Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
4.1 [0] Criteria for Successful Consolidation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners.
DOCUMENT #:GSC15-CL-06 FOR:Presentation SOURCE:Admin WG Chair AGENDA ITEM:Closing; 2.5 CONTACT(S):Jim MacFie
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Admin Working Group Report to Closing Plenary Jim MacFie, Chair Steve Barclay, Vice Chair Document.
Status summary of the ad-hoc discussions 13th of July 2012 oneM2M call.
Joint Legal/Participation Ad-Hoc 21 March 2012 Report.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
1 [4.1]a Criteria for successful consolidation SDOThreshold/Foundation/Launch After/During Formation, Near-Term Comment Summary of discussions Verticals.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
M2M Global Initiative OneM2M April 24, 2012
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Minutes of the Meeting IoT WG GISFI #7 New Delhi, Dec 19-22,
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
© 2013 IBM Corporation OSLC WG Transition **DRAFT** Plan 8 April 2013 Open Services for Lifecycle Collaboration Lifecycle integration inspired by the web.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
4.4 Timeline for M2M Consolidation Susan Miller ATIS Head of Delegation Meeting of Potential M2M Consolidation Partners #2 Washington, D.C. August 17-18,
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
ARIP Technical Committee Convener Call 07 April
CTI Technical Committee Convener Call 11 May
Vertical Outreach Program Create story (presentation) – Identify the needs/challenges (beyond telecom- centric viewpoint) – What we are trying to do –
PROMCODE Technical Committee Convener Call 14 February
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
Doc.: IEEE /296r0 Submission May 2002 Erwin Noble, PhilipsSlide 1 ETSI-BRAN #28 Interworking Group Liaison Report to IEEE WNG Erwin Noble.
- 1 - TTA View of Budget & Secretariat Functions March 28~29, 2012 (Tokyo, Japan) TTA.
1 [4.7]a Structure of M2M Consolidation SDOStructureComment Overall Goals of Structure: Be responsive to the needs of the vertical market stakeholders.
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Summary of main questions on the Partnership Agreement and the secretariat support.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
GNSO/Council Restructure Enhance & Support SGs/Constituencies Improve Communications & Coordination Revise the Policy Development Process Adopt a WG Model.
OData Technical Committee Convener Call June 5, 2012.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Doc.: IEEE /1394r0 Submission November 2008 Jose Puthenkulam (Intel)Slide 1 Summary of m Development Process Date: Authors:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
MoW Report Group Name: TP21 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Jeju, 13 – 16 May 2013Standards for Shared ICT oneM2M Project Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman Document No: GSC17-PLEN-38.
Preparation of the Self-Study and Documentation
ATIS’ Machine-to-Machine (M2M) Activity
Transition Implementation Status Reporting
TTC Activities on IPR in Standards
3GPP Status.
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Admin Working Group Report to Closing Plenary
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
Submission Title: [Task Group 1 Report] Date Submitted: [8May00]
IEEE IMT-Advanced Review Process
How to use 1 Delete the lines and text you don’t need 2
ATIS’ Machine-to-Machine (M2M) Activity
Admin Working Group Report to Closing Plenary
ETSI-BRAN #29 Interworking Group Liaison Report to IEEE WNG
Presentation transcript:

Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012 Doc: Source: ATIS / ETSI Agenda item: 10.1 Editors note: [Text in red within square brackets: To be deleted] Text in blue: New inserted text based on version of 20 Jan 2012 (input to CoU V1a)

Introduction Summary of timeline discussion at Washington meeting: [M2MCons02_31 Draft Meeting Report.doc] “Mr. Foote presented a table that captures a summary of the SDO positions along with a list of consensus items [M2MCons02_26]. There is agreement that the launch of the consolidated group should take place no later than 1Q2012, with the understanding that milestones will be met along the way to meet the established threshold criteria.” [M2MCons02_26 - Summary of SDO proposals on M2M Consolidation 4.4.pptx] “Launch of consolidated group no later than 1Q2012, with milestones to be met along the way to meet the threshold criteria.” In order to keep the envisaged date for launch of the M2M consolidation (Q1/2012) a more detailed time schedule with well defined milestones is necessary. The next pages propose a timeline including milestones and definition of milestones. 2

JULAUGSEPOCTDECJANFEBMARAPRMAYJUNJULAUGSEPOCT M5: TP start prepared M6: WG start prepared Virtual meetings Timeline 3 SDO Meeting#01, Seoul, 21 Jul SDO Meeting#02, Washington, Aug SDO Meeting#03, Berlin, Dec Reach out to verticals for feedback incorporation M1: “Soft Launch” M2: Final Consensus M4: Official Signing Technical Plenary Meeting#1 Virtual SDO meetings SDO Meeting#04, Tokyo, Mar M3: Final Draft Virtual meetings Steering Committee Meeting#1 Steering Committee Meeting#2 Extended

 Milestone M1 – “Soft Launch” IPR regime agreed Communiqué released Material for communication with verticals updated to include Berlin meeting results Target date: 18 Jan 2012, completed  Milestone M2 – Final Consensus Final Consensus reached and documented on all major principles (scope, partnership and participation principles, structure, legal status, participation rules, rights and responsibilities, level of secretariat services, funding principles) Initial Organizations identified and start work on drafting the founding documents Target date: 29 Mar 2012, completed Milestones (1) 4

Milestones (2)  Milestone M3 – Final Draft Final draft of founding documents available (Participation rules, IPR policy and anti-trust policy, funding model/membership fee structure and initial 2012 resources including schedule agreed upon) Partnership Agreement (ready to be signed, for internal approval) Draft Working Procedures available Secretariat support activities identified (e.g. online web presence, on-site meeting support, document editing, document management, branding/publicity) Invitation to Verticals to join oneM2M at the official signing Planning of the first meetings of SC and TP Convenor of Steering Committee nominated Target date: 20 Apr

Milestones (3)  Milestone M4 – Official Signing Draft Agenda of the first SC meeting (2 weeks before M4) 2013 proposed budget (high and low) and funding model/membership fee structure and initial resources including schedule available Provision of secretariat functions agreed upon Founding agreement signed Steering Committee Members identified, call for SC chair candidates Preliminary list of members of the initiative identified Invitations issued to participate Target date: 21 May

Milestones (3)  Milestone M5 – SC #1 Kick off event and ceremony of signing First Steering Committee meeting Convenor of Technical Plenary nominated by Steering Committee Number of participants of Technical Plenary estimated Working Procedures approved by Steering Committee Draft Agenda of the first TP meeting Partners Type 1 may provide a first list of proposed candidate standards/specifications to be transferred into oneM2M Target date: Jul 2012 (3 days), hosted by ATIS and TIA in North America 7

Milestones (3)  Milestone M6 –TP #1 Analysis of the potential candidate standards/specifications to be transferred into oneM2M and potential agreement Initial discussion on Work Plan Initial Working Groups defined Convenors of Working Groups nominated by Technical Plenary Meeting schedule defined Target date: Sep 2012 (5 days), hosted by ETSI in Europe SC #2 (half day) can be co-located with the TP #1 Note budget available TP #2: Dec 2012 (5 days), hosted by CCSA in China, tbc 8