ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.

Slides:



Advertisements
Similar presentations
TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
ELECTRON CYCLOTRON SYSTEM FOR KSTAR US-Korea Workshop Opportunities for Expanded Fusion Science and Technology Collaborations with the KSTAR Project Presented.
Steering Columns.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer June 2007.
Coolant Connections to the DCLL Blanket S. Malang, Dara Navaei, Xueren Wang ARIES Project MeetingARIES Project MeetingUCSD January 23-24, 2012January 23-24,
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintenance and Building Conceptual Approach L. M. Waganer The Boeing Company ARIES Meeting University.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
Status of the Modular and Field- Period Replacement Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and L. El-Guebaly ARIES Meeting.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Summary of Low Cost Fabrication of Integrated Coil Structure L. M. Waganer With Support from Kevin Slattery.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G.
ARIES Meeting, UCSD L. M. Waganer, June 2006 An Approach for Low Cost Fabrication of the Coil Structure L. M. Waganer With Support from Kevin Slattery.
Automated Production Lines
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
Automated HIC assembly A. Di Mauro ITS-MFT mini-week
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 7 Remote Handling Concept Study for the Super-FRS Plug System Luis M. Orona D. Helmut.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
1 Solid Breeder Blanket Design Concepts for HAPL Igor. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
Barrel Calorimeter Support Mechanism Two designs are proposed for review –Design1. Individual module (Segment) of the Barrel Calorimeter is placed inside.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
ARIES Study L. M. Waganer, 9 August Power Cycle Modeling and Cost Validation L. M. Waganer The Boeing Company 7 October 1999 E-meeting.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Page 1 HFP Workshop, RAMI Session, 2-4 Mar 2009k,UCLA Why Is Reliability, Availability, Maintainability, and Inspectability Important to the Future of.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Disk formatting Magnetic disks come in various sizes and so each use different disk drives. Different computers have different ways of organizing data.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
Unit 2, Genkai Nuclear Power Plant
Remote Maintenance for Large Scale Physics Experiments Alan Rolfe 13 th April 2010.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Updates of the ARIES-CS Power Core Configuration and Maintenance
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Update on He3 Services design since the ORNL meeting
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Endcap shielding senarios:
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
Clamping and Boring Tools
Presentation transcript:

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October 2006 PPPL Project Meeting

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 2 Maintenance Design Approach Port maintenance adopted, replacing large blanket and divertor modules Replace all first wall/blanket and diverter modules ECH launchers every 3.0 FPY. Remainder is life-of-plant. –Blanket and divertor modules removable inside core –ECH launcher designed as a removable assembly All power core maintenance fully robotic and automated based on prototypes and production plants Work simultaneously on all three field periods Employ maintenance machines inside fixed port transfer chambers just outside bio-shield Pass all used and new modules via airlocks to mobile transporters If conventional tube welding is used, auxiliary maintenance machines ports are needed. Remote disconnects would cut maintenance time by a factor of 4.

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 3 Compare similar 1950’s and 2000’s technologies and Project into the Future! Automobile Assembly Surgery (knee, hernia, heart, lung ) Vision Correction (glasses vs. laser) Electronics (transistor vs. LSIC) Data Storage (tape drive » floppy drive » hard drive » solid state) (20 yr time span) Deburring movieTool Changer movie How To Forecast Maintenance Technologies Years in Future? Consider physical laws as limiting values

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 4 Mid-Plane View Shows Maintenance At Main and ECH/Aux Maintenance Ports Simultaneous maintenance in 3 FP Fixed Transfer Chambers control contamination and enhance times Mobile Transporters transfer used and new components to/from Hot Cell Main Port is used for removing blanket and divertor modules ECH launcher/waveguide removed as an assembly ECH port can then be used as Auxiliary maintenance port Manipulators inside Bioshield at center of power core remove divertor inner tubes and shielding and cut outer divertor tube/support

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 5 Example of Pallet Transfer Technology for ECH Module Assembly We may want to adapt a conveyor approach similar to the efficient pallet handling transfer system used in freighter aircraft, C5, C17, C141, et. al.

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 6 Removable ECH Assembly at 35º Port ECH Waveguide, 0.54 m H x 0.24 m W Opening in VV and Coil Structure, 1.54m H x 1.24 m W Opening through Bioshield, 1.6 m H x 1.6 m W Note: Removable ECH Module includes Waveguide, All Shielding, Bioshield, Mirror, and Exo-Bioshield Vacuum Vessel Permanent Transfer Chamber

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 7 Extraction of ECH Assembly Into Transfer Chamber Maintenance machine removes waveguide segment and coolant coupling Complete assembly removed into Transfer Chamber by pallet system

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 8 ECH Module Moved Into Mobile Transporter for Transit to Hot Cell for Refurbishment

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 9 ECH/Aux Port Maintenance Actions Removes blanket shielding blocks, shielding rings, and cuts coolant tubes while main port arm supports and removes blankets

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 10 View of Main Port (0º), Operational

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 11 Initial Position of Extractor Machine This is the position of Extractor after plasma shutdown and cool-down

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 12 First Action Is To Remove Bioshield Door After the door is positioned inside Transfer Chamber, bridging structure is positioned Vacuum vessel door and port shielding is removed and set aside inside Transfer Chamber

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 13 Removal of Port Manifold/Structure The manifold/hot structure connections are disconnected and the structure is removed and set aside

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 14 Removal of Port Blanket and Shield This port blanket and shield module is the largest component to be removed It is also the only module that has an integral shield It is sized to clear port opening and provide maximum access to interior of power core

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 15 Design Approach to Extract Inner Coolant Tube and Shielding to Access Welded Joint If welded joints are to be used to secure outer divertor coolant tubes, joint must be shielded Entire inner tube and shielding assembly is removed allowing access to outer tube weld region Access is from outside of coil structure near center of machine

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 16 Removal of Divertor Tubes and Shielding The inner tubes and shielding for the Divertor plates are removed by floor and ceiling mounted manipulators (24 places at ± 12.5 ° ) This is done simultaneously with ECH assembly removal and main port opening procedures

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 17 Preparation for Divertor Plate Removal This depicts the main port Extractor holding the Divertor Plates (24 pl) while the cutting bore tool on the central manipulator severs the outer coolant tube, which is the Divertor structural support The Diverter plates span two blanket modules but they fit through the main port opening

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 18 Divertor Plate Removal This view shows the removal of the Divertor plates After removal, they are moved to the Hot Cell via the Mobile Transporter During this step, the inner manipulator can be removing other coolant tube assemblies

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 19 Removal of Blanket Modules This is a typical procedure for removal of the blanket modules The Blanket modules are attached to the Hot Shield with four fasteners deep within the blanket close to the Hot Shield Tools disengage the fasteners while gripping the walls of the access holes, thus providing holding force for fastener removal and blanket handling

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 20 Removal of Blanket Module (Cont’d) Blanket module is being removed from Power Core and placed in Mobile Transporter As soon as this module is moved from its position on the Hot Shield, the Auxiliary Manipulators can begin to remove the shield blocks and shield rings for access to and severing the Blanket coolant tubes

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 21 Maintenance and Availability Analysis

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 22 Alternative to Cutting and Welding Blanket Coolant Tubes Current Technology Embed shielding blocks and rings to protect weld region Time-consuming procedure that generates contamination Proposed Future Technology Remotely operated coolant clamp, Marmon type? Clamp and actuating mechanism can be replaced during refurbishment period Eliminates need for auxiliary port and equipment Reduces core maintenance time by factor of 4

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 23 Maintenance and Availability Analysis

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 24 Maintenance Slides for Engineering Summary

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 25 Maintenance Design Approach Port maintenance adopted, replacing large blanket and divertor modules Replace all first wall/blanket and diverter modules ECH launchers every 3.0 FPY. Remainder is life-of-plant. –Blanket and divertor modules removable inside core –ECH launcher designed as a removable assembly All power core maintenance fully robotic and automated based on prototypes and production plants Work simultaneously on all three field periods Employ maintenance machines inside fixed port transfer chambers just outside bio-shield Pass all used and new modules via airlocks to mobile transporters If conventional tube welding is used, auxiliary maintenance machines ports are needed. Remote disconnects would cut maintenance time by a factor of 4.

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 26 Mid-Plane View Shows Maintenance At Main and ECH/Aux Maintenance Ports Simultaneous maintenance in 3 FP Fixed Transfer Chambers control contamination and enhance times Mobile Transporters transfer used and new components to/from Hot Cell Main Port is used for removing blanket and divertor modules ECH launcher/waveguide removed as an assembly ECH port can then be used as Auxiliary maintenance port Manipulators inside Bioshield at center of power core remove divertor inner tubes and shielding and cut outer divertor tube/support

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 27 Removable ECH Assembly/ Auxiliary Maintenance Port Removable ECH Module includes Waveguide, All Shielding, Bioshield, Mirror, and Exo-Bioshield Vacuum Vessel Entire module assembly can be withdrawn into Transfer Chamber Permanent Transfer Chamber Aux Manipulator removes blanket shielding blocks, shielding rings, and cuts coolant tubes while main port arm supports and removes blankets ECH Module Moved Into Mobile Transporter for Transit to Hot Cell for Refurbishment

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 28 Preparation for Divertor Plate Removal This depicts the main port Extractor holding the Divertor Plates (24 pl) while the cutting bore tool on the central manipulator severs the outer coolant tube, which is the Divertor structural support The Diverter plates span two blanket modules but they fit through the main port opening

ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 29 Maintenance and Availability Analysis