SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.

Slides:



Advertisements
Similar presentations
1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
Advertisements

Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
Adil Khan Kyungpook National university Korea-Japan Joint ScECAL Group Meeting kobe University Japan 3 rd September 2010.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
LCG Meeting, May 14th 2003 V. Daniel Elvira1 G4 (OSCAR_1_4_0) Validation of CMS HCal V. Daniel Elvira Fermilab.
Beam test of scintillator strips Miho NISHIYAMA Shinshu University ・ scintillator strip calorimeter ・ Kuraray scintillator strips and KNU extruded ・ the.
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
ScECAL. ScECAL in ILD Tungsten  Sensor unit: scintillator strip + MPPC  45 x 5 x 2 mm3 scintillator strip  1.4 x 1.4 x 0.6 mm 3 MPPC near future 
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Study of the MPPC for the GLD Calorimeter readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group May 29 – Jun 4 DESY Introduction.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
Scintillator-based ILC detector R & D Status and Milestone DongHee Kim Kyungpook National University Joint Korea-Japan Collaboration KPS meeting, Spring.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
June 4, Scint 2007 Scintillators and ILC 1 Scintillator calorimeters at ILC Jaroslav Cvach Institute of Physics ASCR, Prague CALICE Collaboration 1.Accelerator.
KEK BT Summary &Plan Shinshu University Miho Nishiyama.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group (KNU, Kobe, Niigata, Shinshu, ICEPP.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
06 FEB th ACFA Development of fine strip scintillator with extrusion technique SungHyun Chang, DongHee Kim, Jun Suhk Suh, Youngdo Oh, Daejung Kong,
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Jet Energy Measurement at ILC Separation of jet particles in the calorimeter is required for the PFA  Fine granular calorimeter is necessary. Particle.
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
Report on the Beam Test Analysis Satoru Uozumi Apr GLDCAL meeting Topics of this talk are: Comparison of various MIP calibration methods Some problems.
Short Summary of the Japan- Korea KNU Oct GLDCAL meeting S. Uozumi (Shinshu) 3 rd Japan-Korea joint meeting is held on Oct at Kyunpook.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Study and Development of the Multi-Pixel Photon Counter for the GLD Calorimeter Satoru Uozumi (Shinshu, Japan) on behalf of the GLD Calorimeter Group Oct-9.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Tokubetsu-shishin kickoff meeting, Sep-13 th 2011 Satoru Uozumi Korean Activities on Calorimetry in ILC History of Japan-Korea collaboration.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
CEPC ScECAL Optimization for the 3th CEPC Physics Software Meeting
FSC status and plans Pavel Semenov IHEP, Protvino
IHEP group Shashlyk activity towards TDR
ILC Detector Activities in Korea
CLAS12 Forward Detector Element PCAL
Tail-Catcher/Muon Tracker Prototype
Chris Smith California Institute of Technology EPS Conference 2003
ScECAL+AHCAL+TCMT Combined Beam FNAL
Rick Salcido Northern Illinois University For CALICE Collaboration
Testbeam analysis on module #1
Presentation transcript:

SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab

small prototype at DESY 9x2 strips / layer x 26 (468ch) 1cm x 4.5cm x 0.3cm strip fibre in a hole without fibre MPPC read out 9cm MPPC calice08-TT

results at DESY 3 detector configurations stripuniformitylight X-talk Megagood10% direct r/o extrudedneed studygood MPPCMPPC 45mm0mm calice08-TT MIP ped. opt. xtalk. Mega Kuraray KNU with fibre without fibre

extruded scintillator one of the mysteries significant non-uniformity due to TiO2 shield and mis-alignment of fibre and MPPC MPPCMPPC 45mm0mm without TiO2 wrapped by reflector calice08-TT 1mm0mmp.e. uniform strip

modified ext. scint. without TiO2 shield MPPC 1x1 mm 2 fibre 1 mmz mega-strip extruded-strip calice08-TT

energy resolution detector center is a singular point shower leakage without saturation correction calice08-TTall corrections mega extruded direct

MPPC saturation MPPC response saturates by big amount of light input it exceeds the number of MPPC pixels =1600 due to quick recovery 2000p.e. 1000p.e. LED blue light no sign up to 6GeV DESY 1-6GeV 80 MPPCs 1-6 GeV calice08-TT linearity

MPPC saturation saturation correction deposit E / strip response -bigger at EM shower central -energy distribution will be wider than that measured (central part will shift, however others remain) shape of the curve depends on the electronics (integration time,,,) calice08-TT

linearity saturation correction improves linearity before correctionsaturation corrected without/with saturation correction

energy resolution with/without saturation correction saturation correction makes it worse, because of broadening the distribution saturation correction calice08-TTsaturation correction

EM shower shape longitudinal and lateral EM shower shape longitudinal layer # lateral x (cm) x calice08-TT

EM shower width in one dimension x calice08-TT

simulation non uniformity in a strip Xtalk between neighboring strips saturation effect calice08-TT mega direct extruded mega color : data, black : MC

simulation (cont.) closed: data open:MC calice08-TT

scecal FNAL BT x4 bigger ECAL than DESY : prototype 18cm x 18cm x 30 layers (2160ch) extruded scintillators w/o TiO2 shield precise positioning of MPPC monitoring system moved mid August started DAQ calice08-TT

extruded scintillator hole size and location > precise positioning by selection flip Entries 69 Mean RMS Entries 69 Mean RMS hole size hole location calice08-TT 1mm

construction of scecal scintillator fiber reflector frame read out flat cable cover calice08-TT MPPC reflector scintillator fiber reflector MPPC fixed by reflector

pre-test results light output by source calice08-TT Distance from MPPC (mm) Three samples number of p.e xxx MPPC p.e.

μ relative position MPPC and fibre required precision : within 0.1mm in transverse / longitudinal direction m p.e. longitudinaltransverse 1mm

MPPC 2000 MPPC new : May old : Dec 2006 tested, they all Ok for the detector Vbreakdown (V) new old serial number by Hamamatsu new Vb(V) some are missing

prototype scecal structure W 3.5mm scint. 3mm 18 x 4 lows tungsten scintillator strip

monitoring system light injection through clear fiber with notches Optical fiber 0.2mm deep notch0.4mm deep notch LED scintillator strips 0.4mm deep VCALIB:150 p.e. 0.2mm deep VCALIB:255 p.e. strip # holes Optical fiber

FNAL BT purpose test at High energy : MPPC saturation effect verify monitoring system pi-zero reconstruction put an Iron target of 8cm 0.1% of triggers at high E r+ by MC r+r+ r + n 7 pr 0

at FNAL construction test assembly

at FNAL (cont.) pedestals LED run MIP calibration by muon electron pion/proton

calice08-TT