Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.

Slides:



Advertisements
Similar presentations
LAO PDR Summary Findings from NOSPA Mission and Possible Next Steps.
Advertisements

Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
What is an M and E Plan?. Organizing the Work of M and E An M and E System -- the 12 components as a whole – Sets out broad vision at national level An.
Towards a model M&E system for AIDS programs Kampala April
February Dakar, Senegal
High Level Regional Consultation for Policy Makers to Enhance Leadership in Planning the National HIV & AIDS Response S P Aligning AIDS & Development Planning.
Social Housing Foundation. SHF Presentation to Parliament Structure of Presentation  Background & Approach  Focus of SHF Reflection on “Capacity building”
Campus Improvement Plans
 Capacity Development; National Systems / Global Fund Summary of the implementation capacities for National Programs and Global Fund Grants For HIV /TB.
Pillar 4a Information management
Comprehensive M&E Systems
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
Common recommendations and next steps for improving local delivery of climate finance Bangkok, October 31, 2012.
Unit 9. Human resource development for TB infection control TB Infection Control Training for Managers at National and Subnational Level.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Cross Border Animal Health Plan of Action – Kenya and Uganda Four Strategic areas 1. To improve prevention, management and control of cross border animal.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
‘Every Newborn’ Country Consultations Country Consultation Objectives Main objective: To provide an opportunity to engage key stakeholders in participatory.
Development and Implementation of a National Multisectoral Output Monitoring System (SHAPMoS) for HIV Responses in Swaziland:  Challenges and lessons learned.
1 OPHS FOUNDATIONAL STANDARD BOH Section Meeting February 11, 2011.
1 Capacity Building: Strategy and Action Plan GEF-UNDP Strategic Partnership Capacity Development Initiative.
IPC Global Strategic Programme ( ) IPC Global Partners: IPC REGIONAL Strategic Programme IPC Regional Steering Committee Meeting – March.
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Evidence and Information for Policy Health Metrics Network Strengthening Country-Level and Global Tracking of Health Outcomes.
Project Overview, Objectives, Components and Targeted Outcomes
INTOSAI Public Debt Working Group Updating of the Strategic Plan Richard Domingue Office of the Auditor General of Canada June 14, 2010.
Unit 10. Monitoring and evaluation
Ensuring the Fundamentals of Care in Family Planning and Reproductive Health Services MODULE 2 Facilitative Supervision for Quality Improvement Curriculum.
GHANA Developing CSA within the National Agriculture Sector Investment Plan while reinforcing inter-sectoral consistency: progress, bottlenecks and support.
Participatory research to enhance climate change policy and institutions in the Caribbean: ARIA toolkit pilot 27 th meeting of the CANARI Partnership January.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
CONNECTICUT HEALTH FOUNDATION: Update on Evaluation Planning for the Strategic Plan.
XXX_DECRIPT_MON00/1 Quality and impact of Social Science and Operations Research by the Special Programme in Human Reproduction Department of Reproductive.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
ROLE OF INFORMATION IN MANAGING EDUCATION Ensuring appropriate and relevant information is available when needed.
Africa Health Workforce Platform & Observatory Presentation to the 1st conference of the Asia-Pacific Action Alliance on HRH (AAAH): October 2006.
April_2010 Partnering initiatives at country level Proposed partnering process to build a national stop tuberculosis (TB) partnership.
Ministry for Women, Youth, Children and Persons with Disabilities.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
NSDS DESIGN PROCESS: ROAD MAPS & OTHER PRELIMINARIES Prof. Ben Kiregyera NSDS Workshop, Addis Ababa, Ethiopia 9 August 2005.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
Evolution to date: where the clusters have come from, where have we reached and where should we be heading? GNC Annual Meeting 13 th -15 th October, Nairobi,
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
CCC’s Bi-Monthly Member Meeting GHP Operational Plan 2016 By: Soeung Saroeun, ED EL Sotheary, HOP 08 December 2015, KSSA, Phnom Penh Vision: Sustainable.
Observatories for the Health Workforce in Africa VIII REGIONAL MEETING OF THE OBSERVATORIES OF HUMAN RESOURCES FOR HEALTH IN THE AMERICAS LIMA, PERU
Kathy Corbiere Service Delivery and Performance Commission
ELEMENTS OF STRATEGY FOR ACHIEVING SOCIAL PROTECTION FLOOR Global Network, Cape Town 7 December 2012 BY AFRICAN LABOUR RESEARCH NETWORK (ALRN)
DEVELOPING THE WORK PLAN
Comprehensive M&E Systems: Identifying Resources to Support M&E Plans for National TB Programs Lisa V. Adams, MD E&E Regional Workshop Kiev, Ukraine May.
ACSM at Country Level Sub Group Meeting
December Why Program-for-Results (PforR)? Development Effectiveness and Client Demand – PforR responds to client demand that could not be fully.
Session 2: Developing a Comprehensive M&E Work Plan.
Introduction to the NAP process & the NAP Expo NAP-Expo 8– 9 August 2014, Bonn, Germany LEG Thinley Namgyel.
Central American Certificate Course: HIV Monitoring and Evaluation for HIV/AIDS Policy and Program Management BZ ES GT NI PA CR February 3 rd to 9 th.
Developing a Monitoring & Evaluation Plan MEASURE Evaluation.
Monitoring and Evaluating Rural Advisory Services
Developing reporting system for SDG and Agenda 2063, contribution of National Statistical System, issues faced and challenges CSA Ethiopia.
NATIONAL HIV&AIDS M&E FRAMEWORK
Project Cycle Management
Monitoring and Evaluating Rural Advisory Services
Claire NAUWELAERS, independent policy expert
April 2011.
SRH & HIV Linkages Agenda
February 21-22, 2018.
GSF Results and Financial Monitoring Workshop
Comprehensive M&E Systems
Mrs.Dharshana Senanayake Director General
Presentation transcript:

Consultant Advance Research Team

Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions 2.Human capacity for HIV M&E 3.Partnerships to plan, coordinate, and manage the HIV M&E system 4.National multi-sectoral HIV M&E plan 5.Annual costed national HIV M&E work plan 6.Advocacy, communications, and culture for HIV M&E COLLECTING, VERIFYING AND ANALYZE DATA 7.Routine HIV programme monitoring 8.Surveys and surveillance 9.National and sub-national HIV databases 10.Supportive supervision and data auditing 11.HIV evaluation and research USING DATA FOR DECISION MAKING 12.Routine HIV programme monitoring

Understanding M&E Data Needs 8. Are collective efforts being implemented on a large enough scale to impact the epidemic (Coverage, Impact)? Surveys & Surveillance 7. Are interventions working/making a difference? Outcome Evaluation Studies 6. Are we implementing the programme as planned? Output Monitoring 5. What are we doing? Are we doing it right? Process Monitoring & Evaluation, Quality Assessments 4. What interventions and resources are needed? Needs, Resources, and Response Analysis & Input Monitoring 3. What interventions can work (efficacy & effectiveness)? Are we doing the right things Special studies, Operations research, Formative research & Research synthesis 2. What are the contributing factors? Determinants Research 1. What in the problem? situation Analysis & Surveillance OUTCOMES AND IMPACT MONITORING OUTCOMES OUTPUTS ACTIVITIES INPUTS Are we doing the right things? Are we doing them right? Are we doing them on a large enough scale? Understanding Potential Response Monitoring & Evaluating National Programmes Determining Collective Effectiveness Problem Identification

Main Parts of M&E System

12 Components of M&E System

Performance Goals: Establish and maintain a network of organizations responsible for HIV M&E at the national, sub-national, and service-delivery levels. Performance Results - The following elements are in place: – Leadership: Effective leadership for M&E in key organizations. – Human Resources: Job descriptions for M&E staff; adequate number of skilled M&E staff; defined career path in M&E. – Organizational Culture: National commitment to ensure M&E system performance. – Organizational Roles and Functions: Well-defined organizational structure, M&E unit; M&E focal points, private and civil society organizations and its mandates, roles and responsibilities. – Organizational Mechanisms: Routine mechanisms for M&E planning and management. – Organizational Performance: Key organizations achieve their annual work plan objectives for M&E. Organizational Structure with M&E Functions 1

Performance Goals: Ensure adequate skilled human resources at all levels of the M&E system in order to complete all tasks defined in the annual cost national HIV M&E work plan. Performance Results - The following elements are in place: – Defined skill set for individuals and organizations at national, sub- national, and service-delivery levels. – Work force development plan, including career paths for M&E. – Costed human capacity building plan. – Standard curricula for organizational and technical capacity building. – Local and/or regional training capacity, including links to training institutions. – Supervision, in-service training and mentoring. Human Capacity for M&E 2

Performance Goals: Establish and maintain partnerships among in- country and international stakeholders who are involved in planning and managing the national HIV M&E system. Performance Results - The following elements are in place: – National M&E Technical Working Group – Mechanism to coordinate all stakeholders. – Local leadership and capacity for stakeholder coordination. – Routine communication channel to facilitate exchange of information among stakeholders. Partnership for Planning, Coordinate and Manage M&E System 3

Performance Goals: Develop and regularly update a national M&E plan including identified data needs, national standardised indicators, data collection procedures and tools, and roles and responsibilities for implementation of a functional national HIV M&E system. Performance Results - The following elements are in place: – Broad-based multi-sectoral participation in developing the national M&E plan. – The national HIV M&E plan is explicitly linked to the National Strategic Plan. – The national HIV M&E plan describes the implementation of all 12 components of a national HIV M&E system. – The national HIV M&E plan adheres to international and national technical standards for HIV M&E. – A national M&E system assessment has been completed and recommendations for system strengthening have been addressed in a revised national M&E plan. National Multi-Sectoral M&E Plan 4

Performance Goals: Develop an annual costed national M&E work plan, including the specific and costed HIV M&E activities of all relevant stakeholders and identified sources of funding. Use this plan for coordination and assessing progress of M&E implementation throughout the year. Performance Results : – The M&E work plan contains activities, responsible implementers, timeframe, activity costs and identified funding. – The M&E work plan explicitly links to the work plans and government Medium Term Expenditure Framework (MTEF) budgets of the NAC. – Resources (human, physical, financial) are committed to implement the M&E work plan. – All relevant stakeholders endorsed the national M&E work plan. – The M&E work plan is updated annually based on performance monitoring. Annual Costed National M&E Work Plan 5

Performance Goals: Ensure knowledge of and commitment to HIV M&E and the HIV M&E system among policymakers, programme managers, programme staff, and other stakeholders. Performance Results : – The national HIV communication strategy includes a specific HIV M&E communication and advocacy plan. – M&E is explicitly referenced in national HIV policies and the National Strategic Plan. – M&E champions’ among high-level officials are identified and are actively endorsing M&E actions. – M&E advocacy activities are implemented according to the HIV M&E advocacy plan. – M&E materials are available that target different audiences and support data sharing and use. Advocacy, Communication and Culture for M&E System 6

Performance Goals: Produce timely and high quality routine programmed monitoring data. Performance Results - The following elements are in place: – Data collection strategy is explicitly linked to data use. – Clearly defined data collection, transfer, and reporting mechanisms, including collaboration and coordination among the different stakeholders. – Essential tools and equipment for data management (e.g., collection, transfer, storage, analysis). – Routine procedures for data transfer from sub-national to national levels. – Well-defined and managed national HIV database to capture, verify, analyze, and present programme monitoring data from all levels and sectors, including data on prevention, treatment, care and support, and finances. Routing Program Monitoring 7

Performance Goals: Produce timely and high quality data from surveys and surveillance. Performance Results - The following elements are in place: – Protocols for all surveys and surveillance based on international standards. – Specified schedule for data collection linked to stakeholders’ needs, including identification of resources for implementation. – Inventory of HIV-related surveys conducted. – Well-functioning biological surveillance system. – Well-functioning behavioural surveillance system, including on cultural practices. Survey and Surveillance 8

Performance Goals: Develop and maintain national and sub-national HIV databases that enable stakeholders to access relevant data for policy formulation and programme management and improvement. Performance Results - The following elements are in place: – Database(s) designed to respond to the decision-making and reporting needs of different stakeholders. – Linkages between different relevant databases to ensure data consistency and to avoid duplication of effort. – Well-defined and managed national HIV database to capture, verify, analyze, and present programme monitoring data from all levels and sectors. National & Sub-national Database 9

Performance Goals: Monitor data quality periodically and address any obstacles to producing high-quality data (i.e., data that are valid, reliable, comprehensive, and timely). Performance Results - The following elements are in place: – Guidelines for supervising routine data collection at facility- and community-based HIV service delivery levels. – Routine supervision visits, including data assessments and feedback to local staff. – Periodic data quality audits. – Supervision reports and audit reports. Supportive Supervision & Data Auditing 10

Performance Goals: Identify key evaluation and research questions, coordinate studies to meet the identified needs, and enhance the use of evaluation and research findings. Performance Results - The following elements are in place: – Inventory of completed and ongoing country-specific HIV evaluation and research studies. – Inventory of local HIV evaluation and research capacity, including major research institutions and their focus of work. – National HIV evaluation and research agenda. – Ethical approval procedures and standards. – Guidance on evaluation and research standards and appropriate methods. – National conference or forum for dissemination and discussion of HIV research and evaluation findings. – Evidence of use of evaluation and research findings (e.g., referenced in planning documents). Evaluation and Research 11

Performance Goals: Disseminate and use data from the M&E system to guide policy formulation and programme planning and improvement. Performance Results - The following elements are in place: – The National Strategic Plan and the national M&E plan include a data use plan. – Analysis of data needs and data users. – Data use calendar to guide the timetable for major data collection efforts and reporting requirements. – Timetable for national reporting. – Standard format for reporting and data tabulation. – Information products tailored to different audiences and a dissemination schedule. – Evidence of information use (e.g., data referenced in funding proposals and planning documents). Data Dissemination and Use 12