POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE.

Similar presentations


Presentation on theme: "POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE."— Presentation transcript:

1 POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE

2 INTRODUCTION EVOLUTION OF PS IN INDIA ELECTRICITY ACTS I/C 1947 & AT PRESENT GROWTH OF I/C GROWTH OF INDIAN POWER SECTOR FORMS OF POWER GROWTH PLANS RLDC POWERGRID IN SR IEGC PARAMETERS FREE GOVERNOR OPERATION ABT

3 LINKS ANDHRA PRADESHKARNATAKA KERALATAMIL NADU SR GRID HIGHLIGHTS SR INSTALLED CAPACITY STATEWISE BREAKUP OF I/C TYPICAL CITY LOADS GROWTH OF I/C & PEAK DEMAND IMPORT THROUGH HVDC INTER-REGIONAL IMPORTS FREQ SPECTRUM 2003-04 U/F RELAY VOLTAGE SPECTRUM 2002-03 SR GRID MAP 3D FREQUENCY JULY-03 EXPECTED T/L EXPECTED GENERATION INTER-STATE TIE LINES SHARE ALLOCATION TALCHER CGS GEN COST INTER-REGIONAL IMPORTS 6 Yrs PROBLEMSSOLUTIONSRESERVOIR POSITION Hierarchy of ULDC Communication Channel Control Centres ULDC PROJECT 3D DEMAND JULY-03 INTER-REGIONAL LINKS MILESTONES OF SRSPARE POST ABT

4 ANDHRA PRADESH QUICK FACTS GRID HIGHLIGHTS INSTALLED CAPACITY CONSUMER PROFILE PROBLEMS GZK EVACUATION VTS & LANCO EVACUATION KTS EVACUATION TWIN CITY RING MAIN HYDRO THERMAL N’SAGAR & SRISAILAM RESERVOIR JALAPUT RESERVOIR EXPECTED GEN. ADDITIONS EXPECTED TRANS. ADDITIONS COST OF GENERATORS NATURAL ADVANTAGES POWER REFORMS 3D DEMAND JULY-03 REACTIVE POWER MANAGEMENT

5 KARNATAKA QUICK FACTS GRID HIGHLIGHTS INSTALLED CAPACITY CONSUMER PROFILE PROBLEMS RTPS EVACUATION KAPS & NJPH EVACUATION NELAMANGALA FINAL NELAMANGALA PRESENT SHARAVATHY FINAL SHARAVATHY RIVERS AND RESERVOIRS 220KV T/L EXPECTED EXPECTED GEN. ADDITIONS 400KV T/L 3D DEMAND JULY-03 VARIABLE COSTS EVOLUTION PSP 1975 PSP 1985 PSP 1995 SHORT CKT LEVEL

6 KERALA QUICK FACTS GRID HIGHLIGHTS INSTALLED CAPACITY CONSUMER PROFILE PROBLEMS WIND MILL POTENTIAL GENERATION SCHEME GROWTH OF PER CAPITA INCOME INFLOWS OF IDDUKI & KAKKI BREAKUP OF ENERGY CONSUMED GROWTH OF I/C Vs DEMAND GROWTH OF GEN & CONSUMPTION POWER MAP EXPECTED GEN. ADDITIONS 3D DEMAND JULY-03 VARIABLE COSTS

7 TAMIL NADU QUICK FACTS GRID HIGHLIGHTS INSTALLED CAPACITY CONSUMER PROFILE PROBLEMS PROXIMICITY OF GENERATING STN. LOAD CENTRES TYPICAL LOADS IN MAIN CITIES LIST OF HYDRO STATIONS PUMP STORAGE WIND ENERGY CHENNAI SUPPLY TOTAL INFLOWS EXPECTED GEN. ADDITIONS EXPECTED TRANS. ADDITIONS 3D DEMAND JULY-03 VARIABLE COSTS

8 SOUTHERN REGIONAL GRID ▀ Comprises four States and Union Territory of Pondicherry 1.ANDHRA PRADESH 2.KARNATAKA 3.KERALA 4.TAMIL NADU 5.Union Territory of Pondicherry ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,100 MW (200x3 + 500x3) Neyveli Lignite Corporation Ltd. - II : 1,470 MW (210 x 7) Neyveli TPS I (Expansion) : 420 MW (210 X 2) Madras Atomic Power Station : 340 MW (170 x 2) Kaiga Generating Station : 440 MW (220 x 2)

9 SR GRID MAP KHAMMAM VIJAYAWADA NAGARJUNASAGAR VISAKHAPATNAM (POWERGRID) HYDERABAD RAICHUR GOOTY HOODY SALEM UDUMALPET TRICHUR MADURAI TRICHY MADRAS NEYVELI CUDDAPAH DAVANAGERE KAIGA 115 317 RSTPP BHADRAVATI 130x2 164x2 182 151 181 173 302 308 172 277 279 155 178x2 PONDICHERY BANGALORE SIRSI MUNIRABAD P P P P P P P P P P P P P P P N KOLAR PALLOM KAYANKULAM EDAMON TALCHER JEYPORE 63 187 2x78 2x221 54 HOSUR KADRA KODASAALY Nagjhari 1 120 60 MAPS P SSLMM MMDP THIRUVANATHAPURAM ALMATHI NELLORE 400 KV LINE PRESENTLY OPERATED AT 220 KV NELAMANGALA KURNOOL GAZUWAKA(AP) SIMHADRI NTPC HIRIYUR 189 195 267x2 258 242 98 175 179 127 130x2 221x2 146x2 52x2 197x2 301x2 8x4 15x2 300 28 330 TALAGUPPA

10 POWERGRID SRLDC T A.P KAR T.N KER MAH ORISSA RAMAGUNDAM NEYVELI MAPS GOA PONDICHERRY HVDC BI POLE HVDC B2B STATION CENTRAL GEN.STATION CHANDRAPUR JEYPORE GAZUWAKA KOLHAPUR BELGAUM U.SILERU L.SILERU BALIMELA BARSUR 220 kV LINE 400 kV LINE M.P 110 kV HVDC LINE AMBEWADI INTER REGIONAL LINKS KOLAR TALCHAR KAIGA

11 INTER REGIONAL IMPORTS (MU)

12 INSTALLED CAPACITY OF SOUTHERN REGION AS ON 01-08-2003 IN MW 28711MW

13 STATE/CGSHYDROTHERMALGASWINDIPPNUCLEARTOTAL ANDHRA PRADESH 34953943273212028915 KARNATAKA 3097159853415041 KERALA 179523535021712553 TAMIL NADU 19933570330199886900 PONDY 32 NTPC 2100 TALCHER Stage II 500 NLC TS II 1470 NLC TPS I (Exp) 420 MAPS 340 KAIGA 440 TOTAL 103801362695328273478028711 IN % 36%48%3%0.1%10%3% INSTALLED CAPACITY OF SR IN MW AS ON 1 ST AUG 03

14 STATEWISE BRAKUP OF INSTALLED CAPACITY IN SR AS ON 01.08.2003 IN MW 28711MW

15 Installed Capacity-28,711MW Average Daily Consumption- 368 MU Average Grid Frequency- 49.77 HZ Peak Demand Met-20,428 MW Demand Deficit- 10 % Energy Deficit- 7 % SOUTHERN REGIONAL GRID HIGHLIGHTS

16 TYPICAL LOADS OF MAJOR CITIES (MW) CITYLOAD BANGALORE1000-1100 MW HYDERABAD- SECUNDERABAD 1000-1100 MW CHENNAI950-1050 MW THIRUVANANTHAPURAM225 MW

17 Growth of Installed Capacity & Peak Demand Met Average Rate of Growth of Installed Capacity (MW): 4.5 % Average Rate of Growth of Peak Demand met (MW): 5.6 %

18 IMPORT THROUGH HVDC 77 Crores 298 Crores 430 Crores 578 Crores 829 Crores 846 Crores

19 2000 - 012001 – 022002 - 03 FROM ER 25133666 4199 FROM WR 527788 165 FROM MSEB 1080 0 FROM GRIDCO (Orissa) 750634 41 FROM CSEB 016 0 TOTAL 38985104 4405 IN MUs INTER REGIONAL LINKS

20 FREQUENCY SPECTRUM FOR 2003- 04 (UPTO JULY-03) LAST FOUR YEARS

21 Frequency Profile: Last 4 years

22 AUTOMATIC UNDER FREQUENCY LOAD SHEDDING SCHEME As per 131 st SRE Board meeting, under frequency relays are to be set to operate in 3 stages at 48.2Hz, 48.0Hz & 47.8Hz instantaneous. Present Status of relief through U/F relays: Sl.NoSTATE 48.2 Hz./Inst 48.0 Hz./Inst. 47.8 Hz./Inst. 1 Andhra Pradesh 429695830 2Karnataka385-635 Off peak-Peak 215-440 Off peak-Peak 395-660 Off peak-Peak 3Kerala73-117 Off peak-Peak 118-203 Off peak-Peak 291-434 Off peak-Peak 4Tamil Nadu258409785 Total1145-14391381-17472301-2709

23 VOLTAGE SPECTRUM FOR 2002-2003

24 PROBLEMS LOW GRID FREQUENCY LOW GRID FREQUENCY LOW VOLTAGES LOW VOLTAGES HEAVY MVAR DRAWALS HEAVY MVAR DRAWALS CAPACITOR INSTALLATION-BACKLOG CAPACITOR INSTALLATION-BACKLOG MEAGRE RELIEF FROM AUFR’S MEAGRE RELIEF FROM AUFR’S RELUCTANCE - MANUAL LOAD SHEDDING RELUCTANCE - MANUAL LOAD SHEDDING TRANSMISSION CONSTRAINTS TRANSMISSION CONSTRAINTS EVACUATION PROBLEMS EVACUATION PROBLEMS TRUNK LINES LOADING TRUNK LINES LOADING LITTLE OR NO REDUNDANCY LITTLE OR NO REDUNDANCY PROTECTION CO-ORDINATION PROTECTION CO-ORDINATION GRID GRID DEFENCELESS DEFENCELESS VULNERABLE VULNERABLE

25 SOLUTION MAINTAIN FREQ BETWEEN 49-50.5 HZ MAINTAIN FREQ BETWEEN 49-50.5 HZ ACCELERATE SHUNT CAPACITOR INSTALLATION ACCELERATE SHUNT CAPACITOR INSTALLATION REINSTATE 2 STAGE UFR’S REINSTATE 2 STAGE UFR’S PROTECTION CO-ORDINATION PROTECTION CO-ORDINATION AUGMENTATION OF TRANSMISSION AUGMENTATION OF TRANSMISSION SCIENTIFIC SETTLEMENT SYSTEM-ABT SCIENTIFIC SETTLEMENT SYSTEM-ABT FREE GOVERNOR MODE FREE GOVERNOR MODE SELF HEALING MECHANISM SELF HEALING MECHANISM CONJUNCTION CONJUNCTION

26 MILE STONES NTPC U # 1 200MW 27-10-1983 NTPC U # 1 200MW 27-10-1983 NLC II U # 3 210MW 29-03-1986 NLC II U # 3 210MW 29-03-1986 MAPS U # 1 235MW 23-07-1983 MAPS U # 1 235MW 23-07-1983 KGS U # 2 220MW 02-12-1999 KGS U # 2 220MW 02-12-1999 AP VTPS U # 1 210MW 01-11-1979 AP VTPS U # 1 210MW 01-11-1979 KAR RTPS U # 1 210MW 23-09-1985 KAR RTPS U # 1 210MW 23-09-1985 TN TTPS U # 1 210MW DEC-1978 TN TTPS U # 1 210MW DEC-1978 KER KyTPS U#1 115MW 02-11-1998 KER KyTPS U#1 115MW 02-11-1998 CHANDRAPUR B t B29-09-1997 CHANDRAPUR B t B29-09-1997 GAZUWAKA B t B20-03-1999 GAZUWAKA B t B20-03-1999 TALCHER-KOLAR HVDC 16-09-2002 TALCHER-KOLAR HVDC 16-09-2002

27 RLDC,Bangalore KalamasseryHyderabad Bangalore Chennai Cuddapah Warangal Vijayawada Kalam’erry Kannur Trivandrum Chennai Erode Madurai Bangalore Davangere Hubli CPCC SCC, Pondy Hyderabad Hierarchy of The ULDC Scheme in Southern Region Andhra KeralaTamilnaduKarnataka

28 Communication Channel for Information flow Sub-LDC SLDC RLDC SLDC Sub-LDC RTU Wide Band / PLCC Commn Wide Band Commn Wide Band Commn (MW / FO) RTU

29 Andhra Pradesh Karnataka Kerala Tamilnadu UT of Pondy Vijayawada Warangal HYDERABAD Ghanapur Chinkampalli CHENNAI Pondy Madurai Kannur-B KALAMASSERY Vydyuthi Bhavanam Erode MW Link FO Link State owned Link Sub-LDC SLDC RLDC Hubli Davangeree Bangalore Information Flow to Control Centres Satellite Ramagundam

30 RAMAGUNDAM SOUTHERN REGION OVERALL TELECOM BACKBONE NETWORK CENTRAL SECTOR RTUs 27(NEW) SALEM400 UDUMALPET TRICHUR NORTH MADURAI TRICHY SRIPERUMBUDUR NEYVELI DAVANAGERE PONDY SOMANAHALLI P N PALLOM KAYANKULAM VIJAYAWADA TALLAPALLI GAJUWAKA HYDERABAD GOOTY CHINAKAMPALLY WARANGAL PEDAPALLI DURSHED JAMMIKUNTA VTPS VIZAG SWS KAKINADA BOMMUR BHIMADOLE N’SAGAR PH SRISAILAM PH SRISAILAM LBPH KURNOOL SOMAYAJULAPALLI MUDDANOOR RTPP ANANTHAPUR SHAPURNAGAR GHANAPUR CH.GUTTA HYDERABAD 400 CHALAKUDI KALAMASSERY VIAKKAM KUNDARA PARIPALLI TRIVANDRUM NORTH VYDYUTHI BHAVANAM KOZHIKODE KANNUR - B MADURAI400 CHENNAI CHIDAMBARAM MYLADUTURAI SALEM230 ERODE SIVAGANGA KARAIKUDI THIRUMAYAM PUDUKOTTAI THIRUVARUR TANJORE KOVILVENNI ADANIKOTTAI INGUR PONGALORE PANRUTI VILLIANUR SP.KOVIL BANGALORE KUMBALGODI HUBLI APTRANSCO RTUs 82(NEW) TNEB RTUs 40 (NEW) 35 (EXST) KSEB RTU’S 30(NEW) KPTCL RTUs 22 (NEW) 21 (EXST) PONDY RTUs 5 (NEW) 10 (EXST) RSCC (1) CPCC (1) SLDC (4) SUB-LDC / SCC (14) FIBRE OPTIC LINK 110/132kv FIBRE OPTIC LINK (220kv) FIBRE OPTIC LINK (400kv) FIBRE OPTIC LINK (SEB) MICROWAVE LINK (39 links) SATELLITE LINK (KEB) RTU LOCATIONS (201)

31 REACTIVE POWER MANAGEMENT 1.TAP POSITION OF 400KV ICTs AT GAZUWAKA, VIJAYAWADA, KHAMMAM & HYDERABAD CHANGED. 2.MVAR INJECTION(220KV TO 400KV) THROUGH ICT AT GAZUWAKA BUS REVERSED. 3.MVAR EXPORT(400KV TO 220KV) THROUGH ICT AT VIJAYAWADA, KHAMMAM & HYDERABAD INCREASED. 4.APTRANSCO REPORTED IMPROVEMENT IN 220KV VOLTAGE PROFILE & REDUCTION IN LOSS BY 1%(APPROX.)

32 DateTAP POSITION CHANGED Stations 11-July12-July26-July29-July Gazuwaka 9 to 1212 to 14 Vijayawada 11 to 1414 to 16 Khammam 8 to 11 Ghanapur 5,4,3 to 7,6,5 7,6,5 to 9,8,7 REACTIVE POWER MANAGEMENT DATE GazuwakaVijayawadaKhammamGhanapur MvarhMvarMvarhMvarMvarhMvarMvarhMvar 08-Jul-02-87.60-3.65520.7021.7024.401.0220.600.86 09-Jul-02-1045.70-43.572357.9098.25295.4012.31-49.60-2.07 10-Jul-02-890.10-37.091617.3067.3918.700.787.300.30 11-Jul-02150.506.271678.7069.9520.500.858.000.33 12-Jul-02693.0028.881007.9042.000.00 71.802.99 13-Jul-02544.3022.682699.70112.4911.100.46310.0012.92 14-Jul-0222.900.951842.0076.7523.300.97427.8017.83 TOTAL-612.70-25.5311724.20488.51393.4016.39795.9033.16

33 VARIABLE COST OF SOME POWER STATION OF CENTRAL SECTOR POWER STATION/UNIT VARIABLE COST (Ps) KAIGA GEN. STATION310 (Total Cost) NEYVELI-II STG-II176 NEYVELI-II STG 1122 RAMAGUNDAM T.P.S91 M.A.P.S KALPAKAM57

34 CENTRAL SECTOR GENERATION EXPECTED 03-04 RAMAGUNDAM STAGE III TALCHER STAGE II500 TOTAL THERMAL500 IN MW

35 POWERGRID TRANSMISSION LINES EXPECTED 400KV MADURAI TRIVANDRUM 346 2003-04 IN CKM

36 RESERVOIR POSITION LEVEL IN MTS LEVEL30JUN03LEVEL30JUN02 JALAPUT 818.72823.2 LINGANMAKKI 532.5533.34 SUPA 514.1514.33 IDUKKI 700.17699.59 KAKKI 940.11923.47 NILGIRIS TOTAL ENERGY30JUN03ENERGY30JUN02 DIFF IN MU % DIFF 4299-57-58 475540-65-12 28228200 1881652314 1265175147 16416132 12771298

37 SHARE ALLOCATION BEFORE TALCHER(2000MW) IN MW

38 220KV INTER STATE TIE-LINES IN SERVICE –Tandur (AP) – Sadem (Kar) -Radial load on AP. –Gooty (AP) – Alipur (Kar)-Radial load on AP. –Chittoor (AP) – Tiruvalam (TN)-Radial load on AP. –Sulurpet (AP) – Gummidipundi (TN)-Radial load on AP. –Theni (TN) – Muzhiyar (Ker)-Radial load on Ker. ADVANTAGES: -REDUCTION IN CONGESTION IN 400KV LINES -IMPROVEMENT IN VOLTAGE PROFILE -REDUCTION IN LOSSES -REDUCTION IN ANGULAR DIFFERENCE -BETTER STABILITY

39 KARNATAKA

40 South India

41 THE FIRST POWER STATION IN SOUTH ASIA- SIVANSAMUDRA 1902

42 EVOLUTION: DID YOU KNOW? 1172 1902: ASIA’S FIRST HYDRO GENERATING STATION AT SHIVANSAMUDRA-42 MW SIVANSAMUDRA WAS CONNECTED TO KGF BY A 78.5 KV D/C LINE. POWER WAS DELIVERED AT 25 HZ!!! KGF SIVA A 78.5 KV D/C LINE WAS ALSO LAID BETWEEN SIVANSAMUDRA AND MYSORE. A FREQUENCY CONVERTER AT MYSORE DELIVERED 50 HZ! MYSORE

43 EVOLUTION: YEAR-1975 KOLHAPUR BELGAUM BANGALORE HUBLI SHARAVATHY MANGALORE MYSORE SHIMOGA SHARAVATHY-1964-1035 MW MUNIRABAD-1962-27 MW TB DAM-1955-14.4 MW BHADRA-1962-39.2 MW SIVA-1902-42 MW SHIMSHA-1940-17.2 MW MGHE-1947-120 MW

44 EVOLUTION -YEAR:1985 PEAK DEMAND MET: 1769 MW PEAK DEMAND MET: 1769 MW CONSUMPTION :9546 MU CONSUMPTION :9546 MU ABOUT 26 MU/DAY ABOUT 26 MU/DAY HYDRO GENERATION:8415 MU HYDRO GENERATION:8415 MU RTPS UNIT 1 SYNCH’D ON 29/3/1985 RTPS UNIT 1 SYNCH’D ON 29/3/1985 INSTALLED CAPACITY: INSTALLED CAPACITY: HYDRO:2009MW HYDRO:2009MW THERMAL210 MW THERMAL210 MW TOTAL2219 MW TOTAL2219 MW GRIDMAP 1985

45 EVOLUTION -YEAR:1985 KARNATAKA IN PARALLEL WITH MAHARASHTRA- BLGM-KOLHAPUR D/C LINE- SINCE AUG 1984 KARNATAKA IN PARALLEL WITH MAHARASHTRA- BLGM-KOLHAPUR D/C LINE- SINCE AUG 1984 KARNATAKA IMPORTED 723 MU FROM MSEB KARNATAKA IMPORTED 723 MU FROM MSEB PEAK FLOW ON THIS LINE 360 MW PEAK FLOW ON THIS LINE 360 MW NTPC SHARE WAS TAKEN RADIALLY FROM SEP 1984 ONWARDS NTPC SHARE WAS TAKEN RADIALLY FROM SEP 1984 ONWARDS GOOTY-MUNIRABAD:120 MW-271 MU GOOTY-MUNIRABAD:120 MW-271 MU HYDERABAD-SHAHBAD:120 MW-236 MU HYDERABAD-SHAHBAD:120 MW-236 MU GRIDMAP 1985

46 EVOLUTION -YEAR:1995 INTEGRATED OPERATION IN SOUTHERN REGION INTEGRATED OPERATION IN SOUTHERN REGION INSTALLED CAPACITY KARNATAKA: INSTALLED CAPACITY KARNATAKA: HYDRO2506 MW HYDRO2506 MW THERMAL840 MW THERMAL840 MW DIESEL128 MW DIESEL128 MW TOTAL3475 MW TOTAL3475 MW PEAK DEMAND MET3224 MW PEAK DEMAND MET3224 MW CONSUMPTION19718 MU CONSUMPTION19718 MU ABOUT 54 MU EVERY DAY ABOUT 54 MU EVERY DAY GRIDMAP 1995

47 KARNATAKA: QUICK FACTS TOTAL AREA191791 SQ KMS TOTAL AREA191791 SQ KMS NUMBER OF CONSUMERS105 LAKHS NUMBER OF CONSUMERS105 LAKHS CONNECTED LOAD14157 MW CONNECTED LOAD14157 MW 400 KV TL1456 CKM 400 KV TL1456 CKM 220 KV TL7433 CKM 220 KV TL7433 CKM 110 KV TL6058 CKM 110 KV TL6058 CKM 66 KV TL6196 CKM 66 KV TL6196 CKM 33 KV TL6543 CKM 33 KV TL6543 CKM TOTAL LENGTH OF HT LINES129434 KMS TOTAL LENGTH OF HT LINES129434 KMS

48 KARNATAKA GRID HIGHLIGHTS 2000-012001-022002-03 Installed Capacity(MW) 430247585041 Peak Demand Met(MW) 451046564805 Peak Demand Requirement(MW) 502758145415 % Deficit 10%20%17% Total Energy Consumed(MU) 274472859628882 Energy Requirement(MU) 309503225431118 % Deficit 11% 7% Average Daily Consumption 757879

49 INSTALLED CAPACITY OF KARNATAKA AS ON 01-08-2003 IN MW 5041MW

50 INSTALLED CAPACITY OF KARNATAKA: IN MWIN PERCENTAGE HYDRO309761% THERMAL159832% WIND50.1% IPP3417% TOTAL5041 AS ON 1 st AUG 03

51 CONSUMER PROFILE IN KARNATAKA

52 PROBLEMS FACED IN OPERATION GENERATION DEPENDENT ON MONSOON GENERATION DEPENDENT ON MONSOON LOAD CENTRE IN SOUTH-GENERATION IN NORTH AND NORTH WEST-500-600 KMS AWAY LOAD CENTRE IN SOUTH-GENERATION IN NORTH AND NORTH WEST-500-600 KMS AWAY RTPS EVACUATION- O/L OF RTPS- LINGASUGUR LINES RTPS EVACUATION- O/L OF RTPS- LINGASUGUR LINES KAPS EVACUATION –O/L OF KODASALLI- NJPH LINES– SLOW SWING KAPS EVACUATION –O/L OF KODASALLI- NJPH LINES– SLOW SWING NJPH EVACUATION- O/L OF NJPH-HUBLI NJPH EVACUATION- O/L OF NJPH-HUBLI LOADING OF GUTTUR-HIRIYUR-GB’NUR- DBPURA-HOODY LOADING OF GUTTUR-HIRIYUR-GB’NUR- DBPURA-HOODY GRIDMAP 220 SHOW ME

53 PROBLEMS FACED IN OPERATION LOW VOLTAGES IN SOUTHERN PART OF THE STATE – INSUFFICIENT SHUNT COMPENSATION – OVERLOADED LINES LOW VOLTAGES IN SOUTHERN PART OF THE STATE – INSUFFICIENT SHUNT COMPENSATION – OVERLOADED LINES OVERLOADING OF SOMANAHALLI ICT’S: OVERLOADING OF SOMANAHALLI ICT’S: MAX MW POSSIBLE AT 330KV = 770MW MAX MW POSSIBLE AT 330KV = 770MW ENHANCING TRANSFER CAPABILITY OF SIRSI-GUTTUR- FEW SPANS - TO BE CONVERTED TO TWIN MOOSE. ENHANCING TRANSFER CAPABILITY OF SIRSI-GUTTUR- FEW SPANS - TO BE CONVERTED TO TWIN MOOSE. IMPORT FROM KOLHAPUR - DIFFICULTY IMPORT FROM KOLHAPUR - DIFFICULTY GRIDMAP 220

54 LOAD 2250 MW LOAD 500 MW LOAD 1250MW LOW VOLTAGE ZONE ~ 1260MW Raichur ~ 1,565MW Nagjhari, Kodasalli, Kaiga & Kadra ~ ~ ~ ~ ~ ~ ~ 1,330MW Sharavathy, LDPH & MGHE Varahi 230MW ~ Tanirbavi 235MW 96 % OF I/C IS IN THE CIRCLES SHOWN

55 SHORT CKT LEVELS STATIONPEAK(MVA)OFFPEAK(MVA) SOMANAHALLI40063765562 HOODY 400 64185542 NLMNGLA 400 55374822 GUTTUR 400 49554403 MUNIRABAD 400 42623882 RTPS 400 64355911 HUBLI 220 3090 MANGALORE 220 631 MYSORE 220 1268

56 EVACUATION OF RTPS BB WADI RTPS 630 MW LINGASUGUR ML PURA HUBLI GADAG LINGAPUR ITTAGI GUTTUR JINDAL 120 MW MUNIRABAD RAICHUR SHAHBAD HUMNABAD SEDAM TANDUR(AP) KUSHTAGI RTPS 630 MW

57 KAPS AND NJPH EVACUATION KADRA-150MW KAIGA 440 MW KODASALLI 120 MW PONDA XELDAM A-WADI TATA 81 MW CHIKKODI BELGAUM NARENDRA M.L.PURA GADAG TO LINGAPUR TO SHARAVATHY GOA NJPH 855 MW SIRSI: BUS1 DAVANGERE HAVERI SIRSI: BUS2 HUBLI

58 EARLIER CONFIGURATION SHIMOGA GUTTUR HOODY HOODY 220 KV PEENYA HEBBAL KB CROSS B2 B4 A’HALLI B1 A’PALYA

59 PRESENT CONFIGURATION AT NELAMANGALA SHIMOGA GUTTUR HOODY HOODY 220 KV PEENYA HEBBAL NELAMANGALA ANCHEPALYA B1 B2 B4 B3

60 PRESENT CONFIGURATION AT NELAMANGALA RELIEF OF 100-125 MW ON HOODY ICT RELIEF OF 100-125 MW ON HOODY ICT VOLTAGE AT HOODY IMPROVED: 7-9 KV VOLTAGE AT HOODY IMPROVED: 7-9 KV VOLTAGE AT S’HALLI IMPROVED: 5-7 KV VOLTAGE AT S’HALLI IMPROVED: 5-7 KV LOADING OF S’HALLI-SB’PURA AND S’HALLI-ITPL 220KV LINES RELIEVED. LOADING OF S’HALLI-SB’PURA AND S’HALLI-ITPL 220KV LINES RELIEVED. ONE MORE STEP TOWARDS ACHIEVING A 400 KV RING MAIN AROUND BANGALORE ONE MORE STEP TOWARDS ACHIEVING A 400 KV RING MAIN AROUND BANGALORE

61 FINAL CONFIGURATION AT NELAMANGALA SHIMOGA GUTTUR HOODY HOODY 220 KV PEENYA HEBBAL NELAMANGALA ANCHEPALYA TO HOODY

62 PRESENT CONFIGURATION AT SHARAVATHY PRESENT CONFIGURATION AT SHARAVATHY SHARAVATHY:1035 MW SHIMOGA STRP:240,MW TO DAVANAGERE TALAGUPPA TO NELAMANGALA- OPEN AT NELAMANGALA.TERMINATION WORKS PENDING S1 S5 HUBLI JUMPER REMOVED 400 KV LINES OPERATED PRESENTLY AT 220 KV S2 S3S4

63 FINAL CONFIGURATION AT SHARAVATHY FINAL CONFIGURATION AT SHARAVATHY SHARAVATHY:1035 MW SHIMOGA STRP:240,MW TO DAVANAGERE TALAGUPPA:2*315 MVA TO NELAMANGALA S1 S5 HUBLI S2 S3S4

64 RIVERS AND RESERVOIRS GEN STN RESERVOIR FRL IN MU RIVER SHARAVATHY AND LDPH LINGANAMAKKI4660SHARAVATHY SUPA,NJPH, KODASALLI,KADRA, SUPA2990KALINADI BHADRABHADRABHADRA T.B.DAM, MUNIRABAD T.B DAM THUNGABHADRA VARAHI, MANI DAM PH MANI DAM 881VARAHI

65 VARIABLE COST OF SOME POWER STATION OF KARNATAKA POWER STATION/UNIT VARIABLE COST (Ps) TANIR BHAVI293 RAICHUR.T.PS.-IV270 RAICHUR.T.PS.-V260 RAICHUR.T.PS.-VI260 JINDAL(IPP) *260 YELEHANKA DEISEL205 RAICHUR.T.PS.-III165 TATA DIESEL160 RAICHUR.T.PS.-I144 RAICHUR.T.PS.-II144

66 EXPECTED GENERATION ADDITIONS KARNATAKA (IN MW) 03-0404-05 ALMATTI-HYDRO 290 VIJAYANAGAR - THERMAL 500 TOTAL 290500

67 220 KV TRANSMISSION LINES EXPECTED SHIMOGA – VARAHI DC - DEC 2002. SHIMOGA – VARAHI DC - DEC 2002. AMBEWADI – NARENDRA DC – DEC 2002 AMBEWADI – NARENDRA DC – DEC 2002 S’HALLI-MALUR-KOLAR-CHINTAMANI DC – DEC 2002 S’HALLI-MALUR-KOLAR-CHINTAMANI DC – DEC 2002 NARENDRA - HAVERI DC – DEC 2003 NARENDRA - HAVERI DC – DEC 2003 NELAMANGALA – DB PURA – DEC 2003 NELAMANGALA – DB PURA – DEC 2003 KOLAR – GOWRIBIDANUR DC – OCT 2004 KOLAR – GOWRIBIDANUR DC – OCT 2004

68 400KV TRANSMISSION LINES PLANNED 400 KV NELAMANGALA-MYSORE 400 KV NELAMANGALA-MYSORE 400 KV MYSORE-KOZHIKODE 400 KV MYSORE-KOZHIKODE 400 KV KAIGA-NARENDRA 400 KV KAIGA-NARENDRA 400 KV NARENDRA-GUTTUR 400 KV NARENDRA-GUTTUR 400 KV GUTTUR-HASSAN-MYSORE 400 KV GUTTUR-HASSAN-MYSORE 400 KV MANGALORE-HASSAN-NELAMANGALA 400 KV MANGALORE-HASSAN-NELAMANGALA

69 TRANSMISSION LINES WISH LIST 400 KV HYD-RTPS-KURNOOL-GTY-BLR 400 KV HYD-RTPS-KURNOOL-GTY-BLR 400 KV NELAMANGALA-MYSORE 400 KV NELAMANGALA-MYSORE 400 KV MYSORE-KOZHIKODE 400 KV MYSORE-KOZHIKODE 400 KV KAIGA-NARENDRA-GUTTUR 400 KV KAIGA-NARENDRA-GUTTUR 400 KV GUTTUR-HASSAN-MYSORE 400 KV GUTTUR-HASSAN-MYSORE 400 KV MANGALORE-HASSAN-NELAMANGALA 400 KV MANGALORE-HASSAN-NELAMANGALA ADDL 220KV TO TK HALLI ADDL 220KV TO TK HALLI

70 ANDHRA PRADESH: QUICK FACTS TOTAL AREA275000 SQ KMS TOTAL AREA275000 SQ KMS PER CAPITA CONSUMPTION510 KWH PER CAPITA CONSUMPTION510 KWH 400 KV TL1287 CKM 400 KV TL1287 CKM 220 KV TL10297 CKM 220 KV TL10297 CKM 110 KV TL12439 CKM 110 KV TL12439 CKM 33 KV TL 32325 CKM 33 KV TL 32325 CKM 11 KV TL173092 CKM 11 KV TL173092 CKM LT LINES 438961 CKM LT LINES 438961 CKM 400/220 KV TR1260 MVA 400/220 KV TR1260 MVA 220/132KV TR13353 MVA 220/132KV TR13353 MVA

71 ANDHRA PRADESH GRID HIGHLIGHTS 2000-012001-022002-03 Installed Capacity(MW) 684678608915 Peak Demand Met(MW) 714370296858 Peak Demand Requirement(MW) 810883917686 % Deficit 12%16%12% Total Energy Consumed(MU) 465334641047421 Energy Requirement(MU) 518655200950407 % Deficit 10%11%6% Average Daily Consumption 127 130

72 INSTALLED CAPACITY OF ANDHRA PRADESH AS ON 01-08-2003 IN MW 8915MW

73 INSTALLED CAPACITY OF ANDHRA PRADESH: IN MWIN PERCENTAGE HYDRO349539% THERMAL394344% GAS2733% WIND20.02% IPP120214% TOTAL8915 AS ON 1 st AUG 03

74 CONSUMER PROFILE IN ANDHRA PRADESH

75 PROBLEMS FACED IN OPERATION EVACUATION PROBLEM FOR NORTH EASTERN COASTAL PARTS EVACUATION PROBLEM FOR NORTH EASTERN COASTAL PARTS EVACUATION PROBLEMS AT VTS EVACUATION PROBLEMS AT VTS HIGH AGRICULTURAL LOADS CAUSE SEASONAL VOLTAGE PROBLEM HIGH AGRICULTURAL LOADS CAUSE SEASONAL VOLTAGE PROBLEM CUDAPPAH AREA FACES LOW VOLTAGE IF RYTPS UNITS NOT AVAILABLE CUDAPPAH AREA FACES LOW VOLTAGE IF RYTPS UNITS NOT AVAILABLE HUGE LOAD RELIEF DURING CHANGE OVER- TRUNK LINE LOADINGS HUGE LOAD RELIEF DURING CHANGE OVER- TRUNK LINE LOADINGS RESERVOIRS WITH INSUFFICIENT STORAGE CAPACITY RESERVOIRS WITH INSUFFICIENT STORAGE CAPACITY SCHEDULING IPP’S DURING LEAN DEMAND SCHEDULING IPP’S DURING LEAN DEMAND GENERATORS NOT ON FREE GOVERNER GENERATORS NOT ON FREE GOVERNER GRIDMAP SHOW ME

76 EVACUATION AT GZK

77 VTS AND LANCO EVACUATION VTSG FROM BHIMADOLU FROM VGTS-II NUNNA 400KV NUNNA GUNADALA KONDAPALLI LANCO=350MW CHILLAKALLU TO MALKARAM VIA NKTPALLI TALAPALLI TALAPALLI 400 KV PODILI TADIKONDA ONGOLE STATION DIAGRAM VTS=1260 MW 180 x 2 160 x 2 130 x 2 10 x 2 140 x 2 90 80 x 2 150 60 80

78 EVACUATION OF KTS TO L.SILERU TO HARD WATER PLANT VIA MANUGURU KTS 1170MW KHAMMAM KHAMMAM 400 KV STATION DIAGRAM NUNNA NUNNA 400 KV S.R.PATNAM N’SAGAR MIRYALGUDA SH’ NAGAR

79 ‘TWIN CITY’ RING MAIN GACHIBOWLI CHANDRAYANGUTTA TO SRISAILAM MAMMIDAPALLI MAMMIDAPALLI- 400KV SHAPOORNAGAR MALKARAM GHANAPUR TO MMDPALLI TANDUR YEDDUMAILARAM MOULALI NKT PALLI CHILLAKALLU

80

81 SIMHADRI(1000 MW)

82 SHOW ME THE MAP SRISAILAM TURBINE TYPE: FRANCIS HEAD : 83 MTS STORAGE FRL 271MTS STORAGE MDDL 243 MTS N’SAGAR TURBINR TYPE:FRANCIS HEAD : 93 MTS STORAGE FRL 180MTS STORAGE MDDL 149 MTS

83

84

85

86 JALAPUT TYPE: STORAGE FRL 838MTS- 534 MU STORAGE MDDL 809 MTS

87 NATURAL ADVANTAGES GATE WAY OF SOUTH GATE WAY OF SOUTH GATE WAY OF SOUTH GATE WAY OF SOUTH MOST CONNECTED STATE MOST CONNECTED STATE HIGHLY NETWORKED HIGHLY NETWORKED BETTER SHORT CIRCUIT LEVEL AND STABILITY BETTER SHORT CIRCUIT LEVEL AND STABILITY ALLOWED TO DRAW MVAR AT RAMAGUNDAM ALLOWED TO DRAW MVAR AT RAMAGUNDAM BEING AT THE MOUTH HAS ADVANTAGE AVAILING MORE ASSISTANCE FROM NEIGHBOURING REGION BEING AT THE MOUTH HAS ADVANTAGE AVAILING MORE ASSISTANCE FROM NEIGHBOURING REGION

88 BACK

89 <2MU 2-4MU 4-6MU >6MU

90 VARIABLE COST OF SOME POWER STATION IN ANDHRA PRADESH POWER STATION/UNIT VARIABLE COST (Ps) NELLORE234 RAYALASEEMA125 KOTHAGUDEM-A123 KOTHAGUDEM-B123 KOTHAGUDEM-C123 KOTHAGUDEM-D123 VIJAYAWADA103 RAMAGUNDAM-B102 SIMHADRI100 KONDAPALLI92 VIJJESWARAM87 VIJJESWARAM86 JEGURUPADU83 SPECTRUM83

91 220KV JEGRUPADU-VEMAGIRI20 220KV VEMAGIRI-BHIMAVARAM D/C 134 220KV BHIMAVARAM-GUDIWADA D/C 144 220KV GUDIWADW-NUNNA D/C92 400KV RAMAGUNDAM (BPL)-DITCHIPALLY(SC) 150 400KV RAMAGUNDAM(BPL)-GAJWEL(SC) 170 400KV KRISHNAPATNAMTPS-KRISHNAPATNAM S/S(2XSC) 20 LILO FROM 400KV GOOTY- TALAPALLY SC LINE TO KURNOOL S/S 40 400KV GAJWEL-HYDERBAD (SC) 60 400 KV KALPAKA-VEMAGIRI-NUNNA DC 2002-03 2003-04 EXPECTED TRANSMISSION ADDITIONS IN CKM

92 TAMIL NADU: QUICK FACTS TOTAL AREA 130058 SQ KMS NUMBER OF CONSUMERS 152 LAKHS CONNECTED LOAD 25539 MW 230 KV TL 6782 CKT KMS 110 KV TL 12241 CKT KMS 66 KV TL 2706 CKT KMS

93 TAMIL NADU GRID HIGHLIGHTS 2000-012001-022002-03 Installed Capacity(MW) 615165886900 Peak Demand Met(MW) 629066867138 Peak Demand Requirement(MW) 683977587495 % Deficit 8%14%5% Total Energy Consumed(MU) 410444318045517 Energy Requirement(MU) 454304804448706 % Deficit 10% 7% Average Daily Consumption 112118125

94 INSTALLED CAPACITY OF TAMIL NADU AS ON 01-08-2003 IN MW 6900MW

95 INSTALLED CAPACITY OF TAMIL NADU: IN MWIN PERCENTAGE HYDRO199329% THERMAL357052% GAS3305% WIND190.3% IPP98814% TOTAL6900 AS ON 1 st AUG 03

96 CONSUMER PROFILE IN TAMIL NADU

97 PROBLEMS HYDRO GENERATION MONSOON DEPENDENT HYDRO M/C s OF SMALL CAPACITY. ITS CONTRIBUTION IS LESS FOR ANY MAJOR LOAD VARIATIONS. PEAKING SHORTAGE CONSTRAINTS FOR AVAILING IMPORTS ANY MAJOR THERMAL UNIT TRIPPING, AGGRAVATES THE SITUATION FOLLOWED BY VOLTAGE PROBLEMS.

98 PROXIMICITY OF GENERATING STATIONS Thermal Hydro Nuclear IPP/GAS KALPAKKAM NORTH MADRAS ENNORE NEYVELI-TS II NEYVELI-TS I METTUR METTUR DAM MOYAR PYKARA KUNDAH COMPLEX TUNNEL TUTICORIN KODAYAR PAPANASAM SERVALAR PERIYAR SURULIYAR KADAMPARAI ALIYAR SHOLAYAR SARKARPATHI BALAJI BASIN BRIDGEGMR VASAVI TCPL P P NALLUR KOVI KALLAPAL SAMALPATTY NEYVELI-TS I (Exp)

99 LOAD CENTRES IN TN CITY LOADS MAIN AGRI AREA

100 TYPICAL LOADS IN MAIN CITIES CITYLOADS IN MW CHENNAI1500 COIMBATORE400 TRICHY300 MADURAI300 SALEM250

101 LIST OF HYDROSTATIONS STATION (NI)UNITSCAP (MW) YEAR OF COMMI SIONING STATION (IRR)UNIT S CAP (MW) YEAR OF COMMI SIONING PYKARA3X7+2X11+ 2X14 701932METTUR DAM4X10401937 MOYAR3X12361952METTUR TUNNEL4X502001966 KUNDAH I3X20601960LOWER METTUR8X151201988 KUNDAH II5X351751961PERIYAR4X351401958 KUNDAH III3X601801965PAPANASAM4X7281944 KUNDAH IV2X501001966SERVALAR1X20201986 KUNDAH V2X20401964SARKAR.PATHI1X30301966 KUNDAH VI2X20401996SHOLAYAR I2X35701971 SURULIYAR1X35351978SHOLAYAR II1X25251971 KADAMPARAI4X1004001987 ALIYAR1X60601970 KODAYAR1X60+1X401001971

102 KADAMPARAI PUMPED STORAGE HEP NO OF UNITS : 2 (INITIALLY) TYPE OF PUMP-TURBINE- REVERSIBLE FRANCIS(VETICAL SHAFT) OUTPUT OF GENERATOR - 100 MW AT 0.9 pf lag INPUT DURING PUMPING - 120 MW AT 0.98 pf lead RATED SPEED – 500 rpm Contd...........

103 KADAMPARAI PUMPED STORAGE HEP UPPER RESERVOIR (KADAMPARAI) FRL - 1149 m MDDL - 1102 m STORAGE –29.4 mcm (live) GEN. – 3.7mcft/hr/m/c LOWER RESERVOIR (UPPER ALIYAR) FRL – 769.62 m MDDL – 745.25 m STORAGE –21.6 mcm (live) PUMPING - 2.7 mcft/hr/m/c

104 WIND ENERGY TOTAL INSTALLED CAPACITY IN THE COUNTRY- 1200 MW IN TAMIL NADU-800MW REQUIREMENT – MINIMUM WIND VELOCITY-24 kms/hr DESIRABLE WIND VELOCITY-48 kms/hr LIMITATIONS - SEASONAL, DEPEND ON WIND VELOCITY - COSTLY - MVAR DEPENDENCY ON GRID

105 CHENNAI SUPPLY POWER AVAILABLE IN AND AROUND CHENNAI AT PEAK ETPS – 450 MW NMTPS – 630 MW B.B - 120 MW GMR VASAVI- 186 MW TCPL - 62.5 MW TOTAL - 1448.5 MW AVAILABLE GENERATION (APPROXI) - 1250 MW TOTAL LOADS IN CHENNAI (APPROXI) – 1500 MW BALANCE MET THROUGH IMPORTS

106 TOTAL INFLOWS IN MU FOR TN

107 VARIABLE COST OF SOME POWER STATION IN TAMIL NADU POWER STATION/UNIT VARIABLE COST (Ps) BASIN BRIDGE489 P P NALLUR282 SAMALPATTY225 BALAJI POWER214 VASAVI GAS (IPP)212 ENNORE.T.P.S203 KOVIL KALAPPAL200 NEYVELI-I169 TUTUCORIN.T.P.S144 METTUR.T.P.S142 NORTH MADRAS.T.P.S142

108 EXPECTED GENERATION ADDITIONS STATIONCAPACITY (MW)EXPECTED YEAR HYDRO PYKAKARA ULTIMATE 3X50SEP-03 GAS PEUUMKULAM 1X1002003 NCTPS 2X52510 th PLAN TTPS 4th STAGE 1X52511 th PLAN SRIMUSHANAM 35010 th PLAN

109 TRANSMISSION LINES EXPECTED 400 KV NCTPS TS II-SPDR - 2003 LILO OF NELLUR-SPDR AT ALMATHY - 2003 230 KV LILO OF METTUR-HOSUR AT KARIMANGALAM - 2003 LILO OF ETS-KORATTUR AT MANALI - 2003 THENI-SEMPATTY - 2003 THIRUVANAMALAI-VILLUPURAM -2003

110 KERALA: QUICK FACTS TOTAL AREA 38,863 SQ KMS NUMBER OF CONSUMERS 61 LAKHS CONNECTED LOAD 8150 MW 230 KV TL 1999 CKT KMS 110 KV TL 2969 CKT KMS 66 KV TL 2707 CKT KMS

111 KERALA GRID HIGHLIGHTS 2000-012001-022002-03 Installed Capacity(MW) 25252553 Peak Demand Met(MW) 234023482347 Peak Demand Requirement(MW) 253925712637 % Deficit 8%9%12% Total Energy Consumed(MU) 125001264012450 Energy Requirement(MU) 140941416513634 % Deficit 11% 9% Average Daily Consumption 343534

112 INSTALLED CAPACITY OF KERALA AS ON 01-08-2003 IN MW 2553MW

113 INSTALLED CAPACITY OF KERALA: IN MWIN PERCENTAGE HYDRO179570% THERMAL2359% GAS35014% WIND20.08% IPP1717% TOTAL2553 AS ON 1 st AUG 03

114 CONSUMER PROFILE IN KERALA

115 PROBLEMS HYDRO GENERATION MONSOON DEPENDENT PEAKING SHORTAGE CONSTRAINTS FOR AVAILING IMPORTS LOW VOLTAGE PROBLEM IN NORTHERN KERALA

116 GENERATING SCHEME

117

118

119

120

121

122 VARIABLE COST OF SOME POWER STATION OF KERALA POWER STATION/UNIT VARIABLE COST (Ps) KAYAMKULAM220 BRAHMAPURAM DIESEL225

123 Sl NoName of stations Capacity in MW Targetted Year 1Kuttiyadi Additional Ext.100Aug-05 2Athirappally1632007 3Malankara10.5Jul-02 4Meen Vallom2.4Apr-03 5Kuttiadi Tail Race3.75Apr-03 6Chembukadavu Stage12.7Jun-02 7Chembukadavu Stage23.75Dec-02 8URUMI Stage13.75Dec-02 9URUMI Stage22.4Dec-02 10Bothathan kettu(P)16Apr-06 11Ullangal(P)7Jun-06 12Karikkayam(p)15Mar-06 Thermal 13DCP Kasarkode105Dec-03 GENERATING SCHEMES UNDER CONSTRUCTION

124 POWERGRID IN SOUTHERN REGION EXISTING TRANSMISSION FACILITY I)Transmission System 400 / 220 kV Transmission Line – 6,700 Circuit Kms. 400 / 220 kV Transmission Line – 6,700 Circuit Kms. 400 kV S/S – 15 Nos. with 7350 MVA transformation capacity 400 kV S/S – 15 Nos. with 7350 MVA transformation capacity II) Load Despatch & Communication System Unified Load Despatch & Communication System in SR Unified Load Despatch & Communication System in SR III) HVDC B/B Station 1000 MW Chandrapur (WR – SR Interconnection) 1000 MW Chandrapur (WR – SR Interconnection) 500 MW Gazuwaka (ER – SR Interconnection) 500 MW Gazuwaka (ER – SR Interconnection) IV) Talcher-II – Kolar 2000 MW HVDC Bipole Link alongwith AC Line (Major Part commissioned) Longest HVDC Pole (about 1400 kms.) from Talcher to Kolar Longest HVDC Pole (about 1400 kms.) from Talcher to Kolar Completed cost – Rs. 700 crores less than the approved cost of Rs. 3100 crores Completed cost – Rs. 700 crores less than the approved cost of Rs. 3100 crores Commissioned 9 months ahead of schedule in September 2002. Commissioned 9 months ahead of schedule in September 2002. Second pole test charged on 17.12.2002 Second pole test charged on 17.12.2002 Besides Talcher-II power it would facilitate transfer of surplus power of Eastern Region to Southern Region Besides Talcher-II power it would facilitate transfer of surplus power of Eastern Region to Southern Region

125 POST INDEPENDENT INDIA ELECTRICITY AN INDEX FOR DEVELOPMENT OF THE NATIONAL ECONOMY. INVOLVEMENT OF STATE GOVERNMENTS FOR DEVELOPMENT OF THE POWER SECTOR. CENTRALISED CONTROL FOR COORDINATION AND IMPLEMENTATION BY STATE OR REGIONAL BODIES

126 EVOLUTION OF POWER SYSTEM IN INDIA PRE INDEPENDENCE - SMALL ISOLATED SYSTEM PRIOR TO 60s - GENERATION/TRANSMISION BY SEBS DURING 60s - LIMITED INTERCONNECTION BETWEEN NEIGHBOURING STATES 70s - EMERGENCE OF CENTRAL SECTOR GENERATION ( NTPC/NHPC/NUCLEAR ETC.) PLANNING OF GENERATION/TRANSMISSION ON REGIONAL BASIS LATE 80s – INTEGRATED GRID OPERATION THRO’ 400kV SYSTEM LATE 90s - ASYNCHRONOUS INTER REGIONAL LINKS LONG DISTANCE HVDC LINKS / B2B STATIONS

127 Power sector is governed by three principal Acts namely – i) The Indian Electricity Act, 1910 The Indian Electricity Act, 1910 deals with functioning and regulation of the private licensees ii) The Electricity (Supply) Act, 1948 The Electricity (Supply) Act, 1948 deals with establishment and functioning of SEBs iii) The Electricity Regulatory Commissions Act, 1998. The Electricity Regulatory Commissions Act, 1998 establishment of SERCs & CERC

128 INDIAN ELECTRICITY ACT 1910 (ACT 9 OF 1910) INTRODUCE THE CONCEPT OF LICENCES IMPOSE CERTAIN DUTIES AND LIABILITIES ON SUCH LICENSEES. INTRODUCE CERTAIN PENAL PROVISIONS

129 IMPORTANT PROVISIONS OF ELECTRICITY (SUPPLY) ACT 1948 FORMATION OF CEA FORMATION OF SEBs GREATER RESTRICTION AND CONTROL ON THE LICENSEES’ OPERATION LAYING DOWN PRINCIPLES OF TARIFF SPELLING OUT FINANCIAL PRINCIPLES AND THEIR APPLICATION BOTH FOR THE SEBs AND LICENSEE

130 AMENDMENT OF 1998 DEFINES CENTRAL TRANMISSION UITILITY INTER-STATE TRANSMISSION OF POWER STATE TRANSMISSION UTILITY TRANSMISSION LICENSEES.

131 ELECTRICITY ACT AMENDMENTS IN 1998 SALIENT FEATURES TRANSMISSION RECOGNISED AS SEPARATE ACTIVITY AND CONCEPT OF TRANSMISSION LICENSEE REDUCED TRANSMISSION RECOGNISED AS SEPARATE ACTIVITY AND CONCEPT OF TRANSMISSION LICENSEE REDUCED CONCEPT OF A CENTRAL TRANSMISSION UTILITY (CTU) AND STATE TRANSMISSION UTILITIES (STUs) CONCEPT OF A CENTRAL TRANSMISSION UTILITY (CTU) AND STATE TRANSMISSION UTILITIES (STUs) RLDCs TO BE OPERATED BY POWERGRID UNLESS OTHERWISE SPECIFIED BY THE GOVERNMENT RLDCs TO BE OPERATED BY POWERGRID UNLESS OTHERWISE SPECIFIED BY THE GOVERNMENT RLDCs DESIGNATED AS APEX BODIES TO ENSURE INTEGRATED OPERATION OF POWER SYSTEM IN EACH REGION RLDCs DESIGNATED AS APEX BODIES TO ENSURE INTEGRATED OPERATION OF POWER SYSTEM IN EACH REGION RLDCs TO ENFORCE ABOVE DECISIONS OF REBs RLDCs TO ENFORCE ABOVE DECISIONS OF REBs

132 ELECTRICITY REGULATORY COMMISSION ACT 1998 THIS ACT PROVIDES ESTABLISHMENT OF CENTRAL ELECTRICITY REGULATORY COMMISSION ESTABLISHMENT OF STATE ELECTRICITY REGULATORY COMMISSION, RATIONALIZATION OF ELECTRICITY TARIFF,

133 Regional Load Despatch Centres (RLDCs)  NEED FOR A CONTROL CENTRE (RLDC) IN EACH REGION FELT IN LATE SEVENTIES  RLDCs UNDER CEA / REB.

134 The installed capacity 1362 MW in 1947 1,08,000 MW AT PRESENT

135 Indian Power Scenario Current capacity - 115 GW 50 times increase in last 50 years since Independence

136 Table 1: Growth of Indian Power Sector ParameterPresent Status Growth since independence (times) Installed Capacity (MW) 1,08,00055 No. of Consumers (Million) 8052 Agricultural Connections (Million) 13580 T & D Network ('000 ckt. Km.) 600175 Electrified Villages ('000) 500165 Per Capita Consumption (kWh) 35022 Note: Above numbers are indicative

137 Forms of Power

138 Growth Plans Annual growth in last 4 years - 3000 MW Optimistic scenario - 5000 to 6000 MW per year in the next 4 to 5 years. Pessimistic Scenario - 3000 MW p.a. 1/3 to ¼ of from IPPs. Rest from SEBs / NTPC / NHPC etc

139 IEGC PARAMETERS FREQUENCY 49.0 Hz - 50.5 Hz Voltage 400kV 360kV - 420kV 220kV 200kV - 245kV 132kV 120kV - 145kV

140 ABT REVOLUSIONISE GRID OPERATIONS INDUCES GRID DISCIPLINE ENCOURAGES MERIT ORDER IMPROVES SYSTEM PARAMETERS & GRID SECURITY TRADING OPTIMAL UTILISATION OF RESOURCES

141 ABT WR 01-07-02 NR 01-12-02 SR 01-01-03 ER 01-04-03

142 ABT IMPLEMENTATION IN SR SINCE 01-01-2003 EXPERIENCE – REG. 1.FREQUENCY PROFILE IEGC ALLOWABLE RANGE (49-50.5 HZ) – 100% (49.5-50.0 HZ) – 68 % 2. SELF CORRECTION BY ALL CONSTITUENTS TO ADHERE TO SCHEDULE DURING LOW FREQUENCY AVOIDING OVER DRAWAL – NO MESSAGE FROM SRLDC. 3.FVI : BETWEEN 0.45 TO 3.14 ( 0.45 ALL INDIA RECORD ) 4.QUICK RESPONSE FROM CONSTITUENTS IN CORRECTING FREQUENCY IN THE EVENT OF CONTINGENCY. 5.INCREASED BILATERAL EXCHANGES. - PONDICHERRY AVAILING POWER FROM NEYVELI. - BILATERAL CONTRACT BETWEEN KSEB & TNEB IN PIPE LINE. 6.ALL ISGS IN SR GETTING FULL REQUISITION/DESPATCH SCHEDULE. IN CASE OF LESS REQUISITION BY ANY CONSTITUENT (FOR SOME TIME BLOCK), OTHER CONSTITUENT(TN) AVAILING SAME ON BILATERAL BASIS. 7.SR CONSTITUENTS EARNED 45LAKHS ON ACCOUNT OF EXPORT FROM SR TO WR UNDER UI MECHANISM DRING 1ST JAN TO 5TH JAN 03.

143 8.300MW POWER BEING WHEELED FROM ER TO WR THROUGH SR. 9.BEST UTILISATION OF PUMPED STORAGE SCHEME (TNEB). 10.HYDRO BEING UTILISED IN MOST OPTIMAL FASHION (20MU LESS GENERATION AS COMPARED TO LAST YEAR). 11.CONSTITUENTS FOLLOWING MERIT ORDER WHILE DEPATCHING THEIR INTERNAL GENERATION/IPPs. 12.VOLTAGE PROFILE MOSTLY REMAINING BETWEEN 97 – 103%. 13.CONSTITUENTS EXPRESSED THEIR WILLINGNESS TO PUT GENERATORS ON FREE GOVERNOR MODE. 14.IMPLEMENTED SCHEDULES FOR COMPLETED DAY ARE BEING UPLINKED AT THE SRLDC WEB SITE (WWW.SRLDC.ORG). ABT IMPLEMENTATION IN SR SINCE 01-01-2003 EXPERIENCE – REG.

144 Thank you

145 KERALA TOTAL AREA 38,863 SQ KMS NUMBER OF CONSUMERS 61 LAKHS CONNECTED LOAD 8150 MW 230 KV TL 1999 CKT KMS 110 KV TL 2969 CKT KMS 66 KV TL 2707 CKT KMS KARNATAKA TOTAL AREA 130058 SQ KMS NUMBER OF CONSUMERS 152 LAKHS CONNECTED LOAD 25539 MW 230 KV TL 6782 CKT KMS 110 KV TL 12241 CKT KMS 66 KV TL 2706 CKT KMS TAMILNADU TOTAL AREA 130058 SQ KMS NUMBER OF CONSUMERS 152LAKHS CONNECTED LOAD 25539 MW 230 KV TL 6782 CKT KMS 110 KV TL 12241 CKT KMS 66 KV TL 2706 CKT KMS ANDHRA PRADESH TOTAL AREA 275000 SQ KMS PER CAPITA CONSUMPTION 510 KWH 400 KV TL 1287 CKM 220 KV TL10297 CKM 110 KV TL12439 CKM 33 KV TL 32325 CKM 11 KV TL173092 CKM LT LINES 438961 CKM 400/220 KV TR1260 MVA 220/132KV TR13353 MVA QUICK FACTS

146


Download ppt "POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE."

Similar presentations


Ads by Google