Square Foot vs. Segregated

Slides:



Advertisements
Similar presentations
COST DRIVERS The budget is a plan that links government services with their financing. There are factors that powerfully influence the cost of providing.
Advertisements

Company Profile National specialized in steel-House technology exploitation, designing, construction, National has had invested 2 million USD at first.
AssessPro 4.1 & Marshall-Swift ® Patriots AssessPro allows the user to calculate multiple values based on the three approaches to value. The system stores.
Handheld Contact Wireless syncing ACT! Blackberry and Windows Mobile 5/6.
CBO CNF Manual. About CBO  CBO extensive information of product.  Easy to understand interface so that anyone will be able to use it without major training.

AACS Petrol &Convenience Business Acumen Program.
1 FY 2004 Performance Management Plan Presentation Conduct Fire Prevention Services Team Members: J. P. McCabe, P.E. Fire Marshal, DFM, ORS Samuel A. Denny,
1 The Cost Approach An introduction Wayne Foss, MBA, MAI Wayne Foss Appraisals, Inc.
SWE Introduction to Software Engineering
3/20/20071 IT Strategy and Leadership in Higher Education: Two Case Studies Case 1: Roberts Wesleyan College. Presented by Pradeep (Peter) Saxena, CIO.
STANDARDIZATION It’s Not a Bad Word!. Before Standardization Between 4 Adult Schools, CBET Classes and Offsite Classes, ALL ESL classes had different.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Powerpoint Templates Page 1 Powerpoint Templates Increasing Sales with Construction Monitor.
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
Real Estate Principles and Practices Chapter 15 Property Management © 2014 OnCourse Learning.
Why Annual Revaluation? 8/28/ What We Will Cover What is the Assessor’s job? Why do we have property tax? Brief history of property tax. What is.
DYNAMICS CRM AS AN xRM DEVELOPMENT PLATFORM Jim Novak Solution Architect Celedon Partners, LLC
INTERNATIONAL LABOR STANDARDS
Clinton Foundation. Key Messages MRV Systems need to deliver more than emissions estimation – they must help governments deal with issues that matter.
ITOM 2308 Introduction to Databases Review Access Database Corporate Case Study ITOM 2308 Class 81.
Changes to Covenants since 2013 Members meeting This details changes made since the 2103 Homeowners meeting based on Lawyer review of document.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Evaluation and Recommendation of a Flow Computer For Replacing Chart Recorders ETM 5121 Project Proposal Submitted By Toby O’Brien.
Wes Marshall, P.E. University of Connecticut March 2007
Supplementary Specifications (Chapters 20,22 - Requirements Text) 1.
CS 474 Database Design and Application Terminology Jan 11, 2000.
Concurrent Engineering & Teamwork.  Project management is the planning, scheduling, and controlling of those activities that must be performed to achieve.
111 Notion of a Project Notes from OOSE Slides – a different textbook used in the past Read/review carefully and understand.
Microsoft ® Office Access ® 2007 Training Build a database I: Design tables for a new Access database ICT Staff Development presents:
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Lina Bellman & Peter Öhman How authorized property appraisers perceive information for valuation of commercial properties: a repertory grid study Presentation.
Staff Council 27 January 2011 Joeann Humbert Organizational Development, HR Sarah Pillittere Center For Professional Development, HR 1 Leadership Academy.
Assessing the influence on processes when evolving the software architecture By Larsson S, Wall A, Wallin P Parul Patel.
Sustainable Energy Utility B.C. Ground Water Association March 30 th,2007.
© 2008 Pearson Prentice Hall 8-1 Chapter 8: Organization Structure and Control Systems PowerPoint by Hettie A. Richardson Louisiana State University.
Streamlining – The Need: Costs Saved and Lessons Learned Facilitating Disaster Preparedness, Response & Recovery.
Linda Brown RES CAE Real Estate/Land Records Manager Buncombe County Income Approach: Before Appeals.
CS223: Software Engineering Lecture 2: Introduction to Software Engineering.
Introducing The Cost Approach
Real Estate Principles and Practices Chapter 15 Property Management © 2010 by South-Western, Cengage Learning.
STEM at the Academics and Career Center A report of the ACI STEM Task Group to the School Board February 14, 2008 Arlington Public Schools.
Welcome to Family Home improvement Find the great appraisal for Exterior and Interior renovation to your home, bathrooms, windows, Kitchens. Have a look.
The Village of Bronxville, NY Property Revaluation Presented by Eugenia H. Flynn, ASA Northern Region Appraisal Operations Manager.
Leadership Launch Module 11: Introduction to School Wide Information System (SWIS) and the Student Risk Screening Scale District Cohort 1 1.
PowerScheduler Creating a Load Only Scenario. Characteristics of Load Only Current Master Schedule serves as the Master Schedule for next year Much quicker.
Reference Documents4.6fi_12.1 Chapter 12 Reference Documents During the normal course of business, repetitive periodic accounting transactions must be.
Wildfire Costing (WFCST) for Recorders A component of Wildfire One Fire Season 2016.
Lower Lakes Towing – Prophix story
Direct Capital Value Comparison (Sales Comparison Approach)
Large-Scale Incident Management
PastPerfect.
The Impact of Information Technology on the Audit Process
Budgeting: Estimating Costs and Risks
The Cost Approach.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
Pass Cisco Exam with Valid Exam Question Answers - Dumps4download.co.in
Northern Oil & Gas – Prophix story
Libya Higher Education Forum A vision for new systems
The Impact of Information Technology on the Audit Process
Budgeting: Estimating Costs and Risks
Crawford Electric Supply – Prophix story
Arizona House Calls CareLink
Arizona House Calls CareLink
10 The Cost Approach—Part I: Reproduction/Replacement Cost
Database Systems Instructor Name: Lecture-2.
Project Management How to access the power of projects!
LARIMER COUNTY ASSESSOR
Program Director In-Service Training
Presentation transcript:

Square Foot vs. Segregated Cost Approach Square Foot vs. Segregated

A difficult decision Sets the direction for the next 20 plus years The investment costs related to the direction The time frame to complete the required work The level of commitment from: The administration The leadership The staff

MC COST HISTORY 2013 Conversion From DOR Cost to “AZ (Arizona) MVP SEG” AZ MVP SEG = Marshall Valuation Segregated Cost With Added Arizona Components Problem: Segregated Cost Was Complex; Difficult to Teach and Learn Solution: MC Created Templates for AZ MVP SEG to ID Base Cost Components, Limit Component Adjustments and Add-Ons. Result: AZ MVP SEG With Templates Is MC’s Attempt To Simulate M&S Commercial Engine (Square Foot Method)

The Segregated method Vision System Cost Conversion Unbundle AZ MVP SEG Base Component Templates Using AZ MVP SEG In Vision: No More Templates Will Be A True Segregated Cost System Every Property Component Identified And Listed Per Brown M&S Book

THE SEGREGATED METHOD PROS Detailed Component Information Property Specific More Adjustments Possible For Unique Property Attributes The specific components create a more detailed account of what the property has in terms of the improvement.

THE SEGREGATED METHOD CONS Complex DOR Discussion About Segregated Cost (2003): Marshall & Swift designed it primarily for use on large, complex buildings that require a great deal of component detail for an accurate cost value. Because of this, the system is more sophisticated than needed for most residential and commercial structures. This has resulted in a steep learning curve for new appraisers and extended time at the property to gather data and fill out listing forms. Back at the office, this means more work and more chance for input error by data entry personnel.

The square foot method Marshall Commercial (Square Foot) Engine Would Be Called AZ (Arizona) AZ MVP Square Foot AZ MVP Square Foot Includes The AZ Components Includes Base Components for All Occupancies Permits Select Property Add-Ons And Adjustments No Need To Create Templates; Already Built Into System

Arizona Components Golf Course (from an Executive Course to Championship Course) Golf Course specific items such as lake liners, shelters and lighting Mobile Homes Agricultural Tree Crops such as apple, citrus, olive etc. Agricultural specific items such as feedlots, sun shades, sprinklers etc. Approximately 53 items

THE SQUARE FOOT METHOD PROS CONS Easier for staff to understand relationship between select components/add-ons and value Less time in field identifying components Fewer errors in component data entry CONS Cannot account for property peculiarities or uniqueness because the system develops cost for typical construction The square foot method is more general due to less detail listed on the cost approach

TIMELINE

conclusions This was a significant decision that effects the future of the office. This decision will keep the office moving in the same direction as the assessment authorities across the country. We will be adjusting our training to accommodate the new direction. A review of the existing segregated has begun to verify which segregated components are part of the square foot method and which components are required to be adds to the occupancies.

Questions