Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
HEL pre-design Diego Perini Superconducting solenoid Operation temperature: 4.2 K, current:about 250A, magnetic field: 5 Tesla Cooled by liquid.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Cryomodule requirements Hitoshi Hayano, KEK for CFS consideration Asian Single Tunnel Design June 1-2,2010.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
STF B.L.C. #4 second Vertical Test Summary Period : 2006/09/05~09/08 Contents : ▪ Q 0 -E acc 2K&4K ▪ Q 0 &E acc time 2K&4K ▪ Summary.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
CAST-CAPP/IBS Detector Integration with the CAST Magnet Lino Miceli CAPP 2 Dec 2015.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
October 7, 2010 HINS Test Cryostat 2 K Conversion Status October 7, 2010.
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
SPL RF coupler: integration aspects
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
RELICS INTEGRATION Many contributors Cryo amp vacuum vessel
MICE Meeting at RAL, Oct-23, 2005
HFM Test Station Main Cryostat
Proximity Cryogenics P&IDs meeting
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
The 11T cryo-assembly: summary of design and integration aspects
Cryostat design Mechanical design: Thermal screens: Specifications:
Alignment of Main Linac Cryomodule (MLC)
Cryostats Some ideas for the new Q1 to Q3 Hi-Lumi WP3 meeting
SNS PPU Cryomodule Instrumentation
CEPC-650MHz Cavity Cryomodule
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities in cold bore Vacuum, need good thermal contact (pressure or indium/copper braid …….) Is 1.8K essential for 2016 run? Amplifier/circulator vessel What is maxm temperature allowed? Size of cavities wrt cold bore Be conservative in dimensions for 2016 Exact values can be used for 2017 ‘Fixing’ cavities in cold bores Thompson’s gun –effect at a quench? Good thermal contact needs pressure contact? Instrumentation Temperature probes etc Metrology Precise internal diameter of cold bore Design study for integration 2017 – Helium possible in cold bores – up to 14 cavities ? Cooling RF Cavities in cold bore – via helium Amplifier/circulator

New vacuum tight flange with electrical feedthroughs to replace the gate valve AMP + 1.8K Cavities at 1.8K New vacuum tight flange with electrical feedthroughs This pipework would be removed First Concept – means feedthrough between antenna and amplifier

New vacuum tight flange with electrical feedthroughs to replace the gate valve Cavities at 1.8K New Vessel at 2K with flange with electrical feedthroughs amp Present concept : direct line between antenna and amplifier

Cryostat intervention MRB - old system helium-4 Flange welded Cold window clamps He line Vacuum line

Cryostat intervention MRB - new system helium-3 cryovalve 70K shield 2K return pipe 70K clamp

New vacuum vessels for preamps and circulators off- centre to avoid obstacles 2016 run – be conservative in size of vessels. Take measurements in situ for 2017 versions

2K Old Helium-3 gas /vacuum system Connected thermally but no gas /vacuum connection 70K thermal shield 70K thermal clamp 2K ~40K 70K 300K Vac pumps 2015 system

2K Old Helium-3 gas /vacuum system Connected thermally but no gas /vacuum connection blank flange 70K thermal shield 70K thermal clamp 2K 2K ?? 70K 300K Vac pumps 2016 system ?

2K Old Helium-3 gas /vacuum system Connected thermally but no gas /vacuum connection blank flange 70K thermal shield 70K thermal clamp 2K 2K ?? 70K 300K Vac pumps 2017 system ? ? blank flange