Sila National Park participates in the European project Bioeuparks that is taking place in the natural parks of five EU countries - the project aims to.

Slides:



Advertisements
Similar presentations
1 Making Contract Opportunities and Awards More Transparent Ahmet Arif Sezgin Public Procurement Authority of Turkey Rabat 03 April 2008.
Advertisements

December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
Award criteria Jari Kallio European Commission
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
EC Explosives for civil uses 22 February 2013, SSDCEI, Brussels, Explosives for civil uses Common Action Plan.
HAYLEA CAMPBELL SUSTAINABLE PROCUREMENT IN THE EU.
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU PROCUREMENT PROCEDURES FOR THE AWARD OF CONCESSION/PPP CONTRACTS.
Making Aarhus work in international forums A workshop on promoting the application of the principles of the Aarhus Convention in international forums Geneva,
Monitoring and Evaluation in Humanitarian Aid: Quality Procedures PROJECT – STRAND 1 – Training and Capacity Building.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
Quality Management Legislation and private requirements.
Community Benefit in Public Procurement April 2010.
Audit of Public Procurement
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
1 «Public Procurement System of the Republic of Azerbaijan» Elshad Samedzade PhD Web-site:
INTERREG IVA 2 Mers Seas Zeeën Crossborder Cooperation Programme Part-financed by the European Regional Development Fund (ERDF) Legal framework:
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
27 September 2004 April 8 th 2005 Rémy RISSER Ecology & Sustainable Development Ministery Sustainable Development Department
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
Expert group meeting on draft delegated act on the European code of conduct on partnership (ECCP) under cohesion policy
Accessibility Antidiscrimination Public Procurement Inmaculada Placencia Porrero Deputy Head of Unit Unit D3 Rights of Persons with Disabilities European.
State Agency on Public Procurement and Material Reserves under the Government of the Kyrgyz Republic Public Procurement System of the Kyrgyz Republic.
Legal developments in the Polish Power Sector Arkadiusz Krasnodębski.
Green Partnerships Local Partnerships for Greener Cities and Regions Pilot sites description 2nd PP meeting Portugal, 8-10 July 2013 Simona Tekavec Arronches,
Transport Modification of the PSO Regulation in the framework of the 4 th railway package Jan Scherp European Commission, DG Transport and Mobility Roundtable.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
The partnership principle and the European Code of Conduct on Partnership.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT meeting, 12 December 2005 Barbara Piotrowska, DG REGIO
Illegal Logging Update and Stakeholder Consultation. Chatham House, Jan 19, Spanish Association of timber importers (AEIM) Illegal Logging Update.
Sustainable Forest Management Certification - Case Study and Future Initatives Calton Frame Resource Manager.
EMTA General Meeting Prague May 2012 Round table on PSO Regulation 1370/2007 “Two years after enforcement, where are we? How efficient is the regulation?
EN Regional Policy EUROPEAN COMMISSION Information and Publicity Structural Funds Information Team Brussels, 30 June 2005 Barbara Piotrowska, DG REGIO.
Evaluation of restrictions: art. 15 and art TAIEX Seminar on the EU Service Directive, 3 May 2007 Carlos Almaraz.
ERANETMED Joint Activities, particularly the 1st Joint Call ERANETMED is funded by the European Commission’s 7th Framework Programme ERANETMED multi-tasks.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Forest certification & legality verification – policy implications The control of uncertified wood in certified supply chains.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and climate change.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Minimum Set of Requirements for Suppliers
PRESENTATION OF MONTENEGRO
Minimum Set of Requirements for Suppliers
INFORMATION SESSION ON GEOGRAPHICAL INDICATIONS
66 items – 70% of circulated products
FSC Advice Note FSC-ADV V1-0
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Gas Regional Initiative
Simplification and reduction of administrative burden.
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
TRACEABILITY REQUIREMENTS UNDER EU GENERAL FOOD LAW
EU Reference Centres for Animal Welfare
Regional Seminar for OIE National Focal Points on Animal Production Food Safety Importance of collaboration between the Veterinary Services and industry.
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
“The transposition of the European Directives on Public procurement
Management Verifications & Sampling Methods
Task Force on Target Setting and Reporting TFTSR
Andrea Sundstrand Associate Professor
World Health Organization
The principle of proportionality and the contents of a contract
European Spallation Source ERIC Procurement
EU Food Safety Requirements: - Hygiene of Foodstuffs -
Outline Background: development of the Commission’s position
"AL HILAL" Islamic Bank" JSC
Presentation transcript:

Sila National Park participates in the European project Bioeuparks that is taking place in the natural parks of five EU countries - the project aims to expand the supply of local biomass from forests managed in a sustainable manner and to promote a more efficient use for heating and/or cogeneration. All this will be achieved through setting up a short or very short supply chain (< 50 km) and small-scale installations (< 1 MW), considering adequate economic margins for the stakeholders

As established by the project in the first phase, through specific meetings a Localized Supply Chain Plan, the operative and permanent tool for the implementation of the supply chain, has been drafted. The Plan will be used in the heating systems of the Park (the Park house, the CTA - territorial coordination for the environment headquarters, local museums, etc.). In the second phase of the Project, the extension, stabilization and activation of the supply chain in the territory of the Sila National Park is expected.

Sila National Park therefore proceeded with entrusting a supply contract for pellet which will be used for the heating system of the places managed by the Park. The operators (logging companies) who were invited to submitted bind for the supply of pellets were the same who attended the meetings organized within the project and signed a Memorandum of Understanding with Sila National Park in date

The technical characteristics of the pellets must comply with EN , type ENPLUS-A1. In particular, pellets must be made by pure round wood or residues - not treated with chemicals – from primary wood processing industry, made 70% of timber conifers (pine, Douglas fir, etc.) and 30% of hardwood (beech, alder, poplar). Energy content must comply with the characteristics referred to paragraph 9.2 of the local legislation, which is: Heating value < 16,5 MJ/kg, Water content < 10% Ash < 0.7% Diameter of 5-6 mm

Each supply must be accompanied by ENPLUS- A1 document, which certifies the possession of the necessary requirements. The supplier has the legal obligation of verifying that the product is in compliance with the technical specifications recommended by the boiler manufacturer. Pellets will be supplied with transparent bags of 15 kg each. On the envelopes, the characteristics of the product, the place of production and the BioEUParks logo will be displayed.

The commitment will take place according to the following procedure art. 125, paragraph 11, of the Code of Contracts. 11. For services or supplies for an amount equal to/or greater than forty thousand euro and to the threshold referred to in paragraph 9, the reliance by fiduciary shall respect the principles of transparency, rotation, equal treatment, after consulting at least five operators economic, if there are of sufficient number of suitable, identified on the basis of market surveys or from lists of economic operators provided by the contracting authority. For services or supplies less than forty thousand euro, has allowed the direct award by the head of the procedure

Total supply will amount to 1974 kilos weight. First delivery - about 987 kilos weight - will be in October, November and December 2015 and will go to the following places: Second delivery will be made in January, February, and March 2016 for the same amount showed above

In addition to the general requirements of Article 38 of the code of contracts, that the Contracting Authority reserves the right to verify at any stage of the procedure, will be exclusively considered companies which: Will be able to demonstrate an extension, stabilization and activation of a short chain in the area of the Sila National Park; Will be able to effectively fulfill deliveries in a maximum of two consecutive days after the order, unless otherwise agreed with the contracting authority; Will provide material that complies with EN class A1 or equivalent; Will be able, in case of request by the Administration, to offer a supplying for individual lots.

Furthermore, during the product delivery the a technical file will be given to the buyer. The file will include detailed product characteristics and physicochemical specifications, and a warranty that the product has been produced within the territory of the Sila National Park. The traceability of the product will be verified thanks to the following documents: Cutting authorization issued by Calabria Region; Purchasing contract of the timber; Summary report, prepared by the director of forestry work, stating in detail the processing steps and the place of origin of the wood, as requested by the Track and Trace system indicated by the LSCP (Localized Supply Chain Plan); Statement that the pellet transformation occurred inside the territory of Sila National Park.