1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.

Slides:



Advertisements
Similar presentations
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
Advertisements

Generation Peak Demand : 132 GW Growth Rate: 9 – 10 % (per annum) India - Present Power Scenario Total Installed Capacity – GW (As on )
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
W E L C O M E Power Grid Corporation of India Limited.
Sanjay Garg General Manager PGCIL/ Ministry of Power
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC, BANGALORE PRESENTATION By L.K.Kanungo SOUTHERN REGIONAL GRID ON U.K.Verma &
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 34,207.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
POWER GRID CORPORATION OF INDIA LTD.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Operating the Indian Electricity Grid Challenges and Future Outlook R.P.Singh Chairman and Managing Director Power Grid Corporation of India Limited.
POWER GRID CORPORATION OF INDIA LTD.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Overall National Grid Development: Constraints & Options
SOUTHERN REGION EXPERIENCE
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
WELCOME SHRI A. MANGLIK TO EXECUTIVE DIRECTOR
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
UTILITY OF MODERN LOAD DISPATCH COMMUNICATION SYSTEMS
1 KADAMPARAI PUMP OPERATION GENERATOR MODE PUMP. 2 KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU) MONTHS *
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
1 PRESENTATION ON FREQUENCY CONTROL AND FREE GOVERNOR OPERATION TO THE OFFICERS OF CENTRAL ELECTRICITY AUTHORITY On 4 th April, 2005 by V.K. Agrawal SRLDC,
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
POWERGRID Welcomes Shri Atal Bihari Vajpayee Hon ’ ble Prime Minister of India on Inauguration of Northern Region Unified Load Dispatch and Communication.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
ENERGY CONSERVATION IN SR - A CASE STUDY
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
REGIONAL GRIDS IN INDIA – QUICK FACTS
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
Presentation transcript:

1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006

2 PRESENTATION OVERVIEW  REGIONAL GRIDS IN INDIA – QUICK FACTS REGIONAL GRIDS IN INDIA – QUICK FACTS  SOUTHERN REGIONAL GRID – AN OVERVIEW SOUTHERN REGIONAL GRID – AN OVERVIEW  GRID CONTROL - ISSUES & CARDINAL EVENTS GRID CONTROL - ISSUES & CARDINAL EVENTS  POWER SECTOR - THRUST AREAS & ISSUES POWER SECTOR - THRUST AREAS & ISSUES  SR GRID – PROJECTS IN PROGRESS SR GRID – PROJECTS IN PROGRESS

3 REGIONAL GRIDS QUICK FACTS

4 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERNNORTHERN :- 34,207 MW EASTERNEASTERN :- 16,478 MW SOUTHERNSOUTHERN :- 36,921 MW WESTERNWESTERN :- 37,100 MW NORTH-EASTERNNORTH-EASTERN :- 2,404 MW TOTAL 127,110 MW REGIONAL GRIDS

5 Inter Regional Links – Current Capacity 2700 MW 1200MW 2000MW 1200 MW 900 MW 33,782 MW 16,680 34,867 MW 36,031 MW MW 1650 MW Present IR Capacity = 11,500 MW

MW 1200 MW 6050 MW 5500 MW 1400 MW 6150 MW 36,700 MW OF INTER- REGIONAL POWER BY 2012 EASTERN REGION SOUTHERN REGION WESTERN REGION NORTHERN REGION NORTH- EASTERN REGION INTER-REGIONAL TRANSFER BY END OF 11 th PLAN (2012) 4000 MW

7 TRANSMISSION VOLTAGE OWNERSHIPTOTAL CENTRALSTATE Circuit Kilometer kV HVDC 4,3721,5045, kV charged at 400 kV , kV40,85422,60763, kV9,22098,521107, kV*2,15293,12695,278 Total57,515216,167273,682 EHV Infrastructure

8 UTTARANCHAL

9 Ministry of Power, Govt of India MOP, State Govt. Central Sector Companies Generating Utilities- NTPC, NHPC, NEEPCO, NPCIL Transmission Utility- POWERGRID APEX BODY -RLDC Finance-PFC Rural Electrification- REC Authorities CEA R&D CPRI, NPTI, PSTI Mega IPPs State Sector Generation Transmission Distribution State IPPs CERC SERC Appellate Tribunal Trading Co. Pvt. DISCOM Indian Power Sector - Institutional Framework

10 INDIAN POWER SECTOR - HIERARCHICAL SET UP AND TYPICAL FUNCTIONS CEA CENTRAL ELECTRICITY AUTHORITY UNDER CENTRAL GOVT.,POWER MINISTRY PLANNING, SPECIFYING TECHNICAL STANDARADS, PROMOTE RESEARCH AND MEASURES FOR ADVANCING THE SKILLS AND ASSISTING & ADVISING THE GOVT CERC CENTRAL ELECTRICITY REGULATORY COMMISSION CENTRAL REGULATOR CENTRAL GOVT. RPC REGIONAL POWER COMMITTEE (FORMERLY REB) – ONE AT EACH REGION COMMITTEE FOR FACILITATING THE INTRGRATED OPERATION IN THE REGION CTU RLDC REGIONAL LOAD DESPATCH CENTRE – APEX BODY – TO ENSURE INTEGRATED OPERATION OF THE SYSTEM IN THE REGION CGS CENTRAL GENERATING STATIONS CENTRAL STATIONS HAVING GENERATION CAPACITY ALLOCATED TO DIFFERENT STATES ON LONG TERM BASIS SERC STATE GOVT. IPP CENTRAL TRANSMISSION UTILITY TO UNDER TAKE TRANSMISSION OF ELECTRICITY THROUGH ISTS AND ITS PLANNING, COORDINATION, DEVELOPMENT AND TO PROVIDE NON- DISCREMENATORY OPEN ACCESS CPP SGC STU SLDC DISCOMS CONSUMERS STATE ELECTRICITY REGULATORY COMMISSION STATE GENERATING STATIONS OWNED BY GENCO’S/SEB’S INDEPENDENT POWER PRODUCERS CAPTIVE POWER PLANT STATE TRANSMISSION UTILTY RESPECTIVE TRANSC’S/SEB STATE LOAD DESPATCH CENTRE DISTRIBUTION COMPANIES – FORMED AFTER UNBUNDLING

11 ALL INDIA MARKET COMPOSITION (1,27,110 in 2006) AS on

12 Source wise composition of installed capacity in India ( 1,27,110 in 2006) AS on

13 ALL INDIA GENERATION COMPOSITION Total Market Size = BU Total Installed Capacity 1,27,110 MW

14 Sector wise consumption of electricity in India Total Installed Capacity 1,27,110 MW

15 SOUTHERN REGIONAL GRID OVERVIEW

16 SOUTHERN REGION – GEOGRAPHY ANDHRA PRADESH TAMIL NADU KARNATAKA KERALA POPULATION : CRORES ( 22% OF INDIA) AREA :- 651 (‘000 SQ KM)(19% OF INDIA) INSTALLED CAPACITY:- 36,921 MW(29.0%) WEATHER :- South-west monsoon North-east monsoon SEA COAST :- AROUND 4000 KM

17 SR STATES – POWER SYSTEM STATISTICS ANDHRA PRADESH INSTALLED CAPACITY – 8944 MW MAX DEMAND MET – 8241 MW DAILY CONSUMPTION MAX – 171 MU DAILY CONSUMPTION AVG – 142 MU CONSUMER PROFILE – INDS -27%, DOM-22%, COMM- 5%, IRRI-39% & OTHERS-7% KARNATAKA INSTALLED CAPACITY – 6180 MW MAX DEMAND MET – 5612 MW DAILY CONSUMPTION MAX – 125 MU DAILY CONSUMPTION AVG – 95 MU CONSUMER PROFILE – INDS -26%, DOM-19%, COMM- 7%, IRRI-39% & OTHERS-9% KERALA INSTALLED CAPACITY – 2284 MW MAX DEMAND MET – 2602 MW DAILY CONSUMPTION MAX – 41 MU DAILY CONSUMPTION AVG – 34 MU CONSUMER PROFILE – INDS -34%, DOM-44%, COMM- 13%, IRRI-2%& OTHERS-7% TAMIL NADU INSTALLED CAPACITY – MW MAX DEMAND MET – 8371 MW DAILY CONSUMPTION MAX – 166 MU DAILY CONSUMPTION AVG – 135 MU CONSUMER PROFILE – INDS -39%, DOM-25%, COMM- 7%, IRRI-24% & OTHERS-5%

18 ANDHRA PRADESH POPULATION :- 7.6 CRORES AREA :- 275 (‘000 SQ KM) NO OF CONSUMERS :- 162 LAKHS PER CAPITA CONS. :- 719 UNITS MAIN AGRICULTURE CROP :- RICE CLIMATIC CONDITION :- HOT AND HOT & HUMID SR STATES – GEOGRAPHY KARNATAKA POPULATION :- 5.3 CRORES AREA :- 192 (‘000 SQ KM) NO OF CONSUMERS :- 105 LAKHS PER CAPITA CONS. :- 642 UNITS MAIN AGRICULTURE CROP :- COFFEE & RAGI CLIMATIC CONDITION :- HOT AND HOT & HUMID KERALA POPULATION :- 3.2 CRORES AREA :- 39 (‘000 SQ KM) NO OF CONSUMERS :- 61 LAKHS PER CAPITA CONS. :- 386 UNITS MAIN AGRICULTURE CROP :- COCONUT & SPICES CLIMATIC CONDITION :- HUMID TAMIL NADU POPULATION :- 6.2 CRORES AREA :- 130 (‘000 SQ KM) NO OF CONSUMERS :- 152 LAKHS PER CAPITA CONS. :- 866 UNITS MAIN AGRICULTURE CROP :- SUGAR CANE & OIL SEEDS CLIMATIC CONDITION :- HOT AND HOT & HUMID

19 INSTALLED CAPACITY IN SR SUMMARY OF INSTALLED CAPACITY(MW) AS ON AGENCYHYDROTHERMALGAS/DIESELWIND/OTHERSNUCLEARTOTAL ANDHRA PRADESH KARNATAKA KERALA TAMILNADU PONDICHERRY CENTRAL SECTOR IPP TOTAL (30%) (43%) 4599 (13%) 4336 (12%) 880 (2%) (100%)

20 SOURCE-WISE INSTALLED CAPACITY OF SR All Figures In MW TOTAL 36,921 MW HYDRO THERMAL WIND/OTHERS NUCLEAR NAPTHA/GAS/DIESEL

GENERATING UNITS IN SOUTHERN REGION A.P KAR TNKER GENERATORS ABOVE 1000 MW GENERATORS 500 – 1000 MW GENERATORS BELOW 500 MW TYPICAL GENERATOR SPREAD IN SR UNIT CAPACITYAPKARKERTNCGSTOTAL THERMAL (500 MW) 2810 THERMAL ( MW) GAS/THERMAL ( MW) HYDRO (>50 MW) TOTAL HYDRO - THERMAL - GAS / NAPTHA - NUCLEAR

CPP/IPP PLANTS IN SOUTHERN REGION A.P KAR TNKER Station NameI/C in MW Variable Cost (Ps) TATA ELECTRIC JINDAL THANNEERBAVI Station NameI/C in MW Variable Cost (Ps) KASARGOD PCL22470 BSES KUTHUNGAL21--- MANIYAR12--- KAYAMKULAM Station NameI/C in MW Variable Cost (Ps) HITEC15 TCPL63.5 GMR VASAVI SAMALPATTY ST-CMS P P NALLUR ABAN11388 MADURAI POWER ARKAY38 Station NameI/C MW Variable Cost (Ps) SIMHADRI BSES VEMAGIRI PGL233 SPECTRUM JEGURUPADU EXT. 220 JEGURUPADU LANCO355125

23 LOAD MW LOAD MW TYPICAL LOAD SPREAD IN SR

KHAMMAM VIJAYAWADA NAGARJUNASAGAR GAZUWAKA HYDERABAD RAICHUR GOOTY HOODY SALEM UDUMALPET TRICHUR MADURAI TRICHY MADRAS NEYVELI CUDDAPAH DAVANAGERE RAMAGUNDAM BANGALORE MUNIRABAD P P P P P P P P P P P P P P KOLAR 63 HOSUR 1 60 P NELLORE NELAMANGALA KURNOOL KALPAKKA SIMHADRI HIRIYUR TALAGUPPA MAMIDIPALLY SRI SAILAM -- OF NTPC -- OF ANDHRA PRADESH -- OF TAMIL NADU -- OF NLC -- OF POWERGRID 400KV SUB-STATIONS IN SR NEYVELI TPS I (EXP) POWERGRIDSTATEOTHERSTOTAL AP KAR KER 2 2 TN TOTAL TRIVENDRUM NARENDRA VEMAGIRI GMR JEGRUPADU EXTN MEHA BOOB NAGAR CHITTOOR -- OF NPC KAIGA MYSORE -- OF KARNATAKA ALMATHI

25 TRANSMISSION IN SOUTHERN INDIA ABOUT 3000 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS VOLTAGE LEVELAPKARKERTNCGS TOTAL 400 KV /230 KV /110 KV TOTAL

26 TYPICAL LOAD CURVE OF SR WINTER MONSOON SUMMER EVENING PEAK CONSUMPTION

27 GRID CONTROL ISSUES & CARDINAL EVENTS

28 GRID OPERATION – TYPICAL ISSUES IN PAST LOW / HIGH FREQUENCY PROBLEMS –FREQUENCY EXCURSES TO LOW/HIGH VALUES LOW / HIGH VOLTAGE OPERATION –CRITICALLY LOW VOLTAGES AT LOAD CENTRES –SUBSTANTIALLY HIGH VOLTAGES AT FAR ENDS SYSTEM BROWNOUTS / BLACK OUTS –SEPERATION OF SYSTEMS / LOSS OF LOAD ECONOMIC IN-STABILITY / INCREASED ELECTRICAL LOSSES –UNRELIABLE / INEFFICIENT OPERATION OF EQUIPMENT

29 GRID OPERATION – PRESENT STATUS  STABILISED SYSTEM FREQUENCY STABILISED SYSTEM FREQUENCY  IMPROVED VOLTAGES IMPROVED VOLTAGES  MERIT ORDER OPERATION MERIT ORDER OPERATION  INTER REGIONAL EXCHANGES INTER REGIONAL EXCHANGES  IMPROVED GRID SECURITY IMPROVED GRID SECURITY

30 GRID PRESENT STATUS -- CARDINAL EVENTS AVAILABILITY BASED TARIFF UNIFIED LOAD DESPATCH SCHEME GENERATION ADDITION INTERREGIONAL AC / HVDC LINKSINTERREGIONAL AC / HVDC LINKS SHORT TERM OPEN ACCESS OPERATIONAL EXELLANCE ABTUI ULDC

31 Components of inter-utility tariff (Pre – ABT Mechanism) COMPOSITE TARIFF COMPRISING OF :  Fixed charges  Interest on loans  Depreciation  O & M charges  Return on equity  Interest on Working Capital  Energy charges (fuel cost)  Surcharge & other levies

32 Components under Availability Based Tariff (ABT) TARIFF CONSISTS OF MAINLY THREE COMPONENTS :  Capacity charges  Energy charges  Unscheduled Interchange (UI)

33 UI RATE Rate of Unscheduled Drawal/Injection Frequency (Hz)Rate (p/u) Above and below570

34 UI - A RATIONAL AND SCIENTIFIC VECTOR  BALANCING MARKET  MERIT ORDER OPERATION  TRANSPARENCY  NEUTRALITY  SIMPLICITY  PRICE SIGNAL EASILY AVAILABLE  NO NEED TO NEGOTIATE ANY PRICE  EASY SETTLEMENT  EASY TO UNDERSTAND AND IMPLEMENT  EASE OF REGULATION

35 RTU SUB LDC SLDC ERLDC WRLDCNRLDCSRLDCNERLDC NLDC 32 Nos. 51 Nos Nos. Unified Grid Operation 5 Nos. National Level Regional Level State HQ Level Group / Distt Level Plant / Sub- Station Level

36 RLDC,Bangalore KalamasseryHyderabad Bangalore Chennai Cuddapah Warangal Vijayawada Kalam’erry Kannur Trivandrum Chennai Erode Madurai Bangalore Lingusugur Hubli CPCC SCC, Pondy Hyderabad Hierarchy of The ULDC Scheme in Southern Region Andhra KeralaTamilnaduKarnataka

37 Southern Region Grid Complexities in Monitoring & Control Annual Inter- Regional Energy Transfer ≈10,000MU Transformers (220kV and above) 480 nos. Installed Capacity ≈36031 MW Integrated Opn of Ten Power Utilities Dynamic Grid Conditions Generators – Hydro, Thermal,Gas/IP P 422 nos. Transmission Network 400/220kV ≈ Ckm 30,000 POINTS Active Power, Reactive Power, Voltage, Frequency, Transformer Tap Position, Circuit Breaker Position, Isolator Position etc Transformati on Capacity ≈ MVA

38 GROWTH OF INSTALLED CAPACITY OF SR IN MW

39 KADAMPARAI PUMP OPERATION GENERATOR MODE PUMP

40 KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU) MONTHS * GENERATOR MODE PUMP MODE GENERATOR MODE PUMP MODE GENERATOR MODE PUMP MODE APRIL MAY JUNE JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH TOTAL Note: The plant was under shutdown from 16th Sep 2004 to 28th April 05 for dam maintenance works.

41 KADAMPARAI ENERGY GENERATED/PUMPED DURING LAST 5 YEARS (MU)

42 LOW DEMAND(VALLEYS) SHARP PEAKS 0000 HRS OF 01 SEP AUG 0630 AUG 0631 AUG 06

43 GENERATING UNITS PARTICIPATION IN PRIMARY RESPONCE SHARAVATHI -1 FREQ DROP FROM HZ TO HZ i.e. ~ 0.45HZ

44 TRAINING ON ULDC SYSTEM SLNAME OF THE TRAININGFROMTOParticipantsMan Days 1CISCO ROUTER & NETWORKING XA-21 USER LEVEL RTNA WORKSHOP AIX OPERATING SYSTEM XA-21 USER LEVEL SYBASE DATABASE ADMIN XA-21 USER LEVEL NMS TRAINING RTU TRAINING JAVA FOR SCADA ENVIRONMENT