The Road to New Plant Approvals Graeme Claridge. New Plant Approvals How do we get to this stage.

Slides:



Advertisements
Similar presentations
CREW CAMP ENVIRONMENTAL REVIEW L. David Glatt, P.E. North Dakota Department of Health Environmental Health Section.
Advertisements

Business Development Homestead Borough Procedures.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
Best Practice Guidelines for Timber Treatment. Current Code published in February 1994.
Charlottesville Residency Monthly Report 1 April 2004   Mission  Essential Tasks Assessment  Construction & Maintenance  Planning & Traffic Engineering.
SHE Code 41: ‘Controlling Pollution to Air, Water or Land’ Safety, Health and Environment (SHE) Group.
Revised: 11/08/2010 Environmental Health & Safety (EH&S) Management David L. Patterson Director, Environmental Health & Safety Cal Poly Pomona Web:
PELLET PLANT LAY DOWN TRAFFIC MANAGEMENT POLICY COMMUNICATION.
How to Implement the CalARP Program
Andersonlloyd.co.nz Auckland, Christchurch, Dunedin, Queenstown 18 May 2015 Reform of Resource Consent Application Process Presenter Rachel Brooking.
Permit to Work Procedure Document Number: KOC.SA.004
21 st Annual Conference. Liquid and Hazardous Waste Management in Christchurch.
Occupational Health and Safety Issues
Residential Construction Unit 1 Mr. Todzia.  Definition-Legal requirements designed to protect the public by providing guidelines for structural, electrical,
CDBG 2015 Technical Compliance. Sections 4.4 – 4.7 Handbook & Application 4.4 – 4.6: Projects 4.7: Residential Rehab Programs.
1 April 11, VOSHA AND YOUR SCHOOL AN OVERVIEW OF YOUR REGULATORY OBLIGATIONS.
SARMA SHREQ PROGRAM Development for Safer Concrete Manufacturing & Delivery RPF MAY 2007 Presented by: Nico Pienaar [Director - SARMA] Presented by: Nico.
Presented to: By: Date: Safety Management Systems Oklahoma FFSHC Stephanie Schroeder, CSP November 14, 2013.
Land Use & Code Basics Baseline Information on Permits and Processes.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
Permitting Hydrogen and Fuel Cell Installations in Canada An Update Pierre Gauthier, H2E North America Air Liquide Sept nd International Conference.
ENVIRONMENTAL RISK MANAGEMENT AUTHORITY NGĀ KAIWHAKATŪPATO WHAKARARU TAIAO What is happening in 2005? Hazardous Substances.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
The OSB Environmental and Natural Resources Section The Promise of Development: Natural Resource Issues in a New Economy May 7-8, 2009.
© CHCS CHCS Aspects of REACH (2) Peter Short Chemical safety consultant Safety Data Services Poole.
ENVR 247 Spring Semester Environmental Practices.
1 RMA Basics Topic 4 – Planning & the decision making process.
Application – Identifying, Listing Equipment, and Documentation
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
Fire Safety in the Theater By: Haley Patton Patti Ott Beaney Corral
©PDP 2007 solutions for your environment PATTLE DELAMORE PARTNERS LTD Comparison of the Hazardous Substance Plans and Rules among Regional Councils Lynn.
LOCATIONAL AND SUPPLEMENTAL CRITERIA FOR UTILITY SCALE PHOTOVOLTAIC SOLAR FACILITIES.
NZAAA Conference 2010 Making the RMA work for your business Lynette Wharfe The AgriBusiness Group © Coryright The ArgiBusiness Group.
SECOND UNITS IN BRAMPTON BREB BUSINESS BREAKFAST October 8, 2015.
UTA - REAE /31/07: Architecture & Governmental Context for Development.
HSNO Rules Safety Class Ammunition and Primers of Class 1.4S Propellant Powders 1.3C & 1.1C and Gunpowder 1.1D Classification Overview Weight Limit Triggers.
Interlocal Agreement with Flagler County related to Airport Development September 16, 2014 City Council Meeting.
Community Development Department Special Exception Vehicle Rental and Leasing St. Joe Plaza.
Decision required Home Complete Start Action 2014 Edition BLUEPRINT MAP KEY A start node that indicates where to begin the map Indicates the direction.
Safety Management Standards. Introduction Health and Safety Procedures (which identify the risks, hazards and ways of mitigating these) are weak in that.
Permit Process & Application Guide
Regional and Local Land Use Planning Office of Planning and Research December 7, 2015.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Joy Patterson, Principal Planner City of Sacramento March 16 th, 2016 For the 2016 Planning Academy.
Local Development (San Diego)  Development Services is responsible for managing the majority of the construction and development project review services.
City Council Meeting – January 10, 2007 Rezoning Application No Salters Creek Material Recovery Facility.
Planning & Community Development Department Rose Bowl Aquatic Center Master Plan 360 North Arroyo Boulevard Predevelopment Plan Review PPR City.
INNOVASSYNTH TECHNOLOGIES INDIA LIMITED, KHOPOLI
Refrigeration Issues and Developments
Scoping Meeting April 20th 6:00 pm
PRESENTATION OF MONTENEGRO
Capital Facilities Team Presentation Board of Education
NZ regulation and policy
City Government (Obtaining Permits).
Design of a Commercial Shopping Center
Tony Almond Onshore Oil and Gas Policy Health and Safety Executive
SHE Code 41: ‘Controlling Pollution to Air, Water or Land’
Land use planning/security related issues Group 4
CHAPTER 3 Developing the Event Site
Tam O’Shanter Rezoning
Occupational and Environmental Health and Safety Services
Matthew Kandefer, HSE Manger Honeywell UOP
The Role of the Building Department
County Costs Charged to Projects
Application for Zoning Amendment
Challenges of Inspectors in Lessons Learned Reporting
City Council Meeting November 14, 2016
1. Process Hazards Checklists
Presentation transcript:

The Road to New Plant Approvals Graeme Claridge

New Plant Approvals How do we get to this stage

New Plant Approvals Key word - Consultation –Regional Councils –Local Councils –HSNO and ERMA –OSH –Emergency Services

New Plant Approvals Regional Councils Land Use Consent – Environmental Hazard Assessment Fire Reports Discharge Consents –Stormwater Discharge –Air Discharge –Neighborhood Consultation Notified/Non Notified

New Plant Approvals District or City Councils District Plan Compliance Permitted or Discretionary Activity May place additional restrictions to operations – Building Consents Neighborhood Consultation may also be required Discharge Permits –Stormwater Discharge –Air Discharge –Noise –Traffic Management issues

New Plant Approvals HSNO Approvals Prelimiary Approval Fire Report (where Applicable) Hazardous Zone Requirements and Tank Spacing Design Code compliance Hazardous Substances Management Plan OSH Consultation Pressure Vessel Certifications (outside HSNO) Preliminary HS&E plan Fire Service Notification (where applicable)

New Plant Approvals Now we can start building

New Plant Approvals HSNO Approvals Location Test Certification Approved Handlers Signage Requirements Hazardous Substances Management Plan Site and Plant Emergency Management Plan Stationary Container Certification (and Piping) Bund Integrity Tests Electrical Certification for Hazardous Zones Safety Equipment, OSH Inspection Fire Management Systems, Fire Service Consultation