All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.

Slides:



Advertisements
Similar presentations
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
Advertisements

 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities, Now Three I.Target Hall NT-05 has been secured.
1Beam Line Review. 17th November Detector parameters Fermilab Beam line monitors built to replaced SWICS Scintillating fibre tracker – readout.
ISS, 23 September 2005E. Gschwendtner, CERN1 Beam Instrumentation at CNGS 1. Introduction 2. Layout 3. Beam Instrumentation 4. Summary.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
Special Report NuMI Target Updates Special Report NuMI Target Updates Status Update I.Target Hall Target module ready to accept new target General target.
Beam Position Monitors MICE CM Harbin January, 2009.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
LBNE Target Hall Instrumentation Bob Zwaska January 27, 2010.
NuMI DOE Review May 25, 2004 Commissioning Page 1 NuMI Commissioning Overview CD-4 Goals Planning Pre-commissioning activities Commissioning Summary.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
NuMI Horn Construction and Testing
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
NuMI Run II meeting Nov. 4, 2004 NuMI Target Hall Jim Hylen Page 1 NuMI Target Hall Status / Plan 8 slide introduction to target hall 9 slide list of status.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
Ff f f f “Conventional” neutrino beams: Target requirements Phil Adamson 13 th January 2012.
All Exp Mtg April NuMI-MINOS Status Report – Bob Zwaska 78.7e17 protons for the week  Best week on record  Best day on Tuesday – 12.23e17 Decent.
Debbie Harris Sacha Kopp, Commissioning Workshop 1    Beam Monitoring Hadmon will see remnant protons Muon Monitors see whatever escapes beam.
NuMI NBI2006 September 6, 2006 NuMI Target Experience Jim Hylen / FNAL Page 1 Experience with the NuMI Target Max. Proton/spill Max. Beam Power Integrated.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
20to2T5m100cm Images Van Graves February 13, 2014.
Comissioning the NuMI Beam at Fermilab with Ion Chamber Arrays D. Indurthy, R. Keisler, S. Kopp, S. Mendoza, M. Proga, Z. Pavlovich, R. Zwaska Department.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
Preliminary Results from the MINER A Experiment Deborah Harris Fermilab on behalf of the MINERvA Collaboration.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
6 April 2006E. Gschwendtner, CERN AB/ATB1 CNGS Project: Secondary Beam 1. Layout 2. Beam Instrumentation 3. Commissioning Plans for the Secondary Beam.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
NA YETS: schedule week by week S. Evrard.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
DUSEL BL WG 10 Nov 2008 Virgil Bocean 1 NuMI Geodesy and Alignment Lessons Learned Virgil Bocean DUSEL BL WG 10 Nov 2008.
NuMI Horn Alignment Cross-hair System NuMI Horn Alignment Cross-hairs Target Hall Instrumentation Review November 18, 2002 David Ayres Argonne National.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Measurements of Intense Proton Beams using Optical Transition Radiation Vic Scarpine, Fermilab TIPP 2011 Chicago, IL June 10, 2011.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
LBNE Remote Handling Conceptual Design Issues for ORNL Collaboration Kick-off Meeting at ORNL 1/6/2010.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Status Report Beam Working Group 31 January 2007 Presented by L.Gatignon  Revised beam design  Requests to AB department for 2007.
Mike Andrews August 30, Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.
LBNE Hadron Monitor and Target Hall Instrumentation Bob Zwaska February 4, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
E4 hall technical specifications
News and brief overview of Beamline plans for the next few months
The interaction region for FIRST (status report)
Radiation-safe area for electronics, or laser or
Preparation of the CLAS12 First Experiment Status and Time-Line
Polarized 3He target installation
Presentation transcript:

All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at last week's meeting spilled downtime into this week's report). Dynode threshold calibration also contributed to downtime. All rack filter maintenance completed. NEAR DETECTOR: PMT replaced, light leak tracked down and taped up. PMT expert is here this week to help track down the last subtle issues before beam arrives. NuMI Horn 1 Replacement Status: Horn 1 is all hooked up and ready to run. Last week Thursday, performed the horn alignment beam scan.

All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono Sweep proton beam across horns. Measure position of proton beam with beam position monitors and secondary emission monitors upstream of the target. Use measurements to extrapolate the beam position at the location of the horns. Target Horn 1 Baffle BPM x BPM y Profile BPM x BPM y Profile Horn Hadron Monitor 1077 Toroid Crosshair Drift space Target and Baffle out

All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono 3 Sweap primary proton beam across alignment bars  Target must be out  One on the downstream end of Horn 1  One on each end of Horn 2 Also steer beam into horn 1 aperature Two ion chambers measure particle spray  One downstream of each horn

All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono 4 1 mm thickness 2.5 mm separation 3.5 mm Nub Horn 1 Neck 18 mm Horn 2 Horn 1 Horizontal Position of Proton Beam (mm) X-Center (mm)X-Angle (mrad) Horn / /- 0.2 Horn / /- 0.4 Y-Center (mm)Y-Angle (mrad) Horn / /- 0.2 Horn / /- 0.4 Preliminary Proton beam intercepting the Alignment bar Proton beam intercepting horn aperature

All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono Schedule for this Week: Monday: Target module back into chase, hook up z-drive motor cable, hook up water to target, helium lines and electrical, reinstall upstream shielding. Tuesday: Target module top fiducial survey using laser tracker (am). Advance target into horn LE10 position remotely via ACNET while monitoring position with crane camera. Wednesday: Install Target T-Blocks and survey plugs. Install R-block installation. Complete air seal/vapor barrier on shielding plug. Start Target Hall clean up. Thursday: general removal of all equipment, remove workcell hydraulics and secure workcell. Leak check for air leaks on target chase. Search & Secure and run Beam by early evening and align target with proton beam.