MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.

Slides:



Advertisements
Similar presentations
HQ Structure – Mechanical Model J. Schmalzle 4/8/13.
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
Mechanical Analysis of Dipole with Partial Keystone Cable for the SIS300 A finite element analysis has been performed to optimize the stresses in the dipole.
Christian Löffler Collaring to cold mass finishing 2 Outline Available tooling and operational status CMM of 5.5m coils Instrumentation Pairing.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
LARP Collaboration Meeting Racetrack Coil Fabrication
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXFB Plan for mechanical alignment measurements J.C Perez On behalf of MQXF collaboration team Special thanks to Jose Ferradas for his contribution MQXF.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
MQXFSD3 laminated structure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, P. Moyret.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 17 th 2014.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
MQXC Nb-Ti 120mm 120T/m 2m models
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
ESAC Review February 2013 CEA Saclay
Support structure and target pre-stress
SQXF Mirror QXFSM1 Strain Gauges
ERMC/RMM activities May 2017
J.C. Perez on behalf of SMC collaboration team J.C. Perez
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Discussion session on day 1
Glyn Kirby Magnet AssemblyTechniques.
the MDP High Field Dipole Demonstrator
MQXF updates P. Ferracin October 9th, 2014.
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Cross-section of the 150 mm aperture case
Presentation transcript:

MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T. Sahner, A. Temporal and many others … HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN

OUTLINE  MQXFS model magnet assembly at CERN  Main assembly steps (Slide 5 to 19)  Status on components and tooling (Slide 20 to 24)  Possible MQXFB assembly procedure (7 meter long magnet)  150 mm mechanical model assembly and cooling to 77K  First MQXFS mechanical assembly at CERN using aluminium dummy coils  Conclusions December 11th 2014 J.C. Perez3

MQXFS cross section December 11th 2014 J.C. Perez4  Coils  Coils pole keys  Aluminum collars  Iron & stainless steel pads  Iron masters, alignment and loading keys  Iron yoke  Aluminum shell  Stainless steel shell and welding strip See detailed presentation on magnet components from Paolo Ferracin and shell welding operation from Herve Prin presentation

Shells preparation for vertical assembly December 11th 2014 J.C. Perez5 The shells are instrumented with the strain gauges before starting the assembly sequence 4 short alignment pins are inserted and glued in the lower inner shell slots of the first shell to be installed on top of the assembly base plate The relative angular alignment between the 2 shells is guaranteed by the use of the 2 long pins Short alignement pin Bolted lifting eyes Long central alignement pin Base plate Strain gauges location

¼ yoke lifting and preparation for insertion December 11th 2014 J.C. Perez6 The ¼ yokes are manipulated with a dedicated lifting and pivoting tool. The yokes are inserted on the shells in vertical position

¼ yoke insertion December 11th 2014 J.C. Perez7 Upper radial clamp Lower radial clamp Dedicated clamping tools will be used to radially clamp the ¼ yoke in the shells The angular alignment of the first ¼ yoke is defined by 1 long middle pin and 2 small pins located at the shell extremities

3rd and 4th ¼ insertion December 11th 2014 J.C. Perez8 The Yoke lifting tool is equipped with 2 guiding wheels forcing the yoke against the plastic spacers 2 longitudinal plastic spacers will be used to guarantee a constant gap between yoke and shell preventing interference with the already inserted yokes 2 stainless steel blocks for welding key alignment and tack welding will be bolted to the yokes

Bladders support structure for shell loading December 11th 2014 J.C. Perez9 A cross-shape support inserted in the structure is used to support the bladders for shell pre-loading 4 bladders 1549 mm * 57 mm will be used during shell pre-loading operation. Temporary yoke keys are inserted in the yoke gaps

Lifting and rotating Yoke and Shell assembly December 11th 2014 J.C. Perez10 The yoke and shell assembly will be transported, using a 4 sling lifting tool and adjustable lifting eyes bolted on the yoke, to an existing rotating device. The yoke and shell assembly will be flipped from vertical to horizontal position.

Coils and collars preparation December 11th 2014 J.C. Perez11 Preformed Kapton sheets are mounted on the coil outer diameter for ground insulation. Fiber glass keys are inserted in the longitudinal pole slot. Ground insulation layers (G10 + Kapton) are glued to the aluminum collars inner radius

Coils rotation December 11th 2014 J.C. Perez12 The first pair of coils to be assembled will be rotated up-side down and lifted from their inner face. The coil handling tooling is designed to manipulate the coils by pairs from inner and outer radius. The same tooling can be used to handle coils individually. An existing assembly table used for the 11 T dipole project has been adapted to rotate and position MQXFS coils.

Coil pack assembly: mounting the coils December 11th 2014 J.C. Perez13 A dedicated table has been designed to precisely position and assembly coils and coil-pack components Even if such a tool may be not be 100% needed to perform the coil pack assembly on short model magnets, the concept will be tested and proven to be scalable in view of 7 m long magnets assembly coils equipped with ground insulation and pole keys are positioned on top of the lower 1/4 pad and collar assembly

Collars and pads assembly December 11th 2014 J.C. Perez14 The aluminum collars are assembled and bolted around the coils The same sequence is used to assemble and bolt the iron pads around the collars. The assembly tooling is designed to provide accurate alignment of all components during the assembly process.

Masters and coil pack preparation December 11th 2014 J.C. Perez15 The four masters are equipped with bladders, shims and alignment keys The masters are mounted and clamped to the coil-pack assembly before transportation to the insertion table

Coil-pack insertion concept December 11th 2014 J.C. Perez16 Linear guides will be used to slide the coil-pack into the yoke cavity. The heat exchanger holes are used to support and align the linear guides rails Linear guides and rails Aluminum profile interface to align the rail into the heat exchanger hole

Bladders operation CERN concept December 11th 2014 J.C. Perez17 Bladders and slip shims are removed after full loading operation Coil pack inserted in the yokeMaster clamps are removed Insertion guiding rails are removed4 Bladders operation for final loading 2 lateral bladders are pressurized to insert the remaining nominal keys Lower bladder is pressurized. Top and bottom nominal keys are inserted.

Longitudinal loading & connexion box December 11th 2014 J.C. Perez18 View of the MQXFS Magnet equipped with the longitudinal pre-loading system Design of the splice box and instrumentation plate in progress The final assembly geometry will be checked using a Faro arm or/and with a Leica Laser tracker. Precise Ø6 H7 holes have been drilled on both magnet extremities (yoke, pads and collars) Existing holes in coil poles can be used to install Leica’s reflectors

December 11th 2014 J.C. Perez19  MQXFS model magnet assembly at CERN  Main assembly steps (Slide 5 to 19)  Status on components and tooling (Slide 20 to 24)  Possible MQXFB assembly procedure (7 meter long magnet)  150 mm mechanical model assembly and cooling to 77K  First MQXFS mechanical assembly at CERN using aluminium dummy coils  Conclusions

First batch of aluminium Shell December 11th 2014 J.C. Perez20 4 shells have been ordered and CMM controlled at CERN and LBNL (cylindricity and pins slots position out of tolerance) The shells have been instrumented with strain gauges

New outer aluminium shell configuration December 11th 2014 J.C. Perez21 4 extra forged-rolled aluminum cylinders have been ordered ad are being machined One 774 mm shell and two 387 mm half shells will be used for MQXFS model assembly with real coils Using 3 shells instead of 2 for the 1.5 m model will not significantly impact the assembly procedure nor the schedule See presentation from Mariusz Juchno

Assembly tooling status December 11th 2014 J.C. Perez22 2 Yoke and shell assembly supports and clamps ready for assembly operation Longitudinal compression tooling ready Ground insulation forming tool ready Ground insulation and instrumentation table ready Yoke & shell support to flip from vertical to horizontal position ready. Bladders, shims and slip-shims ready

Lifting tooling status December 11th 2014 J.C. Perez23 Two yoke lifting tools CE certified have been delivered end of October Pads and coil-pack lifting tooling delivered in December 2014 Coils lifting tooling ordered. Due for mid-December 2014

Components for first assembly using instrumented aluminum coils ready December 11th 2014 J.C. Perez24 Aluminum Shells Iron yokes Collars and Pads Masters Instrumented dummy coilsRods End-plates

December 11th 2014 J.C. Perez 25  MQXFS model magnet assembly at CERN  Main assembly steps (Slide 5 to 19)  Status on components and tooling (Slide 20 to 24)  Possible MQXFB assembly procedure (7 meter long magnet)  150 mm mechanical model assembly and cooling to 77K  First MQXFS mechanical assembly at CERN using aluminium dummy coils  Conclusions

Assembly of LQ structure December 11th 2014 J.C. Perez26

MQXFB yoke & shell assembly concept December 11th 2014 J.C. Perez27 Modules composed by 2 aluminum cylinders (2 different module lengths) will be assembled on vertical position and then flipped to horizontal position Each individual subassembly will be positioned on its support structure and assembled with the adjacent one using precision rails and linear guides. The subassembly rods will be replaced by longer ones using small hydraulic cylinders See presentation from Dan Cheng

MQXFB assembly concept December 11th 2014 J.C. Perez28 3 different Bladders length will be required for magnet assembly The option to use 0.5 mm SS sheets for bladders production is being investigated and tested (cheaper) ≈ 0.8 m long shells seems to be the best compromise (raw material and machining cost, vertical assembly) 1.5 m long structure components subassemblies is our preferred solution (see presentation from P. Moyret) 7 meters coil-pack assembly and insertion procedure will be scaled-up from model magnet assembly No show stoppers have been identified See presentation from Dan Cheng

December 11th 2014 J.C. Perez29  MQXFS model magnet assembly at CERN  Main assembly steps (Slide 5 to 19)  Status on components and tooling (Slide 20 to 24)  Possible MQXFB assembly procedure (7 meter long magnet)  150 mm mechanical model assembly and cooling to 77K  First MQXFS mechanical assembly at CERN using aluminium dummy coils  Conclusions

Mechanical 150 mm mock-up December 11th 2014 J.C. Perez30 3 cool-down to 77K have been performed showing good correlation with FEM models Data analysis is in progress The force intercepted at cold by the G10 pole keys (see presentation from P. Ferracin & H. Felice) will be quantified with a dedicated test Low-grade coil #101 will be cut and used for further assembly trials

December 11th 2014 J.C. Perez31  MQXFS model magnet assembly at CERN  Main assembly steps (Slide 5 to 19)  Status on components and tooling (Slide 20 to 24)  Possible MQXFB assembly procedure (7 meter long magnet)  150 mm mechanical model assembly and cooling to 77K  First MQXFS mechanical assembly at CERN using aluminium dummy coils  Conclusions

First yoke and shell assembly at CERN(1/2) December 11th 2014 J.C. Perez32

First yoke and shell assembly at CERN(2/2) December 11th 2014 J.C. Perez33

LN 2 tests in SM18 December 11th 2014 J.C. Perez34 After Xmas brake, 3 cool-down to 77K,with different pre-stress applied to the aluminium dummy coils, are foreseen at CERN in SM18 LN 2 test station

Conclusions MQXFS assembly procedure has been defined and partially tested during the assembly of the 150 mm mock-up 2 identical structures and 2 sets of assembly tooling are operational (CERN & LBNL) CERN assembly tooling (except coil pack assembly & insertion table) has been delivered Coil-pack insertion table will be operational by mid December 2014 Coil-pack assembly tooling is due for April 2015 CERN team has started the mechanical assembly with instrumented aluminium dummy coils in December After Xmas brake, 3 cool-down to 77K, with different pre-stress applied to the dummy coils, are foreseen in CERN SM18 LN 2 test station The 150 mm mock-up equipped with segments of coil #101 will be used to better understand the structure behaviour and define shimming values Tooling design and assembly procedures are scalable for longer magnets December 11th 2014 J.C. Perez35

December 11th 2014 J.C. Perez36 The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Thank you for your attention