PDO xxxxxxxxx PRE-START-UP AUDIT.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Accident and Incident Investigation
A Joint Code of Practice Objectives and Summary Presentation
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Course Material Overview of Process Safety Compliance with Standards
Checking & Corrective Action
EPA Regions 9 & 10 and The Federal Network for Sustainability 2005
RMS – a collaborative approach Presentation Lyn Dare & Stephen Larmour Authorisation & Audit Comcare.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
SIEP HSE Management System
HSE for Supervisors HEMP Module
Readiness Index – Is your application ready for Production? Jeff Tatelman SQuAD October 2008.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
SAFETY, HEALTH, AND ENVIRONMENTAL AUDITING
FPSC Safety, LLC ISO AUDIT.
Chapter 11: Follow-up Reviews and Audit Evaluation ACCT620 Internal Auditing Otto Chang Professor of Accounting.
???? HSE MS Audit ??? 2001 SIEP EP-HSE.
Welcome ISO9001:2000 Foundation Workshop.
Health and Safety Executive Health and Safety Executive Discretion and Judgement: HSE’s approach Mike Cross 3 June 2014.
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.

System-Based SH&E Management Case Study
Ship Recycling Facility Management System IMO Guideline A.962
Equity Housing Group Risk Management. 05 August 2002 © MazarsEquity Housing Group: Risk Management 2 Agenda Introduction: what is Risk Management? The.
Process Safety Management
Level 1 HSE MS Audit Insert date here Opening Presentation Insert Title here.
Basics of OHSAS Occupational Health & Safety Management System
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
E nvironmental P erformance R eview - A udit. 2 DELPHI CONFIDENCIAL/CONFIDENTIAL Agenda u Introductions and Plant Safety Orientation u Organization Chart.
Team Briefing programme
1 20/10/2004 Petroleum Development Oman Xxxxxxxxxxx (Audit Title) HSE MS Audit Xxxxxx (Period)
Wednesday 13 th February 2013 Ramside Hall, Durham Process Safety Management – Challenges for Implementation Allan Laing, CEO, Pentagon February 2013.
MSE/4- PRE START UP xxxxxxxxxxxxx Expansion Project (Additional Compressor System) PRE-START UP AUDIT.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
Stress Management Background Stress – largest single cause of sickness absence Currently accounts for approx 23% absence within Children’s Services Directorate.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
Safety Auditors Conference 2005 A Practical Approach…….
Material Adopted From: “The Internal Auditing Pocket Guide” --- J.P. Russell.
DIRECT WORKS FORUM 10 June 2008 Andy Ballard. COMMON LAW MANSLAUGHTER Effectively – Death by gross negligence Test – (a) was a (common law) duty of care.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
THE EFFECTIVENESS OF INTERNAL AUDIT PLANNING IN MALTESE COMPANIES: AN ASSESSMENT DANICA TONNA SEPTEMBER 2015.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Professional Certificate in Electoral Processes Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
A FSP is a Program designed to identify and control hazards in order to establish and maintain food safety. (Based on HACCP principles) 1 version 2 Dec.2009.
Safety Management System Implementation Michael Niels Thorsen Moscow 15 September 2005.
Insert Contractor Name HSE Letter of Assurance and HSE Capability Questionnaire Verification Insert month, year Opening Meeting.
Presented by: Jan Stanley, State Title I Director Office of Assessment and Accountability June 10, 2008 Monitoring For Results.
Compliance Audit Subcommittee Reporting Work Plan Copenhagen, Denmark 6th of May 2010.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
1 Performance Auditing ICAS & IRAS Officers NAAA 21 Jan 2016.
ISO Most Common Problems May 25, 2000 Underwriters Laboratories Inc. May 25, 2000 Underwriters Laboratories Inc.
Health and Safety Seminars 2014 RISK ASSESSMENT VS HAZARDS & EFFECTS ANALYSIS.
SOLGM Wanaka Retreat Health and Safety at Work Act 2015 Ready? 4 February 2016 Samantha Turner Partner DDI: Mob:
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Verification, Validation and Internal Audits - Jose Jimenez Federal Facilities Program Manager – EPA Region III.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
Preparation of the Self-Study and Documentation
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Controlling Measuring Quality of Patient Care
Air Carrier Continuing Analysis and Surveillance System (CASS)
Level 1 HSE M S Audit Insert Title here Closing Presentation
Closing Presentation Date
E&P HSE Audit Process (Simplified)
How to conduct Effective Stage-1 Audit
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Management commitment and responsibility Safety accountability of managers Appointment of key safety personnel SMS Implementation Plan Coordination.
Presentation transcript:

PDO xxxxxxxxx PRE-START-UP AUDIT

Agenda the audit team audit objectives schedule recommendations reporting

Team members xxxxx PDO (Leader)

HSE Performance “There must always be a gap between … aspirations and performance … But a gap between policy and performance is unacceptable” Phil Watts - Shell EP HSE Conference 22 September 1997

Terms of Reference Objective To assess the readiness of all resources, controls, procedures and services to support the operation of the new facility.

Standards Applicable Oman laws and regulations Group HSE policies and commitments PDO and contractor policies, standards and procedures Group and SIEP HSE guidelines such as EP95 000

Audit Process Familiarisation Review & Testing Reporting Terms of reference Audit programme EP95-0130 Review & Testing Study Documentation Site visit Test findings Interviews Reporting Agree findings Present Findings Drafting Editing Report Finalisation

Terms of Reference Scope Exclusions: The scope is limited to those facilities, resources and controls necessary to operate the xxxxxxxxxx Expansion Facilities. Exclusions: Corporate HSE issues not directly related to the Facilities.

Specific issues 1 Demonstration that HSE risks are ALARP Design, installation, commissioning Future operation HSE Case Close out of audits and reviews HAZOP close out Fitness for purpose hardware Constructed to design Effectiveness of change control

Specific issues 2 Commissioning Procedures Plans & Procedures Personnel Concurrent operations risks Procedures Operating, Maintenance Availability and adequacy Emergency Understood and exercised

Specific issues 3 Operations plans for start-up Resources & services Organisation Responsibilities Contractor / PDO Interfaces Communications Resources & services Personnel Spares, consumables Environmental compliance

Audit Programme Sat 31/5 Opening Presentations Doc. Review Sun 1/6 Coastal Interviews Mon 2/6 Visit Site - Compile notes Tue 3/6 Return from Site Wed 4/6 Compile Report Sat 7/6 Draft Report/Final Presentation Wed 11/6 Issue Final Report

Audit opinions The IAC defines 4 possible audit opinions: Good Fair Poor (equivalent to IAG Unsatisfactory) Unacceptable The definitions are in terms of: the level of concern the inference for senior management

Audit opinion derivation Based principally upon an assessment of severity and number of Findings Definition of Few and Many: Few  20 Many  40 each Finding to contain only one weakness

AUDIT OPINION Few  20 Findings Many  40 Findings

Audit Recommendations For a Pre Start-Up audit, an indication is given, in the classification of Findings of: those that should be closed out prior to the introduction of hydro-carbons - classified (I) those that should be closed out prior to close out of this project - classified (C) those that are not directly related to project close out - classified (F)

Weakness Classification Matrix B C D E Severity People Assets Environ- ment Repu- tation Never heard of in EP industry Has occurred in EP industry Has occurred in the audited OU Happens several times a year in the audited OU Happens several times a year in the audited facility No injury No damage No effect No impact 123 Low Slight injury Slight damage Slight effect Slight impact 1 2 Minor injury Minor damage Minor effect Minor impact Medium Consider- able impact 3 Major injury Local damage Localised effect High 4 Single fatality Major damage Major effect National impact Inter- national impact Serious Multiple fatalities Extensive damage 5 Massive effect A B C D _____ total High: Though not serious, essential to be brought to Management attention. Includes medium weaknesses as repeat from previous reports. Low: No major HSE impact at process level, correction will assure greater effectiveness/efficiency in process concerned. Serious: Exposes OU to a major extent in terms of achievement of corporate HSE objectives or results. Medium: Could result in perceptible and undesirable effect on achievement of HSE objectives.

Report Principles Report is collective view of team no reference to sources whole team review whole report facts reported are as agreed by all the team judgements are by consensus as far as practicable wording agreed to as to intended meaning audit leader has casting vote in case of disagreement where possible, root causes identified Final draft report before team disbands no later changes, only minor (punctuation, grammar) editing in CO final report within two weeks

THE END

Structure of Questionnaires Generic Questionnaire (common to all HSE Audits) Leadership & Commitment Policy & Strategic Objectives Organisation, Responsibilities, Resources, Contractor Management. Communications, HSE-MS Documentation, Standards & Change Control Hazards and Effects Management Planning & Procedures Implementation & Monitoring Audit Management Review Subsidiary Questionnaire Facilities Subsidiary Questionnaire Facilities Subsidiary Questionnaire Start-Up Subsidiary Questionnaire Seismic Subsidiary Questionnaire Drilling Subsidiary Questionnaire Environment Subsidiary Questionnaire Health

EP-HSE Audit Method Audit of HSE MS, fully covering H, S and Focus on Risk OU Staff involved Based on OU / Contractor standards Bottom up Approach Significance & breadth of findings Assessment of the 33 HSE MS sub elements of the HSE MS Self Assessment Questionnaire (levels 1-4) Follow up: OU responsibility Audit of HSE MS, fully covering H, S and Sampling Process Questionnaire based x

HSE Audit Overview Auditors will: operate in pairs (sometimes three) make an appointment to see you no surprise visits try to make it as easy as possible be only interested in facts, not speculation (interested in your view in how to improve) possibly use a questionnaire in the interview ask open ended questions like “How ..”, “In what way…” interview a “vertical slice” of the organization look for the good as well as the less than adequate

Report Index 1 Introduction 2 Executive Summary Audit opinion and justification HSE MS element summary 3 Audit Findings and Recommendations HSE Management System (Tables) Subsection for each of HSE-MS sub elements Appendices Definitions of Audit opinion and classification Classified recommended actions Terms of Reference Abbreviations HSE MS sub element assessment

Report Principles Report is collective view of team no reference to sources whole team review whole report facts reported are as agreed by all the team judgements are by consensus as far as practicable wording agreed to as to intended meaning Audit leader has casting vote in case of disagreement where possible, root causes identified Final draft report before team disbands no later changes, only minor (punctuation, grammar) editing in CO final report within one week