LBT Q2 2008 Engineering Review SAB Static Balancing.

Slides:



Advertisements
Similar presentations
American Institute of Steel Construction Charlie Carter Vice President and Chief Structural Engineer.
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Chapter 3 Project Initiation
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review TAL Telescope Alignment.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
8.3 Measures of Dispersion  In this section, you will study measures of variability of data. In addition to being able to find measures of central tendency.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
LBT Q Engineering Review MCSC Mount Control System.
Project Status Report Presenter Name Presentation Date.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
Project Life Cycle.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
BPMN. Loan Request Process  The Loan Request Process handles the necessary activities to receive, analyze and approve loan applications submitted by.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review ENGG – Engineering General.
KEY PERFORMANCE INDICATORS
Bill Raynor Naval Research Lab
Contents Progress status SAPO`s role as distribution partner
Status of the Mechanics at Ciemat.
Corrugated Mirror and Rapid Panel Manufacturing
Senior Staff Meeting November 12, 2008
Weighted Interval Scheduling
Weighted Interval Scheduling
Procedure PP, Project Plan Configuration
Project Progress: The Floating Dutchmen
WP 1 Management and Coordination
Native American Webquest
XRN June 19 Release - Status Update
Presentation transcript:

LBT Q Engineering Review SAB Static Balancing

21-July-2008LBT Q Engineering Review Highlights (Q2/2008) Schedule has been redefined as: Schedule has been redefined as: Design Review: Completed Design Review: Completed Manufacturing start: End of July Manufacturing start: End of July Delivery to Mountain: First week of September Delivery to Mountain: First week of September Project complete (final acceptance): Beginning of September Project complete (final acceptance): Beginning of September Amount of counterweights approximated Amount of counterweights approximated ~Maximum of tonnes total needed for -Z ~Maximum of tonnes total needed for -Z Management Plan document completed and archived. Management Plan document completed and archived. Technical Specification document completed, reviewed, and archived. Technical Specification document completed, reviewed, and archived. Reference document indicating the distribution of static weight included in archive. Reference document indicating the distribution of static weight included in archive. Two quotes have been received by one vendor. The first quote was larger than budget. Second quote within budget, but only for mounts and not trim plates. Two quotes have been received by one vendor. The first quote was larger than budget. Second quote within budget, but only for mounts and not trim plates.

21-July-2008LBT Q Engineering Review Progress (Q2/2008) Design and fabricate –Z ctwts., mounts, and placement. Design and fabricate –Z ctwts., mounts, and placement. √ - design complete √ - design complete √ - weight placement chosen √ - weight placement chosen Get quotes for fabrication of -Z ctrwts. and mounts. Get quotes for fabrication of -Z ctrwts. and mounts. √ - awaiting more quote responses √ - awaiting more quote responses Required documents completed. √ Required documents completed. √ Completed Technical Specification document to be reviewed. √ Completed Technical Specification document to be reviewed. √ Verify weight needed and location. √ Verify weight needed and location. √ Verify installation procedure. √ Verify installation procedure. √

21-July-2008LBT Q Engineering Review Open Issues Technical Technical None None Schedule Schedule Manufacturing time within allowable limits and abilities of prospective fabricators Manufacturing time within allowable limits and abilities of prospective fabricators Delivery and installation does not interfere with future telescope procedures and planning Delivery and installation does not interfere with future telescope procedures and planning Financial Financial Quotes stay within range of budget Quotes stay within range of budget Resource Resource Fabrication quotes, fabrication time, transportation Fabrication quotes, fabrication time, transportation

21-July-2008LBT Q Engineering Review Planning (Q3/2008) Respond to quotes Respond to quotes Start fabrication and then install Start fabrication and then install