CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu,

Slides:



Advertisements
Similar presentations
Status of data production and delivery. 2 17th CAA CrossCal Meeting – 25 March Status of dataset delivery 2.Status of data production pipeline.
Advertisements

CAA 10th Cross Calibration Workshop, Paris, France, 2-4th Nov CLUSTER / STAFF Action items C. Burlaud, P. Robert, M. Maksimovic, N. Cornilleau-Wehrlin,
STAFF Report. 1.Status of data delivery 2.Delivery Plan 3.Status of data pipeline 4.STAFF/FGM cross calibration 5.Conclusions 2 15th Cross-Calibration.
STAFF-SC / FGM Comparison I. Spectrograms comparison II. Average spectra comparison III. Wave Forms comparison IV. Noise Level Conclusions Cross_Calibration.
FGM report 10 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Chris Carr, Tim Oddy, André Balogh I mperial College London November 2009.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
11 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
1 10th CAA Cross-Calibration meeting, Paris, 2-4 November 2009 STAFF/SC cross-calibration activities Patrick ROBERT, C. Burlaud & STAFF Team 2) The Calibrated.
0. Short reminder of STAFF-SC and STAFF-SA experiment I. status of open action items II. status of data production III. status of calibration IV. status.
CAA 12th Cross-cal meeting Toulouse Oct STAFF status report N. Cornilleau-Wehrlin,P. Robert, V. Bouzid, and STAFF team.
Comparison of STAFF-SA and WBD Magnetic components of intense whistler-mode chorus Prepared by Ondrej Santolik 14th CAA Cross-Calibration meeting, York,
CAA 9th Cross-Calibration Workshop, Cambridge, England, 25th-27th March CLUSTER / STAFF ● status of calibration and archiving activities ● archiving.
STAFF Report Patrick Robert, Rodrigue Piberne & STAFF team.
1 12th CAA Cross-Calibration meeting, Toulouse, Oct 2010 STAFF/SC Calibration & Cross-Calibration activities Patrick ROBERT & STAFF Team, LPP 2)
1 14th CAA Cross-Calibration meeting, York, 5-7 Oct 2011 STAFF CAA products & Cross-Calibration activities Patrick ROBERT & STAFF Team 5) STAFF-SC CWF.
STAFF Report Prepared by R. PIBERNE. 2 1.Status of software development 2.Status of Experiment Calibration / Cross Calibration 3.Status of dataset delivery.
CAA/CFA Meeting | CFA Team | ESAC | Octiber CFA Under Development CAA/CFA Meeting ESAC, Oct 11 th 2011 European Space AgencyCFA Team.
WHISPER action items Gábor Facskó, Jean-Gabriel Trotignon,Séna Kougblénou, Xavier Vallières, Guillaume Lointier LPC 2 E/CNRS, Orléans, France 10th CAA.
CAA PEACE Status Iryna Rozum, Andrew Fazakerley, Natasha Doss, Andrew Lahiff, Yulia Bogdanova, Branislav Mihaljčić & the PEACE ops team MSSL 12 th Cross-Calibration.
1 CAA 2009 Peer Review, Jesus College, Cambridge, UK, March CAA Peer Review: Selected Recommendations.
DAA PEACE Status A. Fazakerley, B. Mihaljčić, I. Rozum, A. Lahiff, G. Watson, D. Kataria UCL Department of Space and Climate Physics Mullard Space Science.
9 th CAA Cross-Calibration Workshop, Jesus College, Cambridge, UK, March /17 CAA Graphics: Pre-generated/On-demand Panels and Cross-Calibration.
Prepared by: Jolene S. Pickett, Joanne M. Seeberger, Ondrej Santolíc, Kristine M. Sigsbee, Ivar W. Christopher and Roxane M. Mitten Department of Physics.
CAA 8th Cross-Cal meeting Kinsale (Ireland), 28 Oct 2008 Edita Georgescu EDI Status of Calibration and Archiving Activities.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Cluster Active Archive Status of DWP Activities Simon Walker, Keith Yearby, Hugo Alleyne ACSE, University of Sheffield.
Mullard Space Science Laboratory October 2008 A.N. Fazakerley, I Rozum, C. Anekallu, H. Bacai MSSL-UCL CAA PEACE Team Status.
FGM Report: Extended Mode Processing 22 nd Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox, Cary Colgan (summer.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
10th CrossCal Workshop, L'Observatoire de Paris, France Cluster Active Archive Status of DWP Action Items Simon Walker, Keith Yearby, Hugo Alleyne ACSE,
FGM report 5 th Operations Review of the CAA Elizabeth Lucek, Patrick Brown Chris Carr, Tim Oddy, André Balogh I mperial College London June 9 th 2010.
Cluster Active Archive Science User Working Group (CAASUWG) - update Matt Taylor on behalf of CAASUWG.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Laboratoire de Physique des Plasmas C ROSS C ALIBRATION STAFF R EPORT TH M ARCH 2015 L EIDEN Prepared by R. Piberne & R. Katra Laboratoire de Physique.
CIS Action Items 10 th Cross-Calibration Workshop Observatoire de Paris, Nov
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
FGM Report 17 th Cross Calibration Workshop Chris Carr, Elizabeth Lucek, Patrick Brown, Leah-Nani Alconcel, Barry Whiteside, Tim Oddy, Peter Fox, André.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
1 11 th CAA Cross-Calibration Workshop, Hotel die Tanne, Goslar, Germany 7-9 April 2010 CAA 11 th Cross-Calibration Workshop Hotel die Tanne, Goslar, Germany.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
DAA Status/Progress B. Mihaljčić, A. Fazakerley, G. Watson, C. Anekallu UCL Department of Space and Climate Physics Mullard Space Science Laboratory 21.
WHISPER report whisper team 16th CAA Cross-Calibration workshop Toulouse, France, 7-8 November 2012 CENTRE NATIONAL DE LA RECHERCHE SCIENTIFIQUE Laboratoire.
MSSL * A.N. Fazakerley, I. Rozum, N. Doss, B. Mihaljcic & the PEACE ops team PEACE CAA Action Items Status 11 th CAA Cross Calibration Meeting, 7 – 9 April.
CAA PEACE Status PEACE Operations Team Presented by Iryna Rozum MSSL Cross-Calibration Meeting, Uppsala, Sweden, April 2011.
1 CAA 20 th Cross Calibration Meeting, MPS, Gottingen 16th Oct 2014 CAA Cross Cal Meeting Oct 2014 Pipeline Automation Chris Perry.
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
21st CAA Cross Calibration Workshop Leiden, March 2015 WHISPER report WHISPER team LPC2E/CNRS.
21 th CAA Cross-Calibration Workshop Leiden, Netherlands24-26 March Introduction.
FGM Report 21 st Cross Calibration Workshop Chris Carr, Patrick Brown, Leah-Nani Alconcel, Tim Oddy, Peter Fox Imperial College London 24 March 2015.
14 th CAA Cross-calibration Workshop CIS archiving activities York October 5-7, 2011.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
WHISPER Cross-caibration activities
Cluster Active Archive
ASPOC Presentation for the CAA Operations Review-1 Klaus Torkar and Harald Jeszenszky IWF/OAW Graz ESTEC, May 2006.
16th CAA Cross-calibration Workshop
WHISPER Report Jean Gabriel Trotignon and WHISPER Team
Cluster Active Archive – Wideband data BM2 mode
1. Introduction: general information
20th CAA/DAA Cross Calibration Meeting
EDI – CAA STATUS REPORT EDI CAA Status
CAA-OR (End of Phase 1) CAA DWP Operations Review
H. Rème, I.Dandouras and A. Barthe IRAP, Toulouse, France
Jolene S. Pickett, Joanne M. Seeberger, Ivar W
Annual Report of the DWP Experiment 9th CAA Operations Review
Jolene S. Pickett, Joanne M. Seeberger, and Ivar W. Christopher
Annual Report of the FGM Experiment for the 8th Operations Review of the Cluster Active Archive (CAA) Chris Carr, Leah-Nani Alconcel, Patrick Brown,
10th CAA Operations Review Annual Report of the FGM Experiment
Presentation transcript:

CLUSTER/STAFF DATA at CAA. 11th Cross-Calibration Meeting, 7-9th April 2010, Goslar. C. Burlaud, P. Robert, O. Santolik, N. Cornilleau-Werhlin, P. Canu, Y. de Conchy, V. Bouzid, R. Katra, L. Mirioni. LPP: Laboratoire de physique des plasmas

2 STAFF Report Data production - STAFF-SC - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions Content Data production STAFF-SC STAFF-SA Open action items Cross Calibration workshop 2009 Progress Meeting 4th OR Data delivery plan Conclusions

3 Data production ProductContentLevel Num. of files Produced and Delivered to CAA C?_CP_STA _DWF _NBR/HBR Decommutated Waveform 1 1 file/ 1 sat/ 24h Version Jan to 31 Dec Version Jan to 31 Dec C?_CP_STA _CWF _NBR/HBR Calibrated waveform 2 1 file/ 1 sat/ 24h None STAFF-SC: Both mode STAFF Report Data production - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions

4 Data production ProductContentLevel Num. of files Produced and Delivered to CAA C?_CP_STA _CS _NBR/HBR Calibrated Spectra 2 1 file/ 1 sat/ 24h/3h Version Jan to 31 Dec Version Jan to 31 Dec C?_CP_STA _SC _SPECTRO _NBR/HBR Spectrograms3 1 file/ 4 sat/ 3h 01 Jan to 31 Jul STAFF-SC: Both mode STAFF Report Data production - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions

5 Data production TCOR We are waiting for time calibrated data for Then, DWF and CS will be produced and delivered. New L2 products CWF Validation tests are under-progress. See P. Robert presentation. Difference between version 3 and 2 New dataset headers (ceh format). Completed following cross-cal AI. STAFF-SC STAFF Report Data production - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions

6 Data production STAFF-SA ProductContentLevel Num. of files Produced and Delivered to CAA Science Data C?_CP_STA_AGC_ Automatic Gain Control 2 1 file/ 1 sat/ 24h Version Jan to 30 Oct C?_CP_STA_PSD Power Spectral Density C?_CP_STA_SM Spectral Matrix Auxilliary Data (New) C?_CP_STA_SA_NO TSRP_CAVEATS New NOTSRP Caveat 1 file/ 1 sat/ 24h Version Jan to 30 Oct C?_CP_STA_SA_PS DNEG_CAVEATS New PSDNEG Caveat STAFF Report Data production - STAFF-SC - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions

7 Data production STAFF-SA STAFF Report Data production - STAFF-SC - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions ProductContentLevel Num. of files Produced and Delivered to CAA Science Data (very soon) C?_CP_STA _PPP New Propagation and polarization parameter 3 1 file/ 1 sat/ 24h Auxilliary Data (very soon) C?_CP_STA_SA _MODESA _CAVEATS New MODES CAVEAT 1 file/ 1 sat/ 24h

8 Data production STAFF-SA STAFF Report Data production - STAFF-SC - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions Polarization and Propagation Parameters - Level 3 products - 1file/day/sat - Resolution: Same as SM (L2 products) - New CEF definition: C?_CP_STA_PPP A New frame (B0/MFA) has been requested and added to CAA metadata dictionary. PPP: THSVD, PHSVD, ELLSVD, BSUM, PVSIGN, ESUM. BSUM and ESUM: for plot thresholds to detect significative regions. Input - SM data. - FGM 5VPS in CDF format from CAA. - AUX in CDF format from CAA.

9 Data production STAFF-SA STAFF Report Data production - STAFF-SC - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions Caveats associated to this data: - NOTSRP - PSDNEG - MODE: SA, EFW Y/Z (density mode) Question to EFW team: As electric field components from EFW are used on board to process STAFF-SA electric components, does it happen that EFW Y and Z are in density mode at the same time? Note that from EFW failure, no more data for STAFF- SA products dependant on electric field componants.

10 Data production STAFF-SA STAFF Report Data production - STAFF-SC - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions L CR Wave polar legend: CR: circular right (chorus in the whistler mode) L: linear wave (equatorial noise on the frequency lower than the low hybrid frequency) 90  30  CR // Anti-// Plot example BSUM threshold: 1.0E-07 nT 2 /Hz

11 Open action items Cross-Calibration CC8-AI-45: Open, new date due: ??? Cross calibration study between STAFF-SA and WBD. O. Santolik has been contacted and will work on it. STA08-AI-1-2: Close. PSD negative values have been removed. SM/PSD caveat files: concerning no TSRP (Sun Reference Pulse). This one will also be attached to PPP. SM caveat files: concerning PSD negative values that could be used to calculate the diagonal terms of the spectral matrix. This one will also be attached to PPP. STAFF Report Data production - STAFF-SC - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions

12 Open action items Cross-Calibration CC10-AI-7-8: Open. In progress. A version 02 of CR and UG will be delivered (by the middle of May 2010). STA10-AI-9: Close. O. Santolik has been contacted to introduce FGM 5VPS in prassadco to process L3 new dataset. The software has been tested and validated Progress Meeting STA09-AI: Close. All headers have been completed and re-delivered. STA10-AI-7: Open. UG will be soon updated and a version 02 will be delivered (by the middle of May 2010). STAFF Report Data production - STAFF-SC - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions

13 Open action items Review Board R2a: Open, in progress. STAFF-SA,PPP, L3 One month (02/2001) of STAFF-SA L3 (PPP) will be soon delivered. Still waiting for new disks to upload FGM 5VPS from CAA, to produce L3. STAFF-SC, CWF,L2 -Tests on NBR mode already done. - Lot of CPU required. - Software needs some improvements for productivity. - Tests on HBR mode remain to be done. See P. Robert previous presentation. STAFF Report Data production - STAFF-SC - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration Progress Meeting - 4th OR Data delivery plan Conclusions

14 Data delivery plan Year Product Until now2010 SC DWF SC Complex spectra SC Images08/ SC CWF New NBR expected soon SA AGC/ PSD / SM 01/2001 – 09/ SA Polarisation/ Propagation New 02/2001 expected very soon Planning for the second phase STAFF Report Data production - STAFF-SC - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery planConclusions

15 STAFF Report Data production - STAFF-SC - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions Priority As P. Robert was implied on other projects, priority has been defined on STAFF-SA favor : an intense effort has been done on L3 STAFF-SA delivery, new version L2 STAFF-SA and associated caveats. STAFF-SA A version 04 of L2 has been delivered recently: New headers, psd negative values removed, caveats added. A version 01 of L3 for 02/2001 will be soon delivered to CAA for test ingestion. A new caveat will be attached. We are still working on the definition of this new caveat. Information on EFW Y/Z on density mode needed.

16 STAFF Report Data production - STAFF-SC - STAFF-SC - STAFF-SA - STAFF-SA Open action items - Cross Calibration - Cross Calibration Progress Meeting - 4th OR - 4th OR Data delivery plan Conclusions STAFF-SC Waiting for TCOR 2009 to produce DWF and CS. Still some work to be done to produce CWF. But work in progress. Documentation A big effort to produce updated UG, CR and ICD will be done in April 2010.

17 Orbit position S/C # T 20:00

18 Orbit position S/C # T 22:00