Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.

Slides:



Advertisements
Similar presentations
Progress and Plan for Superconducting RF Cavity RF Group.
Advertisements

Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Heat load study of cryomodule in STF
ESS cavities interfaces
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.
Rossana Bonomi ESS Cryomodule Status Meeting, 9/1/2013.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Hamburg European Linear Collider Workshop ECFA LC2013 Krzysztof Krzysik XFEL AMTF Cavity and Module RF Measurement Procedures.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
Rossana Bonomi R. Bonomi TE-MSC-CMI SPL Seminar 2012.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Accelerator/Elliptical Cavities Cryomodules Pierre BOSLAND, CEA Saclay External WP5 leader Christine Darve, ESS deputy WP leader
Integration and Cold Testing of the CW ERL Cryomodule at Daresbury Shrikant Pattalwar ASTeC, STFC, Daresbury Laboratory (UK) On behalf of ERL Cryomodule.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain la Neuve 17-18/04/2013 Design Status of the Spoke Cryomodule for MYRRHA SLHIPP Louvain.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
Areal RF Station A. Vardanyan
Cryomdoule Test Stand.
S1G Experiment Schedule Plan
CERN – Zanon discussions
Cryomodule test stand at ESS site
Test of the dressed spoke cavity
WP5 Elliptical cavities
at STFC Daresbury laboratory
T5.2: Harmonization - Material and Component Reference
Power Couplers, HOM Couplers and Tuners for the XFEL
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
Wolfgang Anders, BESSY, Berlin
Review of the European XFEL Linac System
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
Test plan of ESS HB elliptical cavity
Cryomodules Challenges for PERLE
CEPC-650MHz Cavity Cryomodule
Cryomodule Test Schedule
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010

Objective of test  Validation of RF power test setup with 1 MW klystron/modulator on sc cavity in pulsed mode  Validation of cavity performance inside cryo-module and of assembling procedure: conditioning with 1 klystron of pair of cavities up to 25 MV/m  main coupler conditioning  calorimetric Q-measurement  X-ray generation of cryo-module  long run max field  crosstalk between cavities by RF or dark currents,...  Validation of LLRF system  Validation of cryo-module design  static losses  critical heat flow in super-fluid helium  microphonics,... WW SPL cryo-module meeting 19 October

Test object 1  The cryomodule is equipped with  4 =1 5-cell Nb bulk cavities at 704 MHz joined with lHe tank  4 power couplers (2 per klystron) with ancillaries (gHe feeder lines with heater) and interlock equipment (e- current, temperature, vacuum gauge)  4 pickup antennas (50 )  4 tuners (slow and piezo)  1 thermal shield with (possibly) magnetic shield (Cryoperm) thermally anchored to it (need of 2 nd magnetic shield to be discussed)  2 gate valves at extremities (plus protection flanges)  slow control & interlock system  … WW SPL cryo-module meeting 19 October

Test object 2  … the cryomodule is equipped with  He pressure gauge  lHe level sensors (redundancy)  temperature-sensors at strategic points (bellows, magnetic shield, HOM couplers, power coupler  8 HOM couplers with (broadband) feedthrus and RF cables to room temperature loads (rated 100 W) sufficiently thermally anchored  pressure gauges for cavity vacuum and insulation vacuum  4 heaters inside He tank (among others used for measurement of Q-value)  RF-DC filters for e - -current measurement (outside cryo- module) at HOM and pick-up cables  Radiation monitor available inside bunker  All sensor signals remotely logged WW SPL cryo-module meeting 19 October

Test object 3 RF power tests with 1/2/4 cavities per 1 MW klystron WWSPL cryo-module meeting 19 October 20105

Cryogenic design parameters Parameter Unit low-beta high-beta nominal/ultimate Cavity bath temperature [K] Beam loss [W/m] Static loss along cryo-modules at 2 K[W/m] ? ? Static loss at K [W/m] ? ? Accelerating gradient/voltage[MV/m]/[MV] 19.3/ /26.5 Quality factor Q[10 9 ]6/3 10/5 R/Q value [  ] Cryogenic duty cycle [%] 4.09/ /8.22 Coupler loss at 2.0 K [W] <0.2/0.2 <0.2/0.2 HOM loss at 2.0 K in cavity [W] <1/<3 <1/<3 HOM coupler loss at 2.0 K (per coupler) [W] <0.2 /0.2 <0.2/0.2 HOM & Coupler loss K [g/s] Tunnel slope [%] Cavities per cryostat 3 4/8 Dynamic heat load p. Cavity [W] 4.2/ /20.4 Intercavity bellows hom loss (ss/copper) for GHz[W]?<3/<0.1 WWSPL cryo-module meeting 19 October Updated values in red Cf. also

Test sequence 1  At room temperature  The cryo-module is installed and connected to the cryo-line but not yet to the RF power waveguide system proper (2 cavities per klystron) but instead to a waveguide-coax 50  line  Check vital components such as tuners (range), temperature sensors, low level RF system  Measurement of fundamental mode (704 MHz) resonant frequencies of cavities and Q ext for 704 MHz of power couplers, pickup probes and HOM couplers  Calibrate directional couplers on waveguides for forward and reflected wave  Interlock tests  If vacuum OK (p < mbar) start cool down  Sequence of cool down: thermal/magnetic shield – cavity end group (beam tubes) – cavity proper WW SPL cryo-module meeting 19 October

Test sequence 2  During cool down  Logging of temperature sensors/lHe level/vacuum WW SPL cryo-module meeting 19 October

Test sequence 3  At 4.5 K  Measurement of fundamental mode resonant frequencies of cavities and Q ext of power couplers, pickup probes and HOM couplers (optional)  Measure transfer-function of fundamental and prominent HOMs between adjacent cavities  Connection with RF power waveguide system and adjustments of Q ext of power coupler to nominal, if needed  Switch on moderate RF power and check for RF leaks in waveguide system  Activate LLRF system for tuning cavities on master frequency  Have all interlocks and all diagnostics equipment active and actuators on REMOTE, close door of bunker WW SPL cryo-module meeting 19 October

Test sequence 4  At 1.8 K  Increase RF power slowly to nominal value under pulsed conditions and careful observation of  Power coupler diagnostics signals (to be specified)  Cavity signals (forward, reflected, transmitted power, vacuum)  HOM power at 704 MHz  X-radiation  e - -current  Check for helium pressure oscillations without RF as well as “microphonics”  Measure static heat load of cryo-module  Increase acc. gradient to nominal; when at nominal gradient,  measure Lorentz-force detuning in pulsed mode  measure dynamic cavity heat dissipation by adjusting the He gas pressure with the heater power inside the He tank  measure critical heat removal threshold in super-fluid helium WW SPL cryo-module meeting 19 October

Wish-list for accessibility for in-situ intervention  Inside cryo-module  Tuner  Motor and mechanical parts  HOM coupler  re-tuning of notch-filter or in situ tuning from outside, if possible  RF vacuum transitions  all type N (or similar)  Outside cryo-module  3-stub tuner  for RF coupler re-adjustment  gHe pipes  mass flow in power coupler heat exchanger WW SPL cryo-module meeting 19 October

Thank you for your attention WWSPL cryo-module meeting 19 October