An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb-7 2008 Sci-ECAL meeting S. Uozumi (Kobe)

Slides:



Advertisements
Similar presentations
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
Advertisements

AHCAL Mechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY,
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
6mm 【 Development of Readout Electronics for MPPC 】 We report the read out electronics of MPPC( Multi-Pixel Photon Counter ). MPPC is a new photodetector.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Setup of Gain Monitoring System with Mr. Uozumi Kobe Univ. Hiroko Ikeda 18,May 2007.
Atsuhiko Ochi, Yuki Edo, Yousuke Kataoka ATLAS MicroMEGAS meeting, 11/12/12.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Effect of flat cable to MPPC signal S. Uozumi (Kobe) Jun ScECAL meeting.
The Scintillator ECAL Beam Test at FNAL Adil Khan International Linear Collider Workshop 2010 LCWS10 & ILC10, Beijing, China CALICE Scintillator ECAL group.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Tungsten as HCal-material for a LC at multi-TeV energies CALICE AHCAL Meeting, DESY 17 July 2009 Christian Grefe for the Linear Collider Detector Group.
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
GLD-CAL and MPPC Based on talks by T. Takeshita and H. K. Kawagoe / Kobe-U 2005-Sep-16 MPPC
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
The HCAL barrel absorber structure
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
1 Zero Degree Calorimetry for CMS Had EM e +,  - Michael Murray for CMS.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Short report on MPPC gain monitoring system S. Uozumi Jun ScECAL meeting At the FNAL BT, having the gain monitoring system for all the channel.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
GLD ECAL Beam Test at DESY - Plan and outlook - Satoru Uozumi (Shinshu) Jan Japan-Korea Joint Shinshu Univ.
The Scintillator-ECAL 2 nd Prototype S. Uozumi (Kobe) Jun
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Rosier Ph. – IPNO – Detector Dpt. – 30/10/2012GASPARD Padova meeting 1/13 Mechanical engineering for GASPARD Unité mixte de recherche CNRS-IN2P3 Université.
GEM Integrated PCB readout and cooling
Beam test of Silicon-Tungsten Calorimeter Prototype
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Power pulsing of AFTER in magnetic field
IFR detector mechanics
First of all we will remind some numbers:
New Design for Beam Test Structure
ScECAL+AHCAL+TCMT Combined Beam FNAL
Sergej, Sacha, Meny, (Itamar), Yan
Vereinfachung der CBM TRD Elektronik
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)

Tungsten absorber assembly Steel frame ( mm thick) Thickness of this part should be 3 mm (for readout and monitoring system) Tungsten plate White acrylic Frame (3 mm thick) Guide rails fit for shelf (not necessary?) 18 cm 20 cm

One complete layer flat cable with MPPCs (9 channels) Acrylic bar For gain monitoring

Length of the flat cable Not easy to decide, because … – Space to put our detector is limited. – Just behind the Sci-ECAL, AHCAL will be located. – Readout electronics takes some space. (size of 1 board ~ 95.3 x 19 cm, we will use ~23 boards. – Need to know available space for our detector in front of the AHCAL. Ask Erika or someone at DESY ? – Make a touch panel to hook up signal lines? It can change the connector bundle size at the same time, if necessary.

AHCAL Beam

Readout electronics channels Each flat cable has 9 channel connector. Readout baseboard has 14, 30 or 32 ch connectors. If we connect them directly (as done in the DESY BT), there will be some unused channels. (just 90 channels out of 108 are used.) At the FNAL BT, we will have 23 (+2) baseboards. If we use 90 ch per a board, total available num. of readout channels will be On the other hand, total detector channels will be – 72 strips x 30 layers = 2160 ch – 32 layers = 2304 ch For case of 30 layers, 24 baseboards will be enough. For 32 layers case, we have to use electronics more efficiently. (In this case converting 9 ch connector to 6 channel bundle will be useful.)

Things to concern / discuss … Number of layers ? – How much is the shower leakage with 30 / 32 layers ? – By the way, how many tungsten plates in Shinshu ? Design and cabling of gain montoring system – Also need to have available space Shelf for cal layers / electronics / CMBs – Is the guide rail necessary for the cal layers? – Available space – this also defines the length of flat cable. Is it really possible to make the designed structures? – Ability of machining, mechanical / dynamical issue, machining precision – Need to consult with machining company. – Detailed structure will be modified in that discussion.