick-off Meeting DESY 7 July 2009.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) NA2: TA system Monitoring.
QUALITY ASSURANCE Wp 7 Turku University of Applied Sciences Heikki Ellilä & Mari Lahti.
ACT476 CAPSTONE WRITING AN USER MANUAL. Developers VS Users Developers want to write code Have little time to document or write user’s manuals Users on.
Nexus deliverable 4.6. Final report on Balkan Food Platform and recommendations for future integration of WBC/EECA countries (deliverable structure, contributions,
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
Summary Report Project Name: Personal Connected Health Brief Project Description: This project serves as the rallying point for software and tools that.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
September 2005 DEA: First National Workshop 1 Development and Energy in Africa First National Workshop: Tanzania 12 September 2005 Introduction Gordon.
Task 2.4 Crowded Field 3D Spectroscopy : goals: “to implement software tools for accurate background subtraction and spectrophotometry of point sources.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Evaluation of Liferay modules EGI-InSPIRE mini-project Gergely Sipos EGI.eu.
CMGT/410 Project Planning & Implementation Version 13 Check this A+ tutorial guideline at 410/CMGT-410-Complete-Class-Guide.
ECO 212 Final Exam Guide Check this A+ tutorial guideline at 212/ECO-212-Final-Exam For more classes visit
ECO 212 Principles of Economics Check this A+ tutorial guideline at 212/ECO-212-Complete-Class-And-Final- Guide For.
ECO 365 Final Exam Guide 24/30 Check this A+ tutorial guideline at 365/ECO-365-Final-Exam-Guide For more classes visit.
PSY 340 Complete Class Version 3 Check this A+ tutorial guideline at Y-340/PSY-340-Complete-Class-Guide For more classes.
BIS 219 Final Exam 6 Sets Check this A+ tutorial guideline at 219/BIS-219-Final-Exam-Guides For more classes visit.
BSA 385 Week 3 Individual Assignment Frequent Shopper Program Part 2 Check this A+ tutorial guideline at
ACC 290 Final Exam Guide Check this A+ tutorial guideline at 290/ACC-290-Final-Examhttp://
WP6. Quality Plan 6.2 Develop a monitoring, evaluation, and quality plan Edited by September, 2017.
Steve Peedell Joint Research Centre
KM3NeT 2.0 Kick-off meeting, Athens,
Elisabetta Ronchieri WP3
ALMA Common Software Training-Course Session 4 - ACS Docs
ESSnet on SDMX phase II Laura Vignola
BioMedBridges – Work Packages 2 & 12
CORA ESSNet COmmon Reference Architecture starting ...
Assessment and Weeding as Part of a Major Renovation Project
The basics ESSnet on SDMX prepared in 2008/2009
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
Surface Systems.
Presentation transcript:

Task 2.1: Software Specifications Markus Kissler-Patig

Markus Kissler-Patig, ESO RTN kick-off, La Laguna, July Task 2.1: Software Specifications Goals: Define a common data format (for reduced data) Define a common software frame –common software libraries –programming guidelines –interfaces with general software packages –interface to visualization tools

Markus Kissler-Patig, ESO RTN kick-off, La Laguna, July Task 2.1: Software Specifications Timeline: Months 0-6: –Finalize Euro3D format –Set-up software frame + guidelines Months 6-36: –Expand software package(s), link to visualization Milestones : Format release ; : Software release

Markus Kissler-Patig, ESO RTN kick-off, La Laguna, July Task 2.1: Software Specifications Coordination: –Format: M.Kissler-Patig + Task Force –Software: ESO/Lyon - “leader” needed –Contributions by all other tasks in WP 2 Meetings: –September: work planned in Lyon –Feb 2003: Software Tutorial –Feb 2005: Data Analysis Workshop

Markus Kissler-Patig, ESO RTN kick-off, La Laguna, July Task 2.1: Software Specifications Planned Publications: Format definition (current version 0.5) Software platform description (based on Lyon documentation) Software: programmer’s tutorial Software release (first “package” planned Q1/2004, ~yearly releases) Software: user’s guide