Project Management Organization Scheduling 31 January.

Slides:



Advertisements
Similar presentations
CP Chapter 4 Schedule Planning.
Advertisements

Work Breakdown Structures
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Project Management: A Managerial Approach
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
Project Time Management
Importance of Project Schedules
8 September ProcessWithin the Steps  Put together minimal solution Start with external commitments Introduce internal milestones  Focus on the.
11 October Project Management Discipline of planning, organizing, and managing resources to bring about the successful completion of specific project.
Project Management 30 January. Odds and ends Tournament on the webweb In the newsnews.
Lecture 4 Project Management Chapter 17.
Roberta Russell & Bernard W. Taylor, III
Project Time Management
Project Management March 9, 2001 Dr. Richard Chung Dept. Chemical & Materials Engineering San Jose State University.
Chapter 11 - Project Management ME101 Dr. Nhut Tan Ho 1.
Project Scheduling & Budgeting CEE 402 Engineers Without Frontiers Lecture 6 February 26, 2003.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
“80% of software projects fail”  Standish Report (1995) Standish Report 16.2% completed on-time and on-budget with all features and functions as initially.
Prepared by: Michael Palazzo
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Project Management and Scheduling
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Software Project Management Task Sequencing Activity Sequencing Concepts PERT charts Critical Path Analysis.
Chapter 3 : Managing the Information Systems Project.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
(from Dr. Diane Pozeksky. “80% of software projects fail” Standish Report (1995) Standish Report 16.2% completed on-time and on-budget with all features.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Appendix A Project Management: Process, Techniques, and Tools.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Lean Project Management
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 7 Project Manager’s Toolkit for Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
PROJECT SCHEDULING By Deepika chaudhary. Project Scheduling Scheduling means estimation of time and resources required to complete activities and organise.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Software Project Management
Ch. 41 Project control. Ch. 42 Work Breakdown Structure WBS describes a break down of project goal into intermediate goals Each in turn broken down in.
Geog 469 GIS Workshop Project Management.
Fall CS-EE 480 Lillevik 480f06-l10 University of Portland School of Engineering Senior Design Lecture 10 Webs Scheduling MS Project (Optional)
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
CSCI 521 Final Exam Review. Why Establish a Standard Process? It is nearly impossible to have a high quality product without a high quality process. Standard.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 3 Managing the Information Systems Project
Project Management Inspections and Reviews 1 February.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
What is a Functional Spec?  Defines what the functionality will be NOT how it will be implemented  Describes features of the software product product's.
Project Management Project Controlling
PROJECT MANAGEMENT.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
REQUIREMENTS Project management tools
PROJECT MANAGEMENT (BSBI 622)
CIS 210 Systems Analysis and Development
REQUIREMENTS Project management tools
Presentation transcript:

Project Management Organization Scheduling 31 January

ORGANIZATION Project management

Organization Needed to control communications cost Channel of communications costs about 2 hours per week Optimal number 3-7 Organization structures Hierarchical Peer Requires leader of team or aspects Subteam Requires gatekeeper Matrix

What can you tell from an organization? The formal structure NOT the informal working mode

SCHEDULING Project management

How to Build a Schedule Identify the component parts Identify the dependencies Estimate Really just another word for guess Prefer educated guess Lay out assignments and time frames

Project Plan for this project Use simple Excel spreadsheet (or equivalent)

What you should be able to tell from your project plan What is Joe working on this week? Who can help me if I run into trouble? If I have to choose an activity to be late, which one will impact the project more?

Tools to Help Product description Clear statement of what you are building Work breakdown Product flow PERT charts Program Evaluation and Review Technique Gantt charts

Work Breakdown Structure Need to break down the tasks into component parts and tasks Level of detail important Lacks any time component

Work Breakdown

Graphical WBS

Product Flow Identify sequences and dependencies Distinguish new from existing components

Product Flow

PERT Charts Critical path analysis or method Program Evaluation and Review Technique Also known as activity networks Developed by Navy in 1958 Three stages: Planning (tasks and sequence) Scheduling (start and finish times) Analysis (float and revisions) Two different models Activities are nodes (most common) or arcs

Pert Chart Activity Box

Pert Charts

CPM: Critical Path Method Alternative to PERT Dupont 1957 Graphical view of project Predicts time required to complete Shows which activities are critical to maintaining the schedule

Planning: PERT and CPM 1. Identify the specific activities and milestones. 2. Determine the proper sequence of the activities. 3. Construct a network diagram. 4. Estimate the time required for each activity. 5. Determine the critical path. 6. Update the PERT chart as the project progresses. 1. Specify the individual activities. 2. Determine the sequence of those activities. 3. Draw a network diagram. 4. Estimate the completion time for each activity. 5. Identify the critical path (longest path through the network) 6. Update the CPM diagram as the project progresses.

Gantt Charts Milestone charts Invented by Harvey Gantt in 1916 Advantages Less detailed Amenable to management overlays

Gantt Chart

Gantt Chart with Overlays

Scheduling Steps and Tools Put together minimal solution Primary requirements Start with external commitments Product descriptions Milestones (contract) Introduce internal milestones Work breakdown structure Product Flow PERT Chart, Gantt chart Focus on the risks Risks (contract) Add next level of features where possible Secondary requirements

Software Sources Open source tools: dmoz.org/Computers/Software/Project_Management/Open_Source/

Reviews and Inspections

Why? Developer can’t correct unseen errors More eyes to catch problems Earlier is cheaper Integration fix typically 3-10 times the cost at design Difference in terms Review implies completed work, often reviewed by someone at a different level Inspection implies peer review of work in progress

Inspections Introduced by Michael Fagin in 76 (IBM Systems Journal) Formalized process Specific roles and steps Heavy preparation and follow-up Used for documents and code

Will you review or inspect? What will you review or inspect? How will you review or inspect?