Status Update 01-17-2006 Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.

Slides:



Advertisements
Similar presentations
High Tech Seed Cleaning Low Cost Alternatives. Initial Steps in Seed Preparation Adapted seed source (Often local) Locate mature flowering plants of desired.
Advertisements

Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Cat Dissection.
Step #1 Wash hands using proper hand washing technique Note: please see “Hand Washing” Power Point for more details Cafeteria: Canned Fruit Prep.
Servicing Welch DRYFAST ULTRA Pump Models 2032
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
Bellow valve (trap&pump) Inside glove box. (Note: Ar glove box is not necessary, if you work with single crystalline organic materials like rubrene that.
1 Oil Fuel Line De-aerators What they are, what they do and how to install.
Status of 1.3-GHz Cavity Vacuum Furnace at IB-4 SRF Dev. Group Meeting 27 Sept 2010.
1 Stony Brook Update Further Progress T.K. Hemmick for the Tent Crew.
Salk Institute Mobile Lab Gel Electrophoresis Teacher Instructions BioRad Set Up 8 groups Grossmont Kit.
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
Full Mission Simulation Test Report UPR-R(river) P(rock) University of Puerto Rico Río Piedras Campus May 14, 2010.
FILTERING MDP. Safety and Safety Gear  When filtering from a fermentation vessel you should never use carbon dioxide to push the beer through the filter,
1 Some Water Extreme Calculations TK Hemmick for the Tent Crew.
Determination of the origin of the contamination of the patient.
CsI Photocathode Production and Testing
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
D OCUMENTATION O F D ESIGN. O RIGINAL D ESIGN We thought that if we covered the can with cotton balls, put it in a oven mitt and ripped up pieces of emergency.
By: Nate Miller Micah Nichols Kristine Rundorff. Dry Cleaning Bags Cotton Balls Petroleum Jelly Straws Scotch Tape.
WHAT IS AN APPRAISAL INTERVIEW? An Appraisal Interview is a One ‐ on ‐ One interview which: 1. Takes place at least once a year 2. Requires both employer.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Using Sterile Technique to Load a Syringe
Team Man Up Offense: Loyola. Loyola: Level of Play Loyola is appropriate for teams with good stickwork that are capable of executing the necessary passes.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Prep for Gain Tests: Some Progress, Some Setbacks TKH for the Stony Brook Crew.
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
Animal Care Intro to Proper Animal cleaning, handling, and Care.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
SOLDERING is the process of bonding together two or more metal parts with a thin alloy or soldering lead. Soldering is accomplished by heating the metals.
1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
Valve Update  Study several stem/seat geometries (Feb)  Demonstrate He II leak tight for 3/8, 1 in. diameter with modest (~ few psi) pressure difference.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Gold GEM Recovery Efforts/HBD Updates HBD Meeting 24 June 08.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
1 Stony Brook Update: What a long STRANGE TRIP its been T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Leaks in LEGS and HBD West T.K. Hemmick for the Tent Crew.
Installation of the T600 at Fermilab CSN2, September 22,
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
1 Stony Brook Update Back to the Future T.K. Hemmick.
1 Stony Brook Update: HBD Modifications… T.K. Hemmick for the Tent Crew.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
1 Update from the Tent Thomas K Hemmick for the Tent People.
1 Stony Brook Update Cross Roads T.K. Hemmick for himself.
1.3-GHz Cavity Vacuum Furnace at IB4
Service Procedure For Changing Engine Oil And An Oil Filter
Fault detection Lecture (1).
ComCam Cryostat Justine Haupt Mar. 6, 2017
T.K. Hemmick for the Stony Brook Crew
Stony Brook Update: Ready to Start…
T.K. Hemmick for the Stony Brook Crew
T.K. Hemmick for the Stony Brook Crew
Presentation transcript:

Status Update Stony Brook Crew

Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.

Weekly Shots Concern about becoming complacent about our skills. Need continual practice to: –Learn all steps. –Better triage for worst immediate needs. –Have whole team practiced on all steps. –More data on QE reproducibility. New paradigm: –Weekly shot of apparatus onto GEM in hand (one at a time). –Each week more ambitious in replicating full plans.

Week One Shot Goals Use final hold down plate (done). Assembly on Laminar table (new filters, ready). Use Lid-on insertion of Evap box –As opposed to held open above your head. –No longer extreme contaminant risk. Pump down to water drop. Local QE (as is) 3 chicklets

Additional Progress in Prep for Shot 1 High Vacuum Storage Vessel Pumped Down –Spring-loaded valves cut off rough pump in case of powerdown (failsafe). –170 l/s turbo runs smoothly. –First Pumped Friday (empty can). –2 x torr (good, not great). –Plan to He leak chase to be sure of all seals being tight. –Only put in precious content when system established good few at least a few days.

Week Two shot Goals (original) Initially: –Handle in old Glovebox. –Insert into WIS box. –Gain Test. Lag in feedthroughs –Initially 9 weeks. –New company…2 weeks. –Can still be proper goal for shot3. –Need new goals for Shot2

Week Two Shot Goals (revised) Lift table insertion. –Needs extreme cleaning before tent. –Needs bagging where cleaning won’t take. Fully realized railroad: –Rails on lift table. –Rails on transfer table. –Rails in INFN box. Practice handling through gloves: –Into test box (no feeds). –Out of test box –On to Vacuum storage.