Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.

Slides:



Advertisements
Similar presentations
U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
Advertisements

1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Fermilab Accelerator Complex in the Near Term: Muon Physics Program Eric Prebys Accelerator Physics Center FNAL.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
November 17, Chuck AnkenbrandtFermilab Making More Muons mu2e Conversion and higher intensity beams Project X Physics Workshop Chuck Ankenbrandt.
1 Electron Cloud Measurements at the Fermilab Main Injector Bob Zwaska Fermilab ECloud07 Workshop April 9, 2007.
Opportunities for Experiments Based on Stored Muon Beams at Fermilab Milorad Popovic Jean-Francois Ostiguy Fermilab August, 2014.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
Automated Beam Steering Software at FNAL Keith Engell Accelerator Controls.
Long Range Planning Pier Oddone September 24, 2007.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Antiproton Source Capabilities and Issues Keith Gollwitzer & Valeri Lebedev Accelerator Division Fermilab 1.
Fermilab and Muons Booster, Proton Driver (MECO, PRISM/PRIME, …) David Neuffer Fermilab.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Antiproton Physics Experiments Keith Gollwitzer -- Fermilab Antiproton Sources Accumulator Antiproton Physics Experiments –Precision measurements Method.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Eric Prebys Accelerator Physics Center Fermilab First circulating beam in LHC 9/18/2008.
Fermilab, Proton Driver, PRISM/PRIME David Neuffer Fermilab FFAG05.
F Project X Overview Dave McGinnis October 12, 2007.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Proton Drivers & Muon Sources at Fermilab David Neuffer Fermilab.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Neutrino Physics Opportunities for Fermilab Steering Group 6/12/07 Andy Lankford UC Irvine.
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
F Project X Overview Dave McGinnis August 8, 2007.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Mu2e and Project X, September 3, 2008 E Prebys Background: Proton Economics in Project X Era* Assume  9mA*1ms = 5.3x10 13 protons/linac “blast”  Main.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Proton Drivers & Muon Sources at Fermilab David Neuffer Fermilab.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Proton Source Reference Notes for mu2e at Fermilab 1 Section 1: Compilation of parameters describing the existing Fermilab accelerator complex and the.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Opportunities from the Intensity Frontier to the Energy Frontier J.P.Delahaye/SLAC.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
UK Neutrino Factory Conceptual Design
Future Flavor Physics At Fermilab?
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Considerations on RF systems of SPPC collider and its injector chain
Progress towards Pulsed Multi-MW CERN Proton Drivers
Presentation transcript:

Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys

Mu2e, August 15, 2007 E Prebys 2 General The Fermilab Steering group has presented its report Priorities (post-collider):  LHC Support  ILC R&D  R&D for a new facility to enhance the lab’s “intensity frontier” capabilities at 8, 120, and 800 GeV, primarily for neutrino physics An 8 GeV linear accelerator based on ILC technology, currently referred to as “Project X” Could be running as early as 2015  Consider other opportunities to exploit existing facilities in the near term (no priorities given): Mu2e Neutral K->  (KOPIO) at 8 GeV (uses Debuncher) Charged K->  (KTeV-II) at 120 GeV (uses TeV as stretcher)  scattering at 800 GeV (NUSONG), resurrent TeV fixed target Physics with antiprotons Possibly SNuMI (if ILC only slightly delayed and/or built offshore) –Alternative to Project X !! Main thrust of report

Mu2e, August 15, 2007 E Prebys 3 Specific Mentions of mu2e (talking points) Discussed under 3.2 (Precision Physics)  “An intense 8 GeV proton beam and the Accumulator and Debuncher rings, available after the end of antiproton production for the Tevatron Collider program, would make possible an LFV search experiment that would make, by far, the single most sensitive search for any LFV process. “ In appendix D (under “Precision Physics Experiments with Muons”)  The MECO design has been reviewed for cost and technical feasibility in detail, and a new experiment based on MECO could be developed into a reviewable project at Fermilab with about one year of effort. Physics results at sensitivity below would follow 4-5 years of construction and 2-3 years of running. Upgrades to use a more intense beam following the SNuMI or Project-X construction would be studied and then implemented following the first physics running period.

Mu2e, August 15, 2007 E Prebys 4 Proton Driver vs Project X Proton Driver  8 GeV H - linac feeding directly into Main Injector  Tailored for ~2MW at 120 GeV ~1.5E14 protons per pulse  High energy end uses beta=1 ILC cavities .5-2MW total 8 GeV proton capacity  Problems: Integrated charge/pulse about 3 times higher than ILC -> very different beast. Excess proton capacity (long pulses of H - ions) difficult to transport and use. Project X  Highest 6 GeV exactly like the ILC 9 mA x 1ms 5 Hz  Strip/inject into Recycler  Inject 3 pulses worth (1.7E14 protons) into the Main Injector ever 1.4 second cycle  Leaves up to 4 pulses (200 kW) for other uses  This batches are stripped and stored in the Recycler, where they can be rebunched as needed LAB 2015

Mu2e, August 15, 2007 E Prebys 5 Project X and mu2e Availability of up to four linac each  Compare to max ~35kW with base line scheme Probably cannot slow spill from Recycler  Cannot design around Project X, even if we wanted to (which we don’t !!!) Given the current enthusiasm for Project X, we can’t ignore it, but it shouldn’t become too much of a distraction:  Boiler plate in LOI  More detailed discussion of detector and target upgrades in proposal Must transfer batches to Accumulator and handle more or less as we handle Booster batches  Increased intensity has implications for target and detector

Mu2e, August 15, 2007 E Prebys 6 Important Mistakes in Report (wrt mu2e)* Some confusion about 8 GeV proton availability in NOvA era  Section 4.3 incorrectly states that a program protons debunched and extracted proton beam would take protons away from the 120 GeV program. In fact, that would only be true in the SNuMI scenario.  First paragraph of the "Upgrade to the Fermilab Proton Facility" section (p. 32) incorrectly states that an 8 GeV physics program cannot be supported without compromising the NOvA physics program. Again, this will not be true except under the SNuMI scenario. Discussion of neutral K->  experiment (KOPIO) very confusing  Neglects to mention that this experiment would also require the Debuncher  Bundling it with KTeV-II in Appendix D gives casual reader the impression it somehow uses the TeV stretcher *communicated to Young-Kee Kim

Mu2e, August 15, 2007 E Prebys 7 Significant Omissions in Report Report generally states the impact of the near term proposals on NOvA, but make no mention whatsoever about how they compete with each other, specifically:  Mu2e and KOPIO would not affect NOvA, but would have to share protons and the Debuncher with each other (a la RSVP)  Either of these and/or SNuMI are completely incompatible with continued operation of the antiproton source.  NuSONG (800 GeV protons) and KTeV-II/SY120 compete directly with each other for use of the the Tevatrons, and make some small impact on NOvA, but do not compete directly with Mu2e and/or KOPIO