- 1 - TTA View of Budget & Secretariat Functions March 28~29, 2012 (Tokyo, Japan) TTA.

Slides:



Advertisements
Similar presentations
1 Terms of Reference for the GEO Executive Committee Note: These Terms of References were approved at GEO-6 Helen Wood, GEO Secretariat Director.
Advertisements

Transition Planning The Secretariat is directed to prepare initial GEO transition documents for consideration at GEO-6 to provide for the following elements:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
Proposal to Establish a REPARIS Secretariat Vienna March 16, 2006.
EMODNet Lot 4 - Chemistry Overview, management and administrative issues Alessandra Giorgetti (OGS) with the contribution of Altenburger Alessandro, Brosich.
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
Follow-up to the Sixth Round of mutual evaluations November 2014 Rome 43 rd Plenary Meeting of the European Judicial Network.
Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, 2.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
The URBACT II Programme General Presentation Vilnius, 20 January 2011.
M2M Global Initiative OneM2M April 24, 2012
SC Websites Training of webmasters end of March/ beginning of April Validation of content in April Launching in May/ June (at the end of March, the hosting.
Ministerio de Relaciones Exteriores República de Colombia.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
BRIEF ON THE WORK OF THE EACO WORKING GROUP 4 ON POSTAL SERVICES DEVELOPMENT AND REGULATION By MATSIKO Gonzague – WG4 Representative.
THE INTER-AMERICAN UNION OF ELECTORAL AUTHORITIES.
NEW INITIATIVES. TWINNING PROGRAM  To exchange of best practices via member-to- member technical engagement  Competitive small grants program funded.
*The views expressed in this presentation are those of the presenter’s and do not necessarily represent the views of the U.S. Food and Drug Administration.
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
3rd WG meeting, Brussels Proposed Plan for Governance of the Washington Group Prepared by: Jennifer Madans, Barbara Altman, Beth Rasch (USA); Renée Langlois.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed draft.
Strategic Plan th October Management and Governance “GeSCI’s corporate structures and management arrangements were appropriate for.
SCFAH r1 Title: Working Draft “Ad-Hoc Recommendation to SC on 3GPP2 Future” Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
Preparations for First Asian Ministerial Conference On Sendai Framework for DRR Presented in 1st IAP Meeting 3-5 June, 2015, Bangkok K.K.Pathak Joint Secretary.
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
FAO/WHO CODEX TRAINING PACKAGE SECTION TWO UNDERSTANDING THE ORGANIZATION OF CODEX Module 2.5 How do Codex Committees function?
Overview of the 11 th CJK IT Standards Meeting (CJK-11) ARIB, TTC 1 M2M Meeting of Potential Consolidation Partners # March 2012 in Tokyo, Japan.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Budapest 23/08/2001 Development of a Regional Focal Point for Animal Genetic Resources : the European example. Dominique PLANCHENAULT Louis OLLIVIER.
African Centre for Statistics United Nations Economic Commission for Africa Conclusions and Recommendations of the Friends of the Chair of the CSC Secretariat.
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
1 Phase 2 Grant Renewals - March A- Overview A.1- Performance-based Funding Y1Y2Y3Y4Y5 Proposal Initial Grant Agreement(s)Extension of Grant.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
FDA Public Meeting Preparation for the ICH Meetings in Tokyo, Japan, Including Progress on the Common Technical Document and Possibilities for New Topics.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP7 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
Evaluation Criteria and Traffic Models Status Update Farooq Khan IEEE Interim Meeting Garden Grove, CA, USA May 10-13, 2004.
VICH Training Strategy Steven D. Vaughn, DVM Director, Office of New Animal Drug Evaluation, Center for Veterinary Medicine U.S. Food and Drug Administration.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Page 1 3rd SAICM EU-JUSSCANZ Regional Meeting Paris, France February 12, 2008 Developing Reporting Modalities for SAICM Implementation.
Towards new international labour standards for domestic workers The second discussion (June 2011)
Jeju, 13 – 16 May 2013Standards for Shared ICT oneM2M Project Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman Document No: GSC17-PLEN-38.
ATIS’ Machine-to-Machine (M2M) Activity
Summary of the Outcomes of the 1st AfriGEOSS Steering Committee Meeting Humbulani Mudau DST, South Africa 1st AfriGEOSS Symposium 27 – 29 April 2016.
WECC MAC Committee Update
Status report on CJK NGN Working Group
Proposed Organisation of Evaluation of the Romanian NSRF and Operational Programmes, Niall McCann, Technical Assistance Project for Programming,
Tools for preparing, submitting and tracking Proposals to WTSA-16
Secretariat Proposal Update
COSCAP-SEA Work Programme Discussion Paper 3
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Status report on CJK NGN Working Group
EC-68 DOC 16.3 GOVERNANCE REVIEW
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
SOCIAL DIALOGUE WITHIN EUPAN
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
CEOS Organizational Matters
ATIS’ Machine-to-Machine (M2M) Activity
The 17th ABU Copyright Committee July 19, 2011
Presentation transcript:

- 1 - TTA View of Budget & Secretariat Functions March 28~29, 2012 (Tokyo, Japan) TTA

- 2 - oneM2M Secretariat Functions Since 3 rd M2M consolidation meeting held at Berlin, ad-hoc and tele- conferences participants made consensus that oneM2M secretariat must be operated cost effective (low cost minimal secretariat), efficient and ensure quality documents, fairly and equally funded by the partners/companies (cost split basis) Considering cost effective operation, the secretariat resources should be minimized especially at the initial stage. In the light of the above statements, TTA is a view of that – The secretariat provides onsite support maintains and updates meeting requirements documentation recommends host of meetings – The host partners accommodate the meetings based on regional balance(Europe, America and Asia)  Works of the host partner’s functions can be solved through regional consensus such as European Friends and Asia Friends.

- 3 - Considerations for budget - Date, time and duration ? - Location and the number of meetings for 2012 and further ? -Number of participants and members ? -Staffing models -Funding model ? (contribution/fees for meeting/services/distribution)

- 4 - Steps in preparing a Secretariat function APRMAYJUNJULAUGSEPOCTNOVDECJANFEBMARAPRMAYJUN Technical Plenary Meeting#1 Steering Committee Meeting Working Group Meeting Launching - continue to identify and simulate funding model - continue to identify, propose and setup the both secretary office and budget based on member’s best interest model -Identify and project a reasonable and the maximum budget for the coming year. Provisional secretariat function

- 5 - Proposed Structure Steering Committee Technical Plenary Working Group 1 Working Group 2 Working Group N … Resource coordinator (Temp)