1 Data Collection and Predictive Modeling in Industrialized Housing A Presentation at IFORS 2005 Honolulu By Dr. Mike Mullens, PE Scott Broadway July 15,

Slides:



Advertisements
Similar presentations
Hallmark Southwest Corporation The Home of Craftsmanship Building Manufactured Homes Since 1977 at Manufacturing Facility in Loma Linda, CA. Hallmark Southwest.
Advertisements

Immediate Communications Visual Management Automatic Data Collection Andons Real Time Performance Visibility Wireless Innovations for the Production Floor.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
OPSM 301: Operations Management Session 12: Service processes and flow variability Koç University Graduate School of Business MBA Program Zeynep Aksin.
Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas.
Theory of Constraints Part II: TOC Concepts
Introduction & Strategy Module
Planning & Scheduling Systems: From Design to Fabrication.
The future of automated construction excellence. Industry Trend More for Less Metal Construction Components Competitive Advantage Business Concept Process.
INDUSTRIAL & SYSTEMS ENGINEERING
Hyperion EPM Overview & Case Study.
S. Chopra/Operations/Strategy1 Operations Management: Introduction & Strategy Module u Introduction & Administrative u Key Principles of Course »Strategic.
1 BA 555 Practical Business Analysis Review of Statistics Confidence Interval Estimation Hypothesis Testing Linear Regression Analysis Introduction Case.
Module 1: Overview of Information System in Organizations Chapter 2: How Organizations use IS.
Wall and Ceiling Construction Vocabulary
Business Process Management: The Third Wave The Next 50 Years of IT.
Attendance Enterprise. System Overview MS Windows Server Windows Workstation Browser Based Client Employee Self Service Data Collection PayrollReports.
Constructing Homes and Other Buildings
SchedulingProducingControllingSchedulingProducingControlling.
Demonstrating a Home Under Construction Purpose: To use your knowledge of the construction process and production USPs to influence the sales process and.
Exaquantum/RDS Copyright © Yokogawa Electric Corporation 8 December, 2008 Remote Data Synchronization.
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
F-1 Applying Lean to Factory Homebuilding Dr. Mike Mullens, PE.
David Cook, P.E. State Maintenance Engineer, SCDOT.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
The Science of Prediction Location Intelligence Conference April 4, 2006 How Next Generation Traffic Services Will Impact Business Dr. Oliver Downs, Chief.
Copyright 2011 John Wiley & Sons, Inc. Chapter 3 Network and System Design 3-1.
Sergey Khudyakov Data Transfer, Inc. Russia Large-scale RF mesh AMR implementation (experience in St.Petersburg)
Attendance Enterprise A time and attendance system that works for you.
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
REAL-TIME SOFTWARE SYSTEMS DEVELOPMENT Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
0 CHAPTER 9 Relevant Costs and Product Planning Decisions © 2009 Cengage Learning.
Technology Supply Chain Management
Intelligent Supply Chain Management Strategic Supply Chain Management
Operations Fall 2015 Bruce Duggan Providence University College.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
EXCEL DECISION MAKING TOOLS AND CHARTS BASIC FORMULAE - REGRESSION - GOAL SEEK - SOLVER.
Copyright © Rajit Gadh 1 Manufacturing Processes by Rajit Gadh.
Cost Behaviors Management Accounting. Cost Classifications Association with cost object Cost object is anything for which management wants to collect.
SchedulingProducingControllingSchedulingProducingControlling.
Network analysis as a method of evaluating support of enterprise networks in ERDF projects Tamás Lahdelma (Urban Research TA, Finland)
TOTAL PROTECTION. TOTAL CONFIDENCE. Owens Corning ® Total Protection Roofing System ®^
Ventilation Solutions For Steep-Slope Commercial Roofing.
FIELD STUDY AND ANALYTICAL ASSESSMENT OF SEALED ATTICS CONDUCTED FOR THE STATE OF FLORIDA 24February 2016 David O. Prevatt, PhD, P.E. Associate Professor.
Atlas is pleased to present…. What Is a Radiant Barrier? The Turkey Analogy.
Enterprise Resource Planning, 1st Edition by Mary Sumner
Module 1: Overview of Information System in Organizations
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Strategic Capacity Management
In addition to your name, write down your section number & instructor’s name on the scantron sheet. Business Game Quiz.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Disabled Adult Transit Service:
System Control based Renewable Energy Resources in Smart Grid Consumer
Fall, 2017 EMBA 512 Demand Forecasting
Assignment #3 Group 3.
What is the Project? The Framing the American Dream project set up two controlled experiments: In each experiment, two identical buildings were framed,
What is the Project? The Framing the American Dream project set up two controlled experiments: In each experiment, two identical buildings were framed,
What is the Project? The Framing the American Dream project set up two controlled experiments: In each experiment, two identical buildings were framed,
Enterprise Resource Planning, 1st Edition by Mary Sumner
IBM-SAP Alliance Industrial Products
Manufacturing Production Planning
King Saud University College of Engineering IE – 462: “Industrial Information Systems” Fall – 2018 (1st Sem H) Introduction (Chapter 1) part.
Real Time Engineering Slab & Coil Yard Management and Plate Stock Report , Planning, Production, Reporting & Data Base Management Solution for Metal Industry.
Aggregate Production Planning (APP)
Presentation transcript:

1 Data Collection and Predictive Modeling in Industrialized Housing A Presentation at IFORS 2005 Honolulu By Dr. Mike Mullens, PE Scott Broadway July 15, 2005

2 Agenda Background Technology overview Beta test results

3 Mission: Create production innovations for U.S. homebuilders to produce high quality, affordable, energy-efficient homes.

4 Modular Homes

5

6

7

8

9

10 Modular Homes

11 Manufacturing Challenge: High & Variable Labor Content

12 Manufacturing Challenge: Many Highly Interrelated Activities

13 Manufacturing Challenge: Small, Trade-oriented Teams

14 Manufacturing Challenge: Messy Processes

15 Manufacturing Challenge: Tight Production Flow Lines

16 Manufacturing Challenge: Near-Synchronous Line Movement

17 Manufacturing Challenge: Large Components

18 Manufacturing Challenge: Location Constraints for Activities

19 Manufacturing Challenge: Floating Bottlenecks Custom Homebuilding Variable Production Processes Synchronous Production Lines Activity Location Constraints

20 Floating Bottlenecks: Upstream Queues

21 Floating Bottlenecks: Downstream Line Starvation

22 Floating Bottleneck: Off-quality & Rework

23 Floating Bottlenecks: Other Impacts Hurry  exhaustion, frustration Overtime  higher costs, turnover Unfinished work in yard Lost production capacity

24 Research Question How much labor is really required to build a house to customer specs? Can we use these estimates to better manage the enterprise?

25 STACS Architecture 1 Barcode Scanners Employee Activity Module * At each Work Location Wireless link 2 Parser Units Organize/verify Scans Buffer Data Send to Database On the Factory Floor Wireless Network 3 STACS Database Log data Intelligent data error ID/repair Database Server 4 Info. System Live production status Historical reporting Labor modeling/prediction Production scheduling Decision Support Corporate Intranet

26 Module Scan

27 Real Time Monitoring

28 Dashboard

29 Milestones Alpha test – Summer 03 4 weeks ~25 employees in drywall activities Beta test – Spring/Summer employees (entire plant touch labor) Web-based monitoring on the plant floor 255 modules

30 Regression1.15 hours D 7553E 7553A 7576C 7574B7570B 7570A7625A7626A 7627B 7628E 7628A7623A Production Schedule Total Labor Hours Average=8.6 labor hours 4-6 finishers Actual Finish Time Predicted PredictionMean Error Average1.77 hours Alpha Test in Drywall Labor Modeling: Finishing

31 Predictive Modeling Two activities chosen for analysis Roofing Rough electric

32 Roofing Tasks Cut and lay-in insulation Position and nail OSB pieces over eave and nail 1x3 strip over top (to prevent insulation from blocking airflow at eave). Position and nail OSB sheathing (note spacers between OSB sheets) Locate and nail hinge strips for eave flip Position and nail eave flip panels Locate and nail hinge strips for ridge flip Position and nail ridge flip panels Install ice guard at eave Install 2 layers of felt at eave Roll out felt and staple Stack shingles on roof and separate before positioning Position shingles and nail, row by row, starting at bottom and working up. When omitting row of shingles for flips, snap chalk line for positioning

33 Roofing Data Set 255 initial data points – one for each module produced Dependent variable – total labor hours Independent variables – key drivers  Roof dimensions – length, width, pitch  Flip panels – ridge, eave  Other features – attic decking, dormers, etc.

34 Filtering the Data For each module # employees who scanned # scans Total labor hours Resulting data set Reduced from 255 to 67 modules

35 Linear Regression Strategy Linear model Dependent (Y) variable transformation – square, square root, inverse, e, ln Dependent (X) variable transformation – square, square root, inverse, e, ln X, first degree cross terms Analysis Conventional linear regression (Excel) Stepwise regression (Minitab)

36 Regression Results R 2 range: Few independent variables significant – less important variables Mean absolute error using model greater than error using average labor content

37 Regression4.2 hours Actual Roofing Time Predicted PredictionMean Error Average4.1 hours Beta Test Labor Modeling: Roofing

38 Conclusions Workers not conscientious in reporting work Little encouragement or incentive from management to report work reliably Many other extraneous factors influence work – delays (bottlenecks, materials)

39 Future Research Labor estimating Linear regression Neural nets Automate scanning - RF tag technology Operational decision support Production scheduling