Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong.

Slides:



Advertisements
Similar presentations
Energy Performance Contracts Chip Barnes. What is an EPC? Popular way to obtain infrastructure energy efficiency & operational improvements with: Popular.
Advertisements

Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
Introduction to Performance Contracting. What Is an ESCO? An Energy Services Company helps customers: –Upgrade facilities, including both: Energy efficiency.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Energy Performance Contracting (EPC). Vic Government EPCs since projects covering 745 buildings saving 37% (average GHG saving) and $418 million.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
NJ SmartStart Buildings New Jersey Higher Education Partnership for Sustainability (HEPS) January 20, 2012 Presenter: BPU President Robert Hanna.
1 | Energy Efficiency and Renewable Energyeere.energy.gov DOE Small Business Webinar: Getting Involved with ESPCs May 6, 2013 Chip Goyette ESPC ENABLE.
Energy Efficiency Financing: Which Financial Instruments Can Best Leverage Energy Efficiency Financing Dr. Xiaodong Wang Senior Energy Specialist EASIN,
Clinton Climate Initiative Energy Efficiency Building Retrofit Program Bringing Stakeholders Together April 20, 2010.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Overview of Property Assessed Clean Energy (PACE) Program San Antonio Office of Environmental Policy December 16, 2009.
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
Energy Performance Analysis with RETScreen
1 | ESPC Technical Assistance Team eere.energy.gov Welcome to Today’s Training for State and Local grantees on Energy Savings Performance Contracting:
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
Alabama Department of Economic and Community Affairs.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
There is Much More to Protocols than Good M&V Steve Kromer Chair, IPMVP Inc. Paolo Bertoldi European Commission DG JRC.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Heat Subsidy Shift Program in Russia William U. Chandler Director AISU, PNNL, USA Presented at U.S. Baltic Power Sector Investment Seminar. Vilnius, February.
Scaling Up Energy Efficiency in India
Promoting Energy Efficiency In Buildings in Developing countries.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Demand Side Management The Natural Purview of Utilities The Customer Viewpoint Rates on the Rise in a Rough Economy - Responding to New Realities Marketing.
Background Established by law in 2008 via the Clean and Affordable Energy Act. District Department of the Environment (DDOE) oversees the contract. The.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
Aristotelis Botzios-Valaskakis MSc Mechanical Engineer Division of Development Programmes Building Energy Performance Reliable Predictions ESCO’s point.
Presentation to the: Pennsylvania Public Utility Commission Demand-Side Response Working Group December 8, 2006 Gas Utility Decoupling in New Jersey A.
1 Best Practices for Program Implementation: Lessons from the Geothermal Heat Pump Experience Harvesting Clean Energy Conference.
Phoenix Convention Center Phoenix, Arizona Using Private Financing to Maximize Energy and Cost Savings Track 5: Project Financing Session 7: Economics.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
Practical Problems Experienced with Industrial DSM Projects Marius Kleingeld 15 August 2012.
How to unlock the secrets of decarbonised buildings - what's holding you up? Annual EAUC Conference, March 2010.
ENERGY INSTITUTE KATHOLIEKE UNIVERSITEIT LEUVEN 1/16 Energy Performance Contracting Marcel Didden “Midi de l’éfficacité énergétique” Namur, 12 November.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
NEET Workgroup #3 - Residential Subgroup Snohomish County PUD November 2008.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Energy in a Megacity Future: Role of Financing Dr. Mark Bernstein Managing Director USC Energy Institute University of Southern California.
Energy Services Harsha Holalu Ramakrishna Energy Extension Specialist Department of Mechanical and Aerospace Engineering.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
1 May 10, 2011 Procurement and Financing Options for Facility Improvements Siemens Industry, Inc. Building Technologies.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
Is there a future for ESCOs and DSM models in WBG Ops ?
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
MGT601 SME MANAGEMENT. Lesson 22 Guide Lines for Approaching Lenders – III.
Energy Performance Contracting (EPC)
Fort Stanwix National Monument Energy Audit Contract
Market aggregating models – scaling an EE portfolio
Energy Savings Performance Contracts & Energy Service Companies
EPC CONCEPTS and BUSINESS CASES
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
WHERE THE ESP INDUSTRY MEETS THE FUTURE
The ESCO Retrofit Model Financing energy efficient HVAC improvements through ESCOs Stephane le Gentil - November 2017.
MGT601 SME MANAGEMENT.
Chris Kramer, Energy Futures Group
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
IEA DSM Task XVI Competitive Energy Services India
Training module EPC facilitators A role to play Add date.
Presentation transcript:

Technology and market potential of energy performance contracting for buildings Conference on Pollution Prevention & Energy Efficiency (P2E2) U.S., Hong Kong, China Cooperation 9-10 May 2005 Dr. Sam C M Hui ASHRAE Hong Kong Chapter & Department of Mechanical Engineering The University of Hong Kong Hong Kong

Agenda Introduction to EPC Market Potential Major Barriers and Risks Key Issues Conclusion

Introduction to EPC Energy performance contracting (EPC) = energy savings performance contracting A financing technique to raise money for energy efficiency investments based on future savings Energy service companies (ESCO) Offer EPC services, without upfront capital on building owners (e.g. by guaranteed saving) Become an important trend in many countries like USA and Japan

Basic concept of energy performance contracting (EPC) Before EPCDuring EPCAfter EPC

Introduction to EPC Performance contract Contract with payments based in performance Can be used for energy conservation projects, to mitigate indoor air quality concerns, to reduce water & sewage usage, or to implement renewable energy systems ESCO guarantees and takes the risk of not achieving savings; it is paid back out of the savings (around 4-10 years)

Introduction to EPC Benefits of EPC for a business Reduced risk (contractor guarantees) Turnkey services (contractor provides all services) The business needs less internal expertise Project financing could be ‘off balance sheet’ Advanced products & services can be used Savings can be much higher than done by itself Additional improvements to built environment

Introduction to EPC Typical saving measures include: Energy reduction via equipment retrofitting Such as replace lighting equipment, chillers & boilers Fuel saving measures Such as add window films, insulation or pool cover Load shifting Such as by energy management control systems Modification of operating procedures Water & resource efficiency measures

Introduction to EPC Different ways of structuring such a contract ‘Guaranteed savings’ Most common; length 4-8 years Allow extra measures to be added ‘Shared savings’ The Client & ESCO share the savings; up to 10 years Actual cost not included in contract ‘Pay from savings’ Variation from shared savings; operates like a loan ‘Chauffage’ or full services (ESCO takes over)

Market Potential External factors Large stock of existing buildings (esp. commercial) Energy cost is a concern for developers/owners Savings not difficult to obtain from equipment optimization, retrofitting or retrocommissioning Potential ESCO market In HK, potential market around US$100 million Air-conditioning & lighting are major areas ESCO prefer owner-occupied or single-tenant

Building completed in in Hong Kong

Market Potential Current EPC active players Automatic control companies Building services consultants/contractors Semi-government bodies (e.g. HKPC) Power companies (for demand side management) Private energy/environmental consultants Government energy projects Electrical & Mechanical Services Dept. (EMSD) is active in promoting EPC

Market Potential Prospects Growing concern on energy & environment Achieving sustainable performance! Saving energy & operating costs Policy tools & programmes by government Building energy codes (performance-based), energy labels, pilot renewable energy projects Water-cooled air-conditioning systems (converting of air-cooled systems) Need to maintain & upgrade existing buildings

Major Barriers & Risks Major barriers Weak awareness & experience Skepticism of stakeholders Problems with conventional procurement process Problems with measurement & verification Key factors for successful EPC ESCO has the technical, financial & mgt. skills Customer & ESCO have a partnership Good understanding of project goals

Major Barriers & Risks Typical EPC project stages Stage 1: The opportunity assessment Stage 2: Preliminary energy services Stage 3: Develop detailed proposal Stage 4: Project implementation Stage 5: Performance assurance + M&V services Risks associated with EPC Technical knowledge & management culture Financing risks & guarantees Argument on savings & responsibilities

Key Issues Choosing a contractor Equipment suppliers Best if their technologies are the main measures Fee-based ESCO Best for a wide range of measures or long-term facilities management Utility-based ESCO Best if focus on electricity or gas technologies International energy companies Best for international connection & overseas technology transfer

Key Issues Project financing By the ESCO itself As a loan from financial institution By working together with the client Under adverse economy The client may not have the project capital ESCO need to negotiate with bankers to explore creative financial tools Some clients may want to finance themselves

Financial structure used by ESCO

Key Issues Measurement & verification (M&V) methods Deemed or stipulated savings Payments based on savings estimates, using measurements or audit + equipment characteristics Savings based on utility bills Past energy bills determine baseline consumption Measured savings Compare ‘before’ & ‘after’ measurements M&V options & techniques have matured Guidelines e.g. IPMVP and ASHRAE 14-P

M&V optionAnalysis techniques Partially measured retrofit isolation Engineering calculations using short term or continuous measurements Retrofit isolationEngineering calculations using short term or continuous measurements Whole facilityAnalysis of whole facility utility meter or sub-meter data using techniques from simple comparison to regression analysis. Calibrated simulationEnergy use simulation, calibrated with hourly or monthly utility billing data and/or endues metering. M&V options and analysis techniques

Conclusion EPC is a useful tool for promoting & delivering energy efficiency projects HK & Mainland China have market potential in existing & new buildings Some barriers need to be overcome & suitable skills should be developed locally