Towards a model for European Seas Observatory Network Implementation Michael Gillooly, Glenn Nolan and ESONIM team A Specific Support Action funded under.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

Strengthening the Strategic Cooperation between the EU and Western Balkan Region in the field of ICT Research Input to panel discussion: Concrete actions.
Research Infrastructures WP 2012 Call 10 e-Infrastructures part Topics: Construction of new infrastructures (or major upgrades) – implementation.
Side 1 Mat.-nat. Fak. søndag, 20. juli 2014 Norwegian participation in EMSO - European Multidisciplinary Seafloor Observation UoT J. Mienert Det matematisk–
Oficina AproTECH de AETIC: Información y asesoramiento en la preparación de propuestas de I+D+I The structure of the FP7: Funding schemes,
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
CIRAS PROJECT OVERVIEW
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
The LIFE Integrated Projects
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on activities and partnership JTS CENTRAL EUROPE PROGRAMME.
Provisional FP7-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 2. The Funding schemes.
Networks GDITS Grandi Destinazioni Italiane per il turismo sostenibile Workshop on ETIS Milan, February 13, 2015 Cinzia De Marzo European Commission,
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
Integrated European Census Microdata 5 th DwB Training, Barcelona, January 2015.
Ingenious-science.eu ECB National Needs Analysis Workshop – Israel Charmaine Kerr ECB Project Coordination.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
A new start for the Lisbon Strategy Knowledge and innovation for growth.
EPOCA – 11. June EPOCAConsortiumOrganisation.
MESH UK Workshop 19 October 2006 Introduction Dr Paul Gilliland Marine Policy Adviser and MESH Partner Lead Natural England.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
1 NEST New and emerging science and technology EUROPEAN COMMISSION - 6th Framework programme : Anticipating Scientific and Technological Needs.
EMSO – PP European Multidisciplinary Seafloor Observation Preparatory Phase PROJECT OVERVIEW.
CONTEXT No cohesiveness between different observatory models No means of identifying which model is best within a certain context and function No means.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
Legal Aspects Related to Brownfield Regenerations Prof. Maros Finka, M.arch., Ph.D. „This project has been funded with support from the European Commission.
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Malta Council for Science and Technology Brief Introduction to FP7 14 th September 2007 Anthea Frendo National Contact Point for FP7.
Dr Ilse Vickers, Adviser on European Research Strategy London Higher, 10 October 2008 EU Funding Winning FP7 Contracts EU Funding Winning FP7 Contracts.
FP7: Framework Program 7th
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
PROPOSAL for the establishment of the ENGINE (European Network for Green Infrastructure KNowledge and Experience) Eleftherios Loizou Managing Director.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
O Transnational strategy for „Airport City‟ development Giuseppe Luppino - ITL.
Future Perspectives of Ocean Observatories in Germany [Name of the infrastructure / site / time series…] Contact person: [name, ] [Institution(s)
The Seventh Framework Programme for Research and Technological Development (FP7) supporting innovation Epp Tohver-Bulavs 07. November 2007, Tallinn.
ETCF is funded by the European Union Project is implemented by Eurochambres & TOBB TOBB Overview of the ETFC project EU-Turkey Chamber Forum Partnership.
Malta Council for Science and Technology Brief Introduction to FP7 4 th September 2007 Anthea Frendo National Contact Point for FP7.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems EU environmental research : Part B Policy objectives  Lisbon strategy.
EU funding programmes – In support of a knowledge based society Stefan Thuis TU Dortmund
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
1 Priority 3 NMP: generalities Renzo TOMELLINI Head of Unit “Nanosciences and Nanotechnologies” Directorate “Industrial Technologies” Research Directorate-general.
Rafael Rodríguez Clemente. Coordinator* *Estación Biológica de Doñana, CSIC. Sevilla (Spain) MoCo Meeting, Casablanca (Morocco)
Future outlook and next steps for ESPON The ESPON 2013 Programme OPEN DAYS Bruxelles, 10 October 2007.
MarNIS Maritime Navigation and Information Services FP6 - Integrated Project.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
WP C-4a Sub work package on Periphery Issues. Background Objectives Work process Results Taking the results forward Document Date Page.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Work Plan for the Second Period Bob Jones, CERN First Helix Nebula Review 03 July This document produced by Members of the Helix Nebula consortium.
Financing LNG Investments in Energy and Transport
Legal Aspects Related to Brownfield Regeneration
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
2.6.5 – International Co-operation
Priority 3 NMP: generalities
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
2nd Marine Board Forum: towards a European Network of Marine Observatories for monitoring and research Session 2: Projects and Initiatives Alan Edwards.
LIFE and the implementation of the Water Framework Directive
EMFF implementation by EASME
LIFE and the implementation of the Water Framework Directive
The – new – LIFE program (Integrated Projects)
The EU Strategy for Adaptation to climate change
Presentation transcript:

Towards a model for European Seas Observatory Network Implementation Michael Gillooly, Glenn Nolan and ESONIM team A Specific Support Action funded under EC FP6 ESONET NoE All Regions Workshop Barcelona, Sept. 5-7 th 2007

ESONIM ESONIM is a Specific Support Action (SSA) funded by FP6 that builds on the EU FP5 Project ESONET (The European Seafloor Observatory Network) The main aim is to facilitate the establishment of a European Seafloor Observatory Network (ESONET) by providing EU Member States with generic technical, legal and financial models and cases to establish one or more pilot cabled seafloor observatories.

ParticipantContactCountry Marine Institute – Lead M.Gillooly/G.Nolan CSA Group Ltd N.O’Neill IFM-GEOMAR O. Pfannkuche IFREMER J.F. Rolin Alcatel (ASN) N.Hazell University of Aberdeen I.G. Priede Goodbody Ltd C. O’Rourke Philip Lee Solicitors P. Lee University of Göteborg P. Hall ESONIM Project Partners (Authors)

WP1: Project Management Define the ESONIM project’s management structure and reporting procedures. WP2: Scientific Justification To provide the over-arching specification of user needs and justification for the establishment of a European seafloor observatory network WP3: Engineering Design To identify the most appropriate technical design and engineering solutions for a cabled ocean observatory. The opportunities for industry involvement in the design, manufacture, deployment and operation of the system will be addressed in this work package. WP4: Financial Model To produce a 10 year cash-flow forecast for a cabled seafloor observatory with the European Seafloor Observatory Network (ESONET). WP5: Legal Framework To provide the overall legal context and framework for the implementation of a cabled seafloor observatory. WP6: Implementation Model To analyse and integrate the results of Work Packages 2-5 to develop a technical and financial project appraisal for a test case seafloor observatory that meets the criteria established by lending institutions. WP7: Dissemination & Promotion To disseminate the information and knowledge gained within ESONIM to the widest possible audience using multiple communications methods. European Seafloor Observatory Network Implementation Model (ESONIM) IMAGE SOURCE: GEBCO NORTH EAST QUADRANT 7 Hovland Md BENGAL Belgica Md Canyon BIOTRANS

Science Users by category (questionnaire):

CeltNet Route (indicative) Cable route designed using Irish Seabed Survey Data Scientists defined sites Route engineers joined the dots!

Engineering design: (CeltNet example case) CeltNet Cable lengths (Courtesy ASN)

Indicative Budget: (CeltNet example case)

ESONIM Business Model MS Excel based software tool Allows user to input realistic capital and operating costs for their observatory site Allows user to profile schedule of node deployment Different grant aid scenarios Cost of Servicing debt (built-in function) Compare required and potential revenue over lifetime of the observatory Generates balance sheet Examine viability of the observatory over its lifetime Assists with lobbying for Observatory funds

ESONIM Model Screen Grab

Infrastructure Capital costs (indicative) Indicative cost ~ €60M

Node Deployment Costs Indicative Cost €25M

Cost of finance (debt)

Operating and Maintenance costs

Scenario 1: 70% Grant Aid, 30% debt, Scientists fund instruments from project budgets

Scenario 2: 100% Grant Aid, No debt, CeltNet funds 30% of instrument costs

Legal WP addresses issues including: Structures Procurement Risk Environmental and planning Permits Contracts Warranty IP Etc.. …and has generated legal template documents

National marine agencies and other partners D+C ContractorOperator Porcupine SPV ESONIM Foundation Marine Institute Heads of Agreement Shareholders Agreement (project–specific) Appointment of Agent Legal WP: Partnership Structure

Linkage to EU Initiatives: (Individual Implem. Plans) ESONIM model –Science/ stakeholders –Engineering design –Financial model –Legal/contracts  ESONET NoE  Implementation Plans – Mediterranean – Atlantic (CeltNet) – Stand-alone (acoustically linked site)  EMSO  European Marine Seas Observatory Core Body 11 ESONET Sites Available September

Final Thoughts ESONET Science and Societal Case Proven Engineering Solutions available Significant Europe wide co-operation Time for incremental step – development of robust business case and push for national and Commission funding to roll out infrastructure

Thank You Thank you Partners European Commission - particularly Alan Edwards and Witold Cieslikiewicz Many others who have advised and helped with particular thanks to Chris Barnes, Peter Phibbs and the Neptune Team