Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.

Slides:



Advertisements
Similar presentations
Trading & Settlement Code modification Mod 21 / 12 Amendment to Available Transfer Capacity (ATC) definition.
Advertisements

Sharing of ISTS Charges & Losses Regulation
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
ERPC, Kolkata.  Definition and Concepts  Standards and regulation for TTC calculation  Calculation of TTC  Challenges in calculation of TTC  Way.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
Central Electricity Regulatory Commission (Grant of Regulatory Approval for execution of Inter-State Transmission Scheme to Central Transmission Utility)
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Available Transfer Capability Determination Chen-Ching Liu and Guang Li University of Washington Third NSF Workshop on US-Africa Research and Education.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Module on Computation of PoC Transmission Charges
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Billing, Collection and Disbursement Procedures
OSC Meeting April 27, Transmission Cost Allocation Overview.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
CERC (Power System Development Fund) Regulations 2010.
ISO Comparison – CAISO Alex Lee (ERCOT)
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Sharing of Inter-State Transmission Losses 11/29/
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Regulatory Framework in Indian Power Sector Module C5 V K Agrawal ED, NLDC POSOCO.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Open Access In Interstate Transmission system Principal Regulation 2008( 25 th Jan’2008) Amendment Regulation 2009(20 th May’2009) Order-Removal of difficulties,(28.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Settlement system for Collective Transactions (Power Exchange)
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
A PRESENTATION.  CHAPTER VI of SEZ Act  Special Fiscal Provisions for Special Economic Zones  26. (1) Subject to the provisions of sub-section (2),
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Project WECC-0100 Standards Briefing WECC-0100 SDT April 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Interstate Transmission system
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
ISO New England System R&D Needs
Congestion regulations
Project WECC-0100 Update Load Modeling Task Force
DEC System Voltage Planning - June 2018
Project WECC-0100 Update Load Modeling Task Force
JUSTICE ADMINISTERED FUND BILL [B ] BRIEFING OF THE SELECT COMMITTEE ON SECURITY AND JUSTICE ON 8 NOVEMBER 2016.
National Institute of Wind Energy(NIWE)
Presentation transcript:

Congestion regulations

Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area transmission system available for scheduling commercial transactions (through long term access, medium term open access and short term open access) in a specific direction, taking into account the network security. Mathematically ATC is the Total Transfer Capability less Transmission Reliability Margin.

“Congestion” means a situation where the demand for transmission capacity exceeds the Available Transmission Capability; “Congestion charge” means the supplementary charge kicked in on one or more Regional entities in one or more Regions for transmission of power from one Region to another or from one State to another within a Region when the deviations from the schedule cause the net drawal of power in the inter-regional or intra- regional transmission links to go beyond the Total Transfer Capability limit;

“Control area” means an electrical system bounded by interconnections (tie lines), metering and telemetry, where it controls its generation and/or load to maintain its interchange schedule with other control areas whenever required to do so and contributes to frequency regulation of the synchronously operating system; “Credible contingency” means the likely-to-happen contingency, which would affect the Total Transfer Capability of the inter-control area transmission system; (g) “Regional entity” means such persons whose metering and energy accounting is done at the regional level;

“Transmission Reliability Margin (TRM)” means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (i) “Total Transfer Capability (TTC)” means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency.

Power System model to be considered for simulation studies. EHV transmission network shall be normally modeled down to 220 kV level with exceptions for generating units connected at 132 kV and for North Eastern Region, it shall be modeled down to 132 kV Normally all generating units greater than 50 MW and connected at 132 kV and above shall be modeled. Smaller generating units (particularly hydro units) may be lumped for study purposes Load shall be generally lumped at 220 kV or 132 kV, as the case may beActual system data wherever available shall be used for power system modeling.

In cases where data is not available, standard data as given in the CEA Manual on Transmission Planning Criteria shall be considered. The SLDC may consider lower voltage level and smaller units if required. Separate base cases calculating the export and import capability corresponding to both peak and off- peak load and generation with the likely scenario during the time frame for which transfer capability is to be assessed shall be used in the Simulation Studies for calculation of TTC and TRM of the required transmission corridors.

. Calculation of Total Transfer Capability (TTC), Available Transfer Capability (ATC) and Transmission Reliability Margin (TRM) 1) The National Load Despatch Centre shall asses the Total Transfer Capability (TTC), Available Transfer Capability (ATC) and Transmission Reliability Margin (TRM) of inter-regional links / Corridors in consultation with Regional Load Despatch Centers, and revise, if necessary, the TTC, ATC and TRM declared by the (Central Transmission Utility (CTU)

TTC, ATC, and TRM along with the details of basis of calculations, including assumptions if any, shall be put up on the website of NLDC and RLDC at least three months in advance. The specific constraints indicated by the study would also be put on the website.

(3) Regional Load Despatch Centres shall assess Total Transfer Capability (TTC), Available Transfer Capability (ATC) and Transmission Reliability Margin (TRM) of individual control areas within the Region, if required, and the same would be put on the website of respective RLDC, along with the details of basis of calculations, including assumptions if any, three months in advance. The specific constraints indicated by the study would also be put on the website. Provided that the NLDC shall perform transmission system reliability studies for the summer, monsoon, winter and pre-winter/post winter (when the all-India demand is least) scenarios for peak and off-peak, to determine the TTC of its system. The worst credible contingency shall be studied to ensure equipment loadings, voltage stability, and transient stability.

Provided further that National Load Despatch Centre (NLDC) and/or concerned Regional Load Despatch Centre (RLDC), may revise the TTC, ATC and TRM due to change in system conditions, which includes change in network topology or change in anticipated active or reactive generation or load, on account of outage or otherwise, of one or more generators or transmission lines, at any of the nodes in the study.

Such revision should clearly state the reasons thereof. The TTC, ATC and TRM may again be revised on the day-ahead basis depending on system conditions anticipated at that time. Provided also that when advance measurement techniques like Phasor Measuring Units (PMUs) become available to the NLDC and RLDCs for real-time field measurements, the inference from these measurements would be suitably used for assessment of Total Transfer Capability.

Applicability of Congestion Charge. (1) To relieve congestion in the real time, a congestion charge shall be applied as a commercial measure. The congestion charge will be payable by a Regional entity or entities causing congestion in the inter-regional link or intra-regional link and receivable by a Regional entity or entities relieving congestion. (2) Congestion charge may be imposed on any Regional entity or entities in any Region or Regions for causing congestion and paid to any Regional entity or entities in any Region or Regions for relieving congestion as per the detailed procedure under these regulations formulated by NLDC and approved by the Commission.

(3) The congestion charge shall be payable by the overdrawing regional entity in addition to the Unscheduled Interchange charges which would be payable as per Central Electricity Regulatory Commission (Unscheduled Interchange charges and related Matters) Regulations,2009 or any reenactment thereof.

Applicability of Congestion Charge. Congestion Charge shall be applicable to Regional entities as per the CERC (Measures to relieve congestion in real time operation) Regulations and orders on rate of congestion charge as applicable from time to time At frequency below 50 Hz, congestion charge would be levied for over drawal or under-injection in the importing control area and at frequencies above 50 Hz, congestion charge would be levied for under drawal or over-injection in the exporting control area Congestion charges may also become applicable for an intra-regional corridor of one region, if the congestion is attributable to other regional entities of other region.

Congestion charge shall be applicable only after two time blocks from the time of issuing the notice, not counting the time block in which notice is issued Congestion charge shall be withdrawn after the power flow on the affected transmission link/ corridor has come down to the ATC and remains at this level for one time block. NLDC/ RLDC shall communicate to all concerned Regional entities telephonically or through fax message/ and through postings on website and making available the same on the common screen available at NLDC/ RLDCs/ SLDCs for lifting of congestion charge

Notice for application of congestion charge When, in the opinion of the National/Regional Load Despatch Centre, flow of electricity on an interregional /intra-regional corridor/ link used for transfer of electricity has crossed the ATC of such corridor/link, the NLDC/RLDC shall issue a warning notice to the defaulting entities. If the flow of electricity on the inter-regional /intra- regional corridor/ link exceeds the TTC, the NLDC/RLDC may, after notice through fax/voice message and through posting on its website and the common screen available on the Energy Management System, which is common to NLDC, RLDC and SLDCs, decide to apply congestion charge on the defaulting entities from a particular time- block in accordance with regulation 4:

Provided that notice of at least two clear time blocks shall be given by the Regional Load Despatch Centre before congestion charge becomes applicable, not counting the time block in which the notice is issued.

Notice for withdrawal of congestion charge. When in the opinion of the National / Regional Load Despatch Centre, flow of electricity on the affected transmission link /corridor has come down to the ATC, it may, after notice through fax/voice message and through posting on its website and the common screen available on the Energy Management System, withdraw congestion charge from a particular time-block: Provided that notice of one time block shall be given by the Regional Load Despatch Centre before congestion charge is withdrawn, not counting the time block in which the notice is issued.

CONGESTION CHARGE ACCOUNT (1) Each Regional Load Despatch Centre shall maintain a separate bank account called “Congestion Charge Account” wherein all money received on account of congestion charge shall be credited. The amount standing to the credit of Congestion Charge Account, if any, shall be transferred to a Fund at regular intervals as per methodology notified by the Commission. 2) Congestion charge account shall presently be maintained and operated by the Regional Load Despatch Centre in the same manner as the account for Unscheduled Interchange Charges. Provided that Congestion Charge Account may be maintained by any other entity as the Commission may direct by notification from time to time.

PAYMENT AND UTILISATION OF CONGESTION CHARGE The statement of payment and disbursal of congestion charge shall be issued by the Regional Power Committee Secretariat on weekly basis along with statement for Unscheduled Interchange charge. A monthly report on the collected and disbursed congestion charges shall be given to the Commission by Regional Load Despatch Centres.

Payment to Congestion Charge Account The Regional Entity liable to pay congestion charge shall deposit the amount in Congestion Charge Account within 10 days of issue of statement by the Regional Power Committee Secretariat: Provided that when payment of congestion charge is delayed beyond two days from due date, that is to say, beyond twelve days of the issue of statement by the Regional Power Committee Secretariat, the Regional entity responsible for delay in depositing congestion charge amount shall be liable to pay interest at the rate of 0.04% per day.

Release of Congestion Charge Amount The Regional Load Despatch Centre shall, within three working days of receipt of congestion charge payment, release the amount payable to the Regional Entity entitled to receive congestion charge, along with interest, if any, on account of delay in payment of congestion charge.

Utilisation of Congestion Charge The undisbursed amount of congestion charge collected from the constituents in the account mentioned in Regulation 8 shall be utilized, with the prior approval of the Commission, to relieve congestion including but not limited to carrying out specific system studies to optimize the utilization of the inter-regional links, installation of special protection schemes, installation of shunt capacitors, etc. in accordance with the procedure notified under Regulation 8.

Provided that the Regional Load Despatch Centres/any other entity entrusted with maintenance and operation of the funds shall submit report to the Commission on a six monthly basis, furnishing details of undisbursed amount and utilisation thereof.

THANKS