Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fermilab, Proton Driver, PRISM/PRIME David Neuffer Fermilab FFAG05.

Similar presentations


Presentation on theme: "Fermilab, Proton Driver, PRISM/PRIME David Neuffer Fermilab FFAG05."— Presentation transcript:

1 Fermilab, Proton Driver, PRISM/PRIME David Neuffer Fermilab FFAG05

2 2 Intro–Fermilab Future Plans (~Oddone 9/05)  (Tevatron shuts down ~2009)  First Priority – ILC  Global Study ~1 year –present to DOE (end of 2006)  IF favorable, push for near-term construction at Fermilab  Second Priority – protons  Becomes high priority if ILC near-term not encouraged PROTON DRIVER: 8 GeV, MW superconducting linac  If ILC near-term, continue facility incremental upgrades  Priorities are NUMI, NoVA, …  Some excess proton capacity for other experiments

3 3 From Oddone P5 Talk (9/2005) 20052006200720082009 RF module assembly and testing CDR effort Industrialization Not affordable Much longer R&D needed Looks good! Press for early decision Nothing yet LHC discovery: GO This induces other program choices ILC Proton Driver Budget Required …

4 4 Proton Driver and Muon beams  8GeV Linac can produce streams of 1.5×10 14 8GeV protons at 10Hz  > 10 22 protons/year  Neutrino Physics: main goal  But: Only 1/15 of these needed for Main Injector/NUMI  Are there muon beam experiments that could use this intensity ??  Tertiary muon beams:  P + X → π  π → μ + ν  10 -2 μ/p → 10 20 μ/year or more (other experiments will also be possible)

5 5 Primary Parameter List (Foster, March 2005 reference)

6 6 Review of the PD/Linac Cost (All costs in 2004 K$) Linac Project M&S* 229,779 Project SWF 89,118 Project Subtotal 318,897 G&A # (16.05% M&S & 30.35% Labor) 63,927 Project (incl. G&A) 382,824 Contingency (30%) 114,847 Total Cost 497,670 * Davis Bacon labor shows up as M&S # G&A rate will be lower on large POs

7 7 Proton Driver Parameters 8 GeV Superconducting LINAC EnergyGeV8 Particle Type H- Ions, Protons, or Electrons Rep. RateHz10 Active Lengthm671 Beam CurrentmA25 Pulse Lengthmsec1 Beam IntensityP / pulse1.5E+14 (can also be H-, P, or e-) P/s1.5E+15 Linac Beam PowerMW avg.2 MW peak200 MAIN INJECTOR WITH 8 GeV LINAC MI Beam EnergyGeV120 MI Beam PowerMW2.0 MI Cycle Timesec1.5 filling time = 1msec MI Protons/cycle1.5E+14 5x design MI Protons/hrP / hr3.6E+17 H-minus Injectionturns90 MI Beam CurrentmA2250

8 8 LFV:   A  e  A can use high intensity ExperimentI 0 /I m  T [ns]  T [  s] p  [MeV]  p  /p     A  e  A   e    eee   e     e  10 21 10 17 10 16 < 10 -10 n/a < 10 -4 < 100 n/a < 1000 > 1 n/a > 20 < 80 < 30 < 5 < 10 1…2  10 14 < 10 -4 100> 2030< 10 g  -2 EDM 10 15 10 16 < 10 -7 < 10 -6 < 50 > 10 3 3100 <1000 < 2 Desirable Beam Characteristics But bunched beam is needed

9 9   A  e  A experiments  Next generation of   A  e  A experiments has been proposed  MECO – was to be based at BNL (DOE and NSF rejected)  PRISM-PRIME – based at KEK/JHF  Could be hosted at FNAL proton driver ?  e Conversion workshop  Jan. 11-12 at BNL   A  e  A produces monoenergetic e - (~105MeV) SUSY predictions of   A  e - A MECO single event sensitivity 10 -11 10 -13 10 -15 10 -19 10 -17 10 -21 PRIME single event sensitivity From Barbieri, Hall, Hisano …

10 10 MECO expt. (BNL proposal rejected) Superconducting Production Solenoid (5.0 T – 2.5 T) Muon Stopping Target Muon Beam Stop Crystal Calorimeter Superconducting Transport Solenoid (2.5 T – 2.1 T) Superconducting Detector Solenoid (2.0 T – 1.0 T) Collimators Tracker Time structure

11 11 PRISM-PRIME (Y. Kuno et al.) High intensity pulsed proton beam (bunch length <10ns) 100-1000Hz bunches producing π —> μ bunches Phase rotation with rf field: Δp/p : ±20%  ± 2% P = 68 MeV/c ±20%

12 12 PRISM rf-rotation P = 68 MeV/c ±20%  t = ±12ns (5ns rms) PµPµ  p=±1.9%  p=±3.4% 5-turns, 38% beam decay6-turns, 44% decay

13 13 Proton Beam requirements  MECO experiment  Requires pulses of ~8 GeV protons (<30ns long) every ~1μs (1.4μs) –Obtained by slow extraction of short bunches (in AGS)  Design requires 4  10 13 p/s, 1.5  10 -3 captured μ’s/proton  10 5 μ/pulse  ~6  10 17 μ/year from ~4  10 20 p/year  PRISM-PRIME experiment  Requires proton pulses (<10ns long) at 10 3 /s (~1ms) –4  10 14 p/s (50GeV) 10 -2 to 10 -3 μ’s/proton –Up to 10 22 p/year, > 10 19 μ/year  Single-turn extraction of short bunches (<10ns)  Up to 4  10 9 μ/pulse  Both require pulsed beams, proton linac beam must be repackaged in an accumulator ring

14 14 Recycler as accumulator ring ?  8GeV Linac produces 1ms pulses at 10 Hz  H - injection into Recycler  1ms fills circumference –(100 turns)  Bunch beam into pattern required for expt.  Harmonic 10 buncher for MECO, slow extraction  Harmonic 100 buncher for PRIME, single bunch extraction CircumferenceC=2πR ave 3320m MomentumP8.89 GeV/c Rev. frequency, Period f0T0f0T0 89.8 kHz 11 μs Slip factorη=1/γ 2 - 1/γ t 2 0.0085 Tunesν x, ν y 25.4,24.4 But: Recycler circumference is large 100ms may be too short a time for bunching

15 15 Space Charge Difficulty  Space Charge tune shift:  Parameters: N tot =1.5  10 14,ε N =20π mm-mrad  MECO: 30ns/1μs : B F = 0.03 → δν = 4 : too large  Reduce N to 1.5  10 13 → δν = 0.4  Reduce N to 0.4  10 13 → δν = 0.1  PRISM/PRIME 10ns bunches, 100/ring  B F = 0.1 → δν =1.2: too large (but closer)  Larger ε N, smaller N tot,  Smaller circumference proton ring could be better

16 16 Recycler – Bunching (~for PRISM)  Harmonic 100 buncher (9MHz)  Bunch for 0.1s  (V rf ramps to 140kV)  Bunch lengths reduced to ~5ns rms (Prism wants < 10ns full width.)  Could then extract bunches one at a time over ~0.1s  Uses 1/2 the possible linac pulses (500 bunches/s for PRISM) (100 at 5Hz)

17 17 Other potential proton storage schemes  Accumulator or Debuncher (C= ~454m) after 2010…  Large aperture machines  t  5  Difficult to inject H - (must bend beam from Linac) (B ~600m)  Could take debunched protons from Recycler or Main Injector(in ~450m chunks)  Bunch into pattern needed for experiments  Bunching easier than Recycler  New 8 GeV Storage Ring ??

18 18 New 8 GeV Accumulator/buncher/stretcher  FFAG  Type: FODO racetrack,  Superferric arcs  nonscaling  H - injection into NewRing (10Hz)  700 turns  δν = 0.4 at B F =0.15 (σ=1.5ns)  Harmonic 42 buncher for PRISM, single bunch extraction (40ns spacing)  Slow extraction, single bunch extraction modes CircumferenceC=2πR ave ~454m MomentumP8.89 GeV/c rf frequency, Voltage H=42 V 0 26 MHz 1MV Slip factorη=1/γ 2 - 1/γ t 2 -0.02 Tunesν x, ν y 6, 8 aperturea, b~3,2cm

19 19 Proton Linac (H - ) NewRing (P)

20 20 Fermilab – w/o SRF linac proton driver NOW: Linac  8 GeV Booster (C=454m)  Currently Limited by losses in Booster  5Hz ~ 3  10 12 / pulse  15Hz, 5  10 12 /pulse possible (0.1MW) (6  10 13 protons/s)  NUMI, MiniBOONE, Tevatron p- source  MiniBOONE will terminate soon ??  Single turn extraction is 1.5  s  For pulsed experiments, need a storage ring  Can use Recycler, Accumulator, Debuncher?  Future: New 8 GeV Booster  With 1 GeV linac ??  larger apertures, larger injection energies, deeper tunnel (5  10 13 / pulse ??)  (1MW ??)  With new storage ring

21 21 Detailed  source design does not exist Straw man design worked out for the front end of a factory supported by MARS simulations (Ray et al.) Target + capture solenoid + drift (forward capture) 1.4 x 10 22 protons/year at 8 GeV yields ~3 x 10 21 muons/year. Charged particle spectra at end of decay channel Generic High intensity muon beam

22 22 Summary  Muon Beams from the Proton Driver could be enabled  Potential muon beam facilities could be developed:  PRISM, etc. … could be hosted  More Detailed design needed  Proton Collection –Recycler …. –New Stretcher/Buncher ring ??  Beam line(s)  Experimental area(s)

23 23 References  W. Foster et al., Proton Driver http://tdserver1.fnal.gov/project/8GeVLinac/DesignStudy/  W. Molson, “The MECO Experiment to Search for  - N  e - N with 10 -17 Sensitivity”, U. Va. Seminar, June 2004  MECO  ‘RSVP’ Rare Symmetry Violating Processes (MECO- KOPIO) NSF proposal, October 1999.  PRISM Working group  “An Experimental Search for the μ − −e − Conversion Process at an Ultimate Sensitivity of the Order of 10 −18 with PRISM”, The Prime Working Group, Jan. 1, 2003.  R. Ray & D. Roberts, Proton Driver physics study

24 24 Recycler – Bunching for ~MECO  Harmonic 10 buncher (0.9MHz)  Barrierbucket rf  Bunch for ~1s  (V rf ramps to ~30kV)  Bunch lengths reduced to ~50ns rms (MECO wants ~30ns full width.)  Could then extract bunches in slow extraction over ~1s


Download ppt "Fermilab, Proton Driver, PRISM/PRIME David Neuffer Fermilab FFAG05."

Similar presentations


Ads by Google