High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):

Slides:



Advertisements
Similar presentations
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Advertisements

Lorentz force detuning measurements on the CEA cavity
IU e-Cloud Feedback Workshop March 13, 2007 LA-UR Review of the e-p feedback experiments Rod McCrady Los Alamos National Lab.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Performance of upgraded SPS damper in view of crab cavity tests Complementarity to High Bandwidth Transverse Feedback W. Hofle CERN BE-RF-FB Acknowledgement:
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
OPTIONS FOR THE DESIGN OF A NEW PICK-UP AND SCHEDULE G. Kotzian, LIU-SPS High Bandwidth Damper Review, July 30, 2013.
POTENTIAL OF THE WIDEBAND TRANSVERSE DAMPER G. Kotzian on behalf of HBTFB team G. Kotzian, LIU-2013, April 12, 2013.
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
Summary of visit to BNL and LARP workshop High Bandwidth Feedback perspective Preliminary Report by W. Hofle
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
SPS Transverse Damper with Crab Cavities G. Kotzian, W. Hofle BE-RF-FB, 11. January 2016 Crab Cavity SPS Tests Day I
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
LHC transverse Damper Observations versus expectations W. Hofle BE/RF/FB CERN BE-RF team for ADT L. Arnaudon, P. Baudrenghien, A. Butterworth, G. Cipolla,
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
Feedback Simulations with Amplifier Saturation, Transient and Realistic Filtering Mauro Pivi, Claudio Rivetta, Kevin Li Webex CERN/SLAC/LBNL 13 September.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Transverse Feedbacks against ECE at SPS and LHC W.Hofle CERN BE-RF-FB on behalf of a multi-lab team CERN – SLAC – LBNL – LNF-INFN W. -
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Longitudinal Limitations of Beams for the LHC in the CERN PS 0.
Status of the single-bunch feedback system for the SPS/LHC M. Pivi C. Rivetta, J. Cesaratto, J. Fox, O. Turgut, S. Uemuda, W. Hofle, U. Wehrle, K. Li,
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
Progress with High Bandwidth Transverse Feedback CERN - May 2015 Reported by W. Hofle.
RF acceleration and transverse damper systems
LIU-PS Beam Dynamics Working Group Introduction and objectives
Phase Feed-Forward Piotr Skowroński (CERN)
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Proposals for 2015 impedance-related MD requests for PSB and SPS
Digitizers in CCR for transverse wide-band pick-ups
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Transverse Feedback System (LHC Damper)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
SPS Transverse Damper System
Limits on damping times
The LHC25ns cycle in the PS Triple splitting after 2nd injection
LHC (SSC) Byung Yunn CASA.
Beam dynamics requirements after LS2
Head-Tail Monitor for CC Diagnostics
Presentation transcript:

High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto): /MDreview_Aug09.pdf

Boundary conditions: LS1:2012 LS2: Phase 1: The demonstrator  end 2012 goal: damp head tail motion of single bunch existing equipment (amplifiers, BPWs as kicker and PU) “drive experiments” successful electronics (LARP), close FB loop before end of 2012 all design specifications for phase 2:end of 2012 Phase 2: New pick-up, new kicker, consolidated electronics, higher power amplifiers, preparation of LSS3 in LS1 for installation of equipment at the end of LS1 or later in a short winter shutdown post-LS1 feedback on multi-bunch beam in presence of e-cloud decide on final implementation and LSS3 vs. LSS5 before LS2 R&D and staged implementation: The Path (1) 2

MD results obtained in 2012 Synchronized excitation signal to the bunch. Established method by which time aligning can be performed quickly and reproducibly, using variable delay line. Excited the beam with band-filtered random noise. Excited beam to instability, different modes.

2012 MD slots still needed with LARP participation W. LIU coordination LARP meeting in Frascati November st slot: Beginning of October or before above November LARP meeting: fine timing, excitation of bunch in a train 2 nd slot: As late as possible, weeks 47 and 48 after LARP meeting: tests of new hardware for “demonstrator” to close FB loop 4August 15, 2012

Other 2012 MD slots needed W. LIU coordination One dedicated MD with bunch trains at 25 ns MDs to check the developed hardware orbit compensation (Urs Wehrle) Note: any MDs next year (26 GeV) would be extremely useful (consolidated Hardware) for extended demonstrator tests and prototype specification. 5August 15, 2012

Addressing the specific questions… Which studies will still require significant MD time before LS1? List of topics given above Is any study presently limited by instrumentation or diagnostics? Any improvement possible before LS1? Limited by speed of HW development and availability, rather than intrinsic SPS instrumentation Is any study strongly relying on the installation and test of new hardware before LS1? Yes – the single bunch ‘demonstrator’ studies require the HW for the feedback processing channel to be available…tight for end 2012 How can we optimize the use of the remaining available MD time? Do we need to request for more? The timing of the MD is most critical – as late as possible Which are the main motivations why we could benefit from the extension of the MD run into 2013? Would be very useful indeed, as HW will arrive very late in the year. Increase time for measurement, reduce risk of missing deadline, …

end

cure transverse “single bunch” instabilities by feedback two collective effects are limiting the SPS performance as LHC injector e-cloud TMCI similarities: both effects cause vertical intra bunch instability high chromaticity suppresses instability to a certain extent feedback expected to permit running at low chromaticity and at intensities beyond which high chromaticity is an established cure particular important to maintain small transverse emittances synergy with PS and LHC Job for high bandwidth feedback in SPS 8

July 12, 2012W. 1st SPS HBD WG Meeting9/38 Accelerator Digital / analogue processing Power / kicker / bandwidth Status PS Booster (protons) 50 MeV – 1.4 GeV kin. E. (future: 160 MeV to 2 GeV kin E) no ecloud, long bunches multi turn injection from Linac 2 analogue beam offset signal suppression, analogue delay (cables & switches) 100 W, 50  stripline Limited to 13 MHz in operation But built for 100 MHz bandwidth, baseband H-plane: used and required V-plane: beam stable w/o FB upgrade planned PS (protons, ions) 1.4 GeV – 25 GeV (kinetic E) (future injection at 2 GeV) ecloud observed when beam bunched at 25 ns Spacing, coupled bunch digital system, synergy with LHC Damper for The low level digital processing 80 MHz clock frequency 2 kW solid state power amplifier; 112  stripline (0.9 m length), planned with ~30 MHz bandwidth in baseband, lower cut-off ~50 kHz 2012 under commissioning injection damping and feedback will be beneficial in particular for high intensity CNGS beams and LHC beams. Currently horizontal instabilities are cured by introducing coupling to the vertical plane which constrains the tunes SPS (protons, ions) (14 – 450) GeV/c protons FT (26 – 450) GeV/c LHC beam ecloud observed and is a potential limitation for 25 ns spacing digital notch filter and 1T-delay (Altera FPGA, 80 MHz clock) commissioned in 2000/2001 tetrode amplifiers with two 30 kW tetrodes in push-pull directly coupled to a kicker (base band); feedback bandwidth ~10 kHz to 20 MHz 2001 upgraded for LHC beams H-plane: used in operation V-plane: used in operation used and required for operation above 5x10 12 protons (max ~5.5x10 13 ppp accelerated) SPS High Bandwidth 4 – 5 GS/s clockunder study, GHz BWFeasibility Study LHC (protons, ions) protons: 450 GeV/c – 7 TeV/c ecloud observed and is a potential limtation for 25 ns spacing digital notch filter and 1T-delay, built-in diagnostics 14 bit DAC / DAC Altera FPGA, 40/80 MHz clock 2 um rms resolution tetrode amplifiers with two 30 kW tetrodes in push-pull directly coupled to kicker (base band) similar to SPS system 3 kHz -> 20 MHz 2010 fully commissioned injection damping feedback used in ramp and physics, essential Transverse Feedback Systems in LHC and its injectors