CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:

Slides:



Advertisements
Similar presentations
Reducing Total Cost of Ownership (TCO) Mike Chon AM Computers.
Advertisements

Duke Atlas Tier 3 Site Doug Benjamin (Duke University)
MINERvA DAQ Software D. Casper University of California, Irvine.
Software Frameworks for Acquisition and Control European PhD – 2009 Horácio Fernandes.
Title US-CMS User Facilities Vivian O’Dell US CMS Physics Meeting May 18, 2001.
Target Online Software J. Leaver 01/12/ /06/2015Imperial College 2 Target Controller Software Software for Stage 1 upgrade nearing completion –Hardware.
Operating Systems.
Hardware and Software Basics. Computer Hardware  Central Processing Unit - also called “The Chip”, a CPU, a processor, or a microprocessor  Memory (RAM)
1 Network Statistic and Monitoring System Wayne State University Division of Computing and Information Technology Information Technology.
2/10/2000 CHEP2000 Padova Italy The BaBar Online Databases George Zioulas SLAC For the BaBar Computing Group.
1 CSC 1401 S1 Computer Programming I Hamid Harroud School of Science and Engineering, Akhawayn University
Online Systems Status Review of requirements System configuration Current acquisitions Next steps... Upgrade Meeting 4-Sep-1997 Stu Fuess.
By Anthony W. Hill & Course Technology1 Common End User Problems.
TB2004 DAQ Code Development Status & Prospect. July 1, 2004TB2004 DAQ Code Development2 Contents 1.TB status –run control –peripheral/FED crate –DAQ column.
Remote Production and Regional Analysis Centers Iain Bertram 24 May 2002 Draft 1 Lancaster University.
NATIONAL INSTITUTE OF SCIENCE & TECHNOLOGY Presented by: Santosh kumar Swain Technical Seminar Presentation by SANTOSH KUMAR SWAIN Roll # CS
Group Computing Strategy Introduction and BaBar Roger Barlow June 28 th 2005.
Farm Management D. Andreotti 1), A. Crescente 2), A. Dorigo 2), F. Galeazzi 2), M. Marzolla 3), M. Morandin 2), F.
D0 SAM – status and needs Plagarized from: D0 Experiment SAM Project Fermilab Computing Division.
U.T. Arlington High Energy Physics Research Summary of Activities August 1, 2001.
1 Computing Fundamantals With thanks to Laudon & Laudon Session 2.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
MiniBooNE Computing Description: Support MiniBooNE online and offline computing by coordinating the use of, and occasionally managing, CD resources. Participants:
Jan. 17, 2002DØRAM Proposal DØRACE Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Remote Analysis Station ArchitectureRemote.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Grid MP at ISIS Tom Griffin, ISIS Facility. Introduction About ISIS Why Grid MP? About Grid MP Examples The future.
14 Aug 08DOE Review John Huth ATLAS Computing at Harvard John Huth.
Spending Plans and Schedule Jae Yu July 26, 2002.
3/24/2003CHEP'03, La Jolla, USA Object Database for Constants: The common CLEO Online and Offline solution Hubert Schwarthoff Cornell University With N.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
STAR Off-line Computing Capabilities at LBNL/NERSC Doug Olson, LBNL STAR Collaboration Meeting 2 August 1999, BNL.
DAQ May 25, 2000 Harry Nelson. Meeting Schedule March - meeting at SUF, laid plans for overall work plan 1/week at UCSB Re-started weekly phone meetings.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Lee Lueking 1 The Sequential Access Model for Run II Data Management and Delivery Lee Lueking, Frank Nagy, Heidi Schellman, Igor Terekhov, Julie Trumbo,
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
HIGUCHI Takeo Department of Physics, Faulty of Science, University of Tokyo Representing dBASF Development Team BELLE/CHEP20001 Distributed BELLE Analysis.
Dan Bauer - CDMS Project ManagerAll experimenters meeting - April 23, 2007 Cryogenic Dark Matter Search (CDMS) Progress at Soudan since last summer Successful.
Background Real-time environmental monitoring is a field garnering an ever-increasing amount of attention. The ability for sensors to make and publish.
1 EIR Nov 4-8, 2002 DAQ and Online WBS 1.3 S. Fuess, Fermilab P. Slattery, U. of Rochester.
EDM collaboration meeting WBS 9.0: Slow controls, Simulations, DAQ/data analysis Chris Gould- North Carolina State University and Triangle Universities.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Feb. 14, 2002DØRAM Proposal DØ IB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) Introduction Partial Workshop Results DØRAM Architecture.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
5 June 2003Alan Norton / Focus / EP Topics1 Other EP Topics Some 2003 Running Experiments - NA48/2 (Flavio Marchetto) - Compass (Benigno Gobbo) - NA60.
MICROSOFT TESTS /291/293 Fairfax County Adult Education Courses 1477/1478/1479.
Computing at SSRL: Experimental User Support Timothy M. McPhillips Stanford Synchrotron Radiation Laboratory.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Computing Issues for the ATLAS SWT2. What is SWT2? SWT2 is the U.S. ATLAS Southwestern Tier 2 Consortium UTA is lead institution, along with University.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Feb. 13, 2002DØRAM Proposal DØCPB Meeting, Jae Yu 1 Proposal for a DØ Remote Analysis Model (DØRAM) IntroductionIntroduction Partial Workshop ResultsPartial.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Jianming Qian, UM/DØ Software & Computing Where we are now Where we want to go Overview Director’s Review, June 5, 2002.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
PC Farms & Central Data Recording
Computing Infrastructure for DAQ, DM and SC
DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment
Cryogenic Dark Matter Search Remote Controlled DAQ
Example of DAQ Trigger issues for the SoLID experiment
Harry Nelson, UCSB Collaboration Meeting July 1, 2002
Status of TTF HOM Project Aug 9, 2005
Proposal for a DØ Remote Analysis Model (DØRAM)
Computing activities at Victoria
Presentation transcript:

CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering: Stan Orr, Lou Kula, Rich Schmitt

Introduction CDMS (Cryogenic Dark Matter Search: E891) – An experiment using germanium and silicon detectors operated at low temperatures (90 mK) at the Soudan Underground Facility to search for low energy nuclear recoils characteristic of interactions with candidate SUSY dark matter particles (WIMPs). FNAL CD Personnel: Don Holmgren, 25% Deliverables: Linux device drivers and user space code to control VME and PCI-based instrumentation An event builder integrated with slow control from UCSB Assistance with computing infrastructure (DAQ cluster management, code management, configuration management) Raw and processed data repositories at FNAL Capability to reprocess raw data at FNAL

Experiment Status Official data taking began at Soudan October 11 Running with 1 tower (3 silicon, 3 germanium detectors) 2 weeks downtime just began (1/12/04) Will start running 2 towers 1/26/04 Various DAQ software upgrades testing now Background running until July 2004 Then, two months downtime to install 3 more towers Significant DAQ expansion required Funded through late 2005 Collaboration will apply for follow up project

DAQ Architecture Hardware Architecture: 1 VME crate per two towers of digitizers 1 VME crate for veto Crate PC's connect w/ Event Builder PC via point-to-point GigE Shared FC disk drive, read-only by Data Server to write tapes 1 PC dedicated to monitoring, GPIB, High Voltage control Software Architecture Event Builder Written at FNAL Includes various device drivers C++ Based on R2DM, which implies dependency on: ACE ITC thread_util ZMutility Slow Control, etc... Written at UCSB JAVA Communications CORBA (ORBacus) JAVA RMI TCP/IP (in ITC)

JAVA GUI samples from UCSB Run Control

Data Repository Collaboration has requested data storage at FNAL Data rates: Background, 1 tower, 0.1 Hz: 30 GB/month Background, 2 towers, 0.1 Hz: 60 GB/month Calibration, 1 tower, 15 Hz: 6.5 GB/hour Calibration, 2 towers, 7 Hz: 6.5 GB/hour Sept-early Dec data has been copied over Internet from Stanford to Enstore Total of only 30 GB total so far Likely a few TB total by end of 2005 Use SDLT-320 tapes for raw and interchange data Have started importing remaining data directly from tape Will use test stand on WH11NW as tape import facility

Data Processing Existing analysis framework is based on MATLAB Collaboration operates modest analysis clusters at Stanford and at Soudan (8 machines each) We would benefit greatly from the ability to reprocess data on FNAL Farms (or other cluster) Requirements for Run 18 (just ended): 5E5 background events, 1E6 calibration events Raw data: 80 KB/event RQ's: 9 KB/event RRQ's: 1.5 KB/event MATLAB is not an option (too many $$$) However, can use compiled pipeline code (SLAC license) CPU requirement: about 4.5 seconds/event 2000 CPU hours for all of Run 18 Probably 2 full reprocessings between now and June Testing compiled pipeline codes now using spare cycles on old (non- SciDAC) lattice QCD cluster Paul Mackenzie is willing to host reprocessing activity

Conclusions and Planned Work Have just ended a successful run with 1 tower of detectors, and will start a 6 month run with 2 towers soon DAQ software development is in maintenance mode until July, when additional work will be required to support 3 more towers (2 man-months) We do depend on some FNAL software products R2DM, ITC, thread_util, ZMutility Also one commercial package: ORBacus Have not encountered a bug in these to date Will freeze DAQ systems at RH 7.3 Do not anticipate requesting support Data import into Enstore has started Over the next months will establish the ability to do data reprocessing at FNAL