Chapter 10: Project Schedule Planning
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Project Planning. Learning Objectives: By the end of this topic you should be able to:
Systems Analysis and Design 9th Edition
Project Management: A Managerial Approach
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Spring 2008, King Saud University Bar Chart Dr. Khalid Al-Gahtani 1 What is Activity An activity or task is a given kind and amount of work which: –Consumes.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
BSBPMG503A Manage Project Time 6.5 Develop Schedule The process of analysing activity sequences, durations, resource requirements and schedule constraints.
Importance of Project Schedules
Modern Systems Analysis and Design Third Edition
Systems Analysis and Design Kendall and Kendall Fifth Edition
Chapter 2 Topics –Context-Level DFD –Entity-Relationship Diagrams.
Project Time Management
Business Studies Grade 11.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Gantt Charts and PERT Charts. Copyright © 2009 South- Western/Cengage Learning. All rights reserved. 14–2 Managing Operations Systems Planning Sheet –
Section 11- Goal Setting Theory
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Prepared by: Michael Palazzo
Workshop-3 Gantt and Pert Chart.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Reaching Goals: Plans and Controls
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
System Analysis & Design Chapter V: Information System Planning 1.Introduction Nowadays, Information Systems plays the main role in success or failure.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Reaching Goals: Plans and Controls Today’s smart supervisor.
Appendix A Project Management: Process, Techniques, and Tools.
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Foundations of Technology.  To familiarize students with the function, applications, and requirements of construction management.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Software Project Management
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
1IT Project Management, Third Edition Chapter 6 Chapter 6: Project Time Management.
1 OMGT 3123 Project Management  Project Controlling  Project Management Techniques: PERT And CPM  The Framework Of PERT And CPM  Network Diagrams And.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Project Management Inspections and Reviews 1 February.
Project Management Organization Scheduling 31 January.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Time Management
Project Scheduling Class 7.
Project Management Why do projects fail? Technical Reasons
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
3.0 DESIGN PROCESS FOR THE PROPOSED PROJECT 3.1 TIME PLANNING Now, having understanding the Project Management in general and its strategy in the project.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Project Management Project Controlling
Systems Analysis and Design Kendall and Kendall Fifth Edition
Project Planning By Phaik San Liew.
Systems Analysis and Design Kendall and Kendall Fifth Edition
Systems Analysis and Design Kendall and Kendall Fifth Edition
Chapter 3 Determining Feasibility and Managing Analysis and Design Activities 1.
Presentation transcript:

Project Management

MANAGEMENT BY OBJECTIVES A means of managing and controlling a project to get results. MBO is: ·        Performance improvement system ·        Focused on output (results) not just activity ·        An agreement between supervisor and individual to meet same goals ·        A method of checking progress ·        Can be tied to employee evaluation and compensation ·        Works well for relatively simple projects What does a good MBO plan contain? a.       Mission Statement (we will cover this later) b.      Goals Statement c.       Problem Analysis d.      Objectives e.       Impact Indicators (measuring sticks) f.        Action Plan g.       Review and Feedback Process h.       Evaluation Process i.         Formal Commitments (Shared Ownership) j.        Relate with Resource Support System Benefits: ·        Avoids Activity trap ·        Know Expectations ·        Better Understanding of Whole Organization ·        Improved Employee Motivation ·        Improved Communications ·        Eliminates Non-essential Activities ·        Provides Means to Improve Job Performance

Basic System 1.      Set Goals 2.      Jointly agree on action plan with subordinates 3.      Everyone works toward achieving goals 4.      Periodically review results (exception sheet) 5.      Update goals 6.      Repeat cycle

When agreeing to accept the action steps involved in an MBO system one should be sure that all of the following three attributes are transmitted with each action step. Failure to transmit and failure to accept all will result in a job misunderstanding.

PERT – “Program Evaluation Research Task” (Used for control of complex projects with many interdependent steps) Approach: Analyze the project and specify the basic approach to be used Break project down into reasonable # of activities Estimate time to perform each activity Place the activity in sequence of time, taking into account that certain activities must be performed sequentially while others can be performed simultaneously If a completion date is specified, the diagram is adjusted until this constraint is satisfied.

CONSTRUCTION OF “GANTT” BAR CHART ·        This shows 5 activities ·        To be completed in 15 weeks ·        Some activities start later (some dependence?) ·        At week 3, activity A is ahead of schedule, activity B is behind

Disadvantages of Gantt bar chart ·        Does not explicitly show the dependency relationships among activities ·        Can’t calculate the effect on the whole project of delays in one activity ·        Difficult to detect time line slippage especially on activities with long duration ·        Sub-parts of activities can not be tracked

PROJECT NETWORK

PROJECT NETWORK

TIME-SCALED NETWORK Critical Path Critical Path: longest path through the network (in example B-1, C, D-3 = 15 weeks) Delay: ·        Any delay in activities on critical path extend the project ·        Delays in D-1, D-2 path can be up to 2 weeks without affecting total project

Class Example