Cost Impacts of Cycling Coal-Fired Power Plants

Slides:



Advertisements
Similar presentations
An Introduction To Marine Steam Propulsion Plant [Source: US Navy]
Advertisements

Mathieu Lucquiaud, Hannah Chalmers, Jon Gibbins
CONTROLS OF SUPER CRITICAL BOILERS
Steve Moorman Mgr Business Development, Advanced Technologies Babcock & Wilcox CO2 Emission Reduction from Coal Fired Plants FutureGen 2.0 CO2 Capture.
MAINTENANCE DEPARTMENT Presented by: John Argabright, Maint. Supervisor Muskingum River Plant APP Site Visit October 30 – November 4, 2006.
Financial Model.
Engineering Technology Division
Technical Conference Avoided Cost Modeling January 6, 2015.
THERMAL POWER PLANT.
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
SBREFRA Presentation Wayne Penrod Executive Manager, Environmental Policy Sunflower Electric Power Corporation.
Robert G. Ethier, Ph.D. Director, Market Monitoring May 5, 2004 ISO New England State of the Market Report 2003.
SWOT Analysis of Supercritical & Ultra-Supercritical Power Plants Strengths: High Thermal Efficiency Environment Friendly Significant breakthroughs in.
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Reading: Cengel & Boles, Chapter 9
Steam Power Plant.
I/O Curve The IO curve plots fuel input (in MBtu/hr) versus net MW output.
References : PartA Ch.2 Sec.2 [5.6] PartA Ch.3 Sec.6 TNS 05 Boiler surveys.
EE 369 POWER SYSTEM ANALYSIS
Lecture 16 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
POWER PLANT.
POWER GENERATION TECHNOLOGIES
System Planning & Operations Spring 2010
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
Least Cost System Operation: Economic Dispatch 1
Exergy Analysis of STHE P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Formalization of Thermo-economics…..
Engineering Technology Division
Gas Turbine Power Plant
The Technical &Economical Impacts of the Upgraded Rehab Power Plant in Jordan Eng. Mamoun Shehadeh Operational Planning Department National Electric Power.
STUDY OF BOILER’S ACCESSORIES
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
Lecture Objectives: Continue with power generation Learn basics about boilers and furnaces.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Shutting Down Nuclear Power Plants: Economic and Environmental Impacts 15 June 2011 Professor Paul Fischbeck Carnegie Mellon University
Objectives -Discuss Final Project -
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
11. 2 Steam Energy Energy that comes from the push of steam.
Optimizing Deployment of CCGT Duct Firing Capacity in the Nodal Market Josh Clevenger Brazos Electric Cooperative.
PJM©2008 Potential Effects of Proposed Climate Change Policies on PJM’s Energy Market Paul M. Sotkiewicz, Ph.D. Senior Economist PJM Interconnection Organization.
1 System planning 2013 Lecture L9: Short term planning of thermal systems Chapter Contents: –General about thermal power –Production cost –Start.
STEAM POWER PLANTS.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Energy Management and Planning MSJ0210 Energy generation 2 Eduard Latõšov.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Folie 1 Financing Concentrating Solar Power - Subsidy or Investment? Franz Trieb Stuttgart,
Thermal Power Station.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
PSP Thermal stations. Thermal plant Electric power generation system block diagram Electric power generation system block diagram Steam station Major.
BOILER HOUSE CONDENSOR SHAFT PUMP CLEAN WATER IN THE BOILER THERMAL POWER STATION FUEL OR GAS STEAM TURBINE GENERATOR.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
EGEE 102 – Energy Conservation And Environmental Protection Energy Efficiency.
Prof. D.N. Reddy Director Centre for Energy Technology and Principal University College of Engineering Osmania University Hyderabad – 7. THEME PAPER ON.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
A Presentation on THERMAL POWER PLANT Sunil Kumar M.E. (5TH)
Some University Economizer City Plan: Introduction; Steam generator components; Economizer; Advantages of economizer; Boiler economizer; Сonstruction.
Gas Turbine Power Plant
Calculation of Payments for Renewable Energy Systems
ME 312 PPE POWER SYSTEM ANALYSIS
Simple Thermal Power Plant
Managing Director (Bajaj Power Ventures Ltd)
EE 369 POWER SYSTEM ANALYSIS Lecture 15 Economic Dispatch Tom Overbye and Ross Baldick 1.
THERMAL POWER PLANT.
Construction and simulation of robust electric power futures
Unit 2 Changes in Matter 1.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
THERMAL POWER PLANT.
Presentation transcript:

Cost Impacts of Cycling Coal-Fired Power Plants 33rd USAEE/IAEE North American Conference Pittsburgh, PA October 27, 2015

Key Takeaways Operation of existing coal units at partial load factor negatively impacts heat rate, which increases fuel costs. Operating at 50% load factor increases heat rate by nearly 10%. Units designed for a single annual cold start can expect a cost of ~$13-14k/MW for this cold start. However this cost per start could increase by 14-29% for coal units that do a monthly cold start. This is due to increased fuel usage for startup, and increased failure/inspection costs for mechanical components. This increase in fuel use, O&M costs is sufficient to force otherwise profitable existing coal units to (or beyond) the margin in PJM during periods of low gas price, such as shoulder months.

Study Objective Identify which mechanical components in the power plant are most susceptible to early failure (and replacement) due to more frequent ramping and starts/stops. The cost of these components will be developed, and the frequency with which these need to be replaced should also be identified. This information should be reflected in an updated O&M cost ($/MWh basis) for a typical existing coal unit. Evaluate the impact that ramping/load following has on heat rate. This revised heat rate should be used to reflect an updated fuel cost ($/MWh basis) for a typical existing coal unit. Since the extent to which existing coal units will be load following in the future is unknown, consider a range of outputs (percentage of maximum annual kilowatt-hour production) and to reflect the reduction in revenue resulting from being on (or near) the margin.

Time Between Replacement/Major Repair (Years) Component Time Between Replacement/Major Repair (Years) Replacement/ Major Repair Cost (1000$/MW) Annual (Routine) Maintenance and Inspection Cost (1000$/MW/year)   1 Start 6 Starts 12 Starts Coal Pulverizer 6 5 4 1.33 0.92 1.0 Steam Drum Annual maint. only N/A 1.8 2.2 Boiler Refractory 1.5 Superheater/Headers/Tubes 10 9-10 8-10 8-30.6 0.067 0.080 Reheater Tubes 10-23.3 Economizer Tubes 9 8-9 7-8 5.0-10.0 Lower Furnace Tubes 7-9 6-8 0.15-1.05 Windbox Supports 0.33-0.50 Feedwater Heaters 15-20 18 15 0.67-4.33 0.25 Boiler Feed Pumps 0.50 0.30 Steam Turbine Generator (STG) 0.030 Minor Overhaul 2-4 2-3 0.53 Major Overhaul 5-10 5-8 Admission Valves Incl. in minor overhaul cost Incl. in STG cost Turbine Rotor Incl. in major overhaul cost LP Turbine Blades Generator

Change in Heat Rate as a Function of Load Factor

Maintenance and Startup Fuel Cost as a Function, per Start

Annual Maintenance and Startup Fuel Cost as a Function of Startup Frequency

Total Annual Fixed O&M and Startup Fuel Costs

Impact of Capacity Factor Reduction Strategy on Fuel, O&M for a Single Cold Start If a single annual cold start is expected, cheaper to shut the unit down and restart when needed, instead of operating at partial load factor.

Impact of Capacity Factor Reduction Strategy on Fuel, O&M for Multiple Cold Starts Combined effects of heat rate degradation due to frequent starts/stops or partial load operation, combined with increased O&M/maintenance costs, can negatively impact dispatch costs of existing coal units

PJM Dispatch Curve (5-22-15) Average gas price: ~$2.50/MBtu Existing coal units have reasonably economic dispatch position

PJM Dispatch Curve (5-22-15) Average gas price: ~$2.50/MBtu Additional cost of $4/MWh from increased starts/stops pushes otherwise profitable coal units to the margin. More frequent stops/cold starts negatively impacts heat, which adds fuel cost, and increases maintenance costs from added wear-and-tear on susceptible components.