GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
Advertisements

GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectMonthly Status Meeting, June 30, Cost/Schedule Reports for 4.1 LAT Presentation Presentation May 2005 Month End Gamma-ray Large.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
GLAST Large Area Telescope:
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
GLAST Calorimeter Monthly Cost / Schedule / Mission April 2004 Naval Research Lab Washington DC wnjohnson 1 Monthly Cost/Schedule/Mission Review GLAST.
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
LAT MPSRLAT Structural Analysis-1 GLAST LAT ProjectNov-04 Structural Analysis: Completed Tasks LAT System Level –LAT Environmental TIM Support A success.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectMonthly Status Review – June 30, A P&SA – Accomplishments June 2005 DAQ/Electronics – -Transition of QE personnel to support electronics hardware testing has been effective to support inspection, data review, documentation review/management and NCR documentation of TEM/TPS and PDU testing -Continued to support TEM, TPS, PDU board and module testing -TEM/TPS environmental testing running smoothly -No significant issues with T/V chamber operation or vibration testing of two TEM/TPS modules simultaneously -Supporting resolution of assembly problems with PDU and GASU at Aeroflex -6 nonconformances have been written by Aeroflex on the PDU and GASU to date to document PWB assembly issues and minor mechanical hardware modifications -All have been closed and assembly is proceeding -Closed 17 NCRs related to Electronics – making progress

GLAST LAT ProjectMonthly Status Review – June 30, A P&SA – Accomplishments June 2005 Integration and Test -Continued support of 4- and 6-tower testing -Supporting resolution of open NCRs related to testing -Closed 8 NCRs related to I&T

GLAST LAT ProjectMonthly Status Review – June 30, A P&SA – Accomplishments June 2005 Cables -Conducted on-site final inspections and assembly process auditing at cable vendor (Cicon) -Auditing has improved workmanship and reduced rejection rate; on-site final inspection has decreased turnaround time to rework rejected cables. -Approximately 110 cables left for Cicon to build, should complete in July.

GLAST LAT ProjectMonthly Status Review – June 30, A P&SA – Accomplishments June 2005 TMCM -Supporting final TMCM production, inspection/shipment of parts to Teledyne and finished TMCMs to INFN -Teledyne is performing board conformal coating in house and will not use outside vendor for coating any flight TMCMs -TMCM production expected to finish at Teledyne in July -LAT QA is performing final review to ensure acceptance data packages for production run is complete and all NCRs are closed

GLAST LAT ProjectMonthly Status Review – June 30, A P&SA – Accomplishments June 2005 Software QA -Completed review of baseline FSW Candidate Release and closed out findings with software group -Reviewed FSW test procedures and provided comments -Supported recent I&T releases for LATTE and ELogbook -Currently tracking Test scrip V&V (pre-FQT), build process dry runs, test procedure development status

GLAST LAT ProjectMonthly Status Review – June 30, 2005 Issues and Concerns Pioneer Flex Cables -Pioneer reported problems in meeting the 0.002” minimum annular ring requirement for first panels built -This has caused a delay in delivery of first bare boards to mid-July. Concern is that this will be a continuing problem affecting Pioneer’s yield and delivery schedule -Three test samples of Omnetics connectors bonded to flex cables using Pioneer’s autoclave process have been received at SLAC. Visual inspection shows very good epoxy bonding and no connector cracking; bond shear strength will be tested at GSFC to qualify the connector bonding process. -Bond shear strength expected to be acceptable, but if not, a second process will have to be quickly developed and qualified. -LAT QA and TKR team will coordinate with Pioneer and GSFC to determine when panel test coupons will be ready for evaluation and their priority in GSFC’s test lab. First coupons should be available second week of July. Parlex test coupons will need priority evaluation also.

GLAST LAT ProjectMonthly Status Review – June 30, 2005 Issues and Concerns Parlex Flex Cables -Held two MRBs with GSFC to discuss cracks observed in Omnetics connectors on Parlex flex cables. -SLAC analysis of voltage breakdown and Omnetics’ testing of current leakage of cracked connectors indicate presence of cracks would not create significant changes to electrical performance of connectors -GSFC currently underway with their proposed test plan to evaluate effects of thermal cycling and mate/demate on connector crack propagation. -Even though Parlex modified their process to greatly reduce compressive load on connectors during cable assembly, cracks were still observed in connectors on one cable. Root cause of cracking is still not completely known. -Follow up MRB to finalize acceptance criteria of cracked connectors is planned once GSFC test results are complete

GLAST LAT ProjectMonthly Status Review – June 30, 2005 Issues and Concerns Cable retesting following rework -Recent MRB with GSFC reviewed three PDU cables reworked in-house that did not repeat full electrical acceptance testing per NASA cable assy standard prior to shipment to Aeroflex -Cables were only tested for continuity after rework and sent to Aeroflex for PDU assembly. -Cables were returned to SLAC from Aeroflex, then sent to vendor and passed full electrical acceptance testing. Cables meet NASA requirements and have been returned to Aeroflex for PDU assembly -All cables reworked at vendor are fully retested, so this issue was isolated to cables reworked in-house..

GLAST LAT ProjectMonthly Status Review – June 30, 2005 Issues and Concerns Shielded cables -MRB with GSFC reviewed LAT cables with metallic braid shielding that do not include a kapton tape wrap around the wires to provide additional layer of protection between wires and external braid -LAT cables have been built and tested to existing NASA requirements -Practice is recommended by NASA-STD-8739 but not required -Risk is cold flow of teflon wire insulation under stress, resulting in separation of the insulation and possible shorting of exposed wire to the metallic braid. Cold flow will occur under these conditions within a day or two, so any resulting cable problems would be readily observed during I&T. -Evaluation of cable tray layout shows no expected bending over sharp edges or tight radii (less than 3X O.D. per NASA-STD-8739). Tie wrap installation and compression will be controlled with industry proven, calibrated installation tool. -I&T has been sensitized to the cold flow concerns and new practices and process are in place for cable handling and care -Discussions with cable vendor showed significant cost and schedule impact to rework/rebuild braided cables to add layer of insulation -Recommendation is to proceed with current cable design; awaiting final concurrence from GSFC

GLAST LAT ProjectMonthly Status Review – June 30, A P&SA – Planned Accomplishments July 2005 Support TEM/TPS, PDU, GASU assembly and testing Support expected completion of production runs at Teledyne and Cicon Work with GSFC to finalize the issues with braided cable design and cracked flex cable connectors. Work with TKR team on flex cable delivery concerns with Pioneer and Parlex Work to close NCRs

GLAST LAT ProjectMonthly Status Review – June 30, 2005 Cost Report

GLAST LAT ProjectMonthly Status Review – June 30, 2005 Cost Variance Explanation Why overrun/underrun? -Did not reduce headcount to follow planned FTE dropoff due to extended production runs at vendors with full time source quality engineers. Also required same headcount as last month to support subsystem production and testing. What will be done to correct? -Source quality engineers at Teledyne and General Technology will not be needed once production ends -Look to consolidate QA headcount at SLAC in July as subsystem production (cables, TEM/TPS) ramps down

GLAST LAT ProjectMonthly Status Review – June 30, 2005 FTE Report

GLAST LAT ProjectMonthly Status Review – June 30, 2005 FTE Variance Explanation Why overrun/underrun? -Source QA support was needed longer than expected at Teledyne and General Technology to support production What is the impact? -Need for source QA support ( 2 FTEs) should end in July What will be done to correct? -Look to consolidate QA headcount at SLAC in July as subsystem production needs (cables, TEM/TPS) ramps down