MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.

Slides:



Advertisements
Similar presentations
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Advertisements

Muon Front End Buncher, Phase Rotation, Cooling Schematics & CAD model based on MICE Cavities Alan Grant Daresbury (April 10, 2012)
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
MuCool Test Area RF Workshop Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 15, 2010.
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 26, 2010 University of California, Riverside,
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Status of 201 MHz Prototype Cavity and Curved Be Windows Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
D. Li and R. Rimmer, RF Workshop, Fermilab, MHz Cavity Refurbishment and suggestions on future tests Derun Li and Robert Rimmer* Lawrence.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
5-Year RF R&D Plan Derun Li Lawrence Berkeley National Laboratory NFMCC and MCTF Phone Meeting Friday, September 18, 2009.
RF Cavity / Coupling Coil Module
Allan DeMello Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008 RFCC Module and Subcomponents Mechanical Design.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
MICE RF Project & Towards Step VI MICE Project Board - March 8, 2012 Alan Bross 1.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Office of Science 3/8/ LBNL MICE Project Status Spectrometer Solenoids, Coupling Coils and RFCC Modules Steve Gourlay MICE Project Board March.
NCRF R&D Programs and Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MUTAC Review at BNL April 28, 2004.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MICE RFCC Module Status: RF Cavities Derun Li A. DeMello, S. Virostek, M. Zisman Lawrence Berkeley National Laboratory NFMCC Collaboration Meeting The.
MICE RFCC Module and 201 MHz Cavity Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 15, 2009.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
201 MHz NC RF Cavity R&D for Muon Cooling Channels
MICE RF System - Status Alan Bross Fermilab. RF Cavities for MICE I Eight 201-MHz cavities in the MICE cooling channel First five cavities arrived at.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
201-MHz RF Cavity Construction (Plan) for MICE Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory NFMCC Meeting March 17, 2008.
MICE RFCC Module Derun Li Lawrence Berkeley National Laboratory MICE Schedule Review RAL, UK May 24, 2011 May 24, 2011.
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
Progress on the MICE RFCC Module Mike Zisman/Steve Virostek Lawrence Berkeley National Laboratory MuCool Test Area RF Workshop October 15, 2008.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RFCC Module Status Derun Li Lawrence Berkeley National Lab NFMCC-MCTF Collaboration Meeting LBNL, Berkeley, CA January 25, 2009.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
RFCC Module and RF Cavity Construction
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
Update on 201-MHz RF Cavity Construction (Plan) for MICE
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
US Construction Project: SSs, PRY, Cavities and test program MICE Project Board and RLSR – November 17, 2014 Alan Bross1.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
RF R&D (Issues) for Muon Ionization Cooling Channels
Overview of the RFCC Module and 201-MHz Cavity Design
MICE Coupling Coil Update
Presentation transcript:

MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February 9, 2012

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 2 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 2 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Current Status of RFCC Module RF Cavities: All 11 beryllium windows received at LBNL (1 st RFCC module) Ten ceramic RF windows received Six tuner flexures are being fabricated at Fermilab Components for 6 actuators are being fabricated RF coupler design has been modified to eliminate the gap between the outer coax and the RF loop Fabrication of fixturing for the electropolishing is complete Mechanical smoothing of the cavity inside surface before EP Single cavity vacuum vessel, being fabricated at Keller Technology in Buffalo New York, is complete and should be at Fermilab this wk.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 3 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 3 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Beryllium Windows Eleven beryllium windows have been fabricated so far: Curved thin (0.38-mm thick) window with TiN-coating on both sides Received two new beryllium windows recently, these two windows have been fabricated by Materion Electrofusion (fomer Brush-Wellman) to replace the windows rejected due to excess distortion with improved brazing design/technique: no distortion is observed.

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 4 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 4 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 RF Cavity Frequency Tuner Components Dual – action actuator Flexure tuner arm RF cavity Cross-section view Tuning range:  230 kHz

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 5 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 5 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Cavity Frequency Tuner Flexure Six full size tuner flexures are being fabricated at Fermilab Jan , 2012 in Fermilab Finished tuner arm

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 6 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 6 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Actuator Component Fabrication Center plate Lower piston Upper piston Lower support Component for six actuators are currently being fabricated by a local vendor The actuators will be assembled at LBNL

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 7 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 7 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 RF power (loop) coupler RF power (loop) coupler design has been modified to eliminate the gap between the loop and the outer coax tube

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 8 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 8 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Testing/experience of the prototype cavity at MTA: sparking at the coupler The coupler design has been changed slightly to increase the gap spacing The sparking region can be TiN coated if necessary (plan to be tested at MTA using the prototype cavity) Adding diagnostics: arc detector at the coupler region RF Power (loop) Coupler (old) Old MICE design Cross-section view MTA RF coupler

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 9 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 9 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 RF power (loop) coupler Modified MICE RF power coupler design is complete, drawing package has been delivered to FNAL, and ready for fabrication Fabrication of the couplers will start soon Cross-section view

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 10 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 10 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Cavity Measurements Cavity Measurements Cavity physical measurementCavity frequency measurement Physical measurements for the six remaining cavities expected to take approximately 1-1/2 weeks (60 hours) RF measurements and tuning to a center frequency after EP

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 11 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 11 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Cavity Electropolish at LBNL Cavity Electropolish at LBNL The inner surface of each cavity will be mechanically smoothed and then electropolished at LBNL using the similar techniques developed at JLab for the prototype cavity Fabrication of EP fixturing is complete and electropolishing will start in soon (ES & H approval) Electropolishing process will take approximately 1- 2 days for each cavity or 4 weeks to complete all 10 cavities Cavity section view EP rotation fixture at LBNL

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 12 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 12 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Simulations of MICE RF Cavity Study of external magnetic field on MICE RF cavity and coupler (Dr. Tianhuan Luo) 3D simulations (from CAD model) using SLAC’s Omega-3P code: f = MHz 3D simulations (from CAD model) using SLAC’s Omega-3P code: f = MHz MP simulations, and RF breakdown studies with an external magnetic field MP simulations, and RF breakdown studies with an external magnetic field

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 13 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 13 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Single RF Cavity Vacuum Vessel Single Cavity Vacuum Vessel Exploded View

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 14 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 14 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 Fabrication of the single cavity vacuum vessel is complete at Keller Technology in Buffalo New York Single Cavity Vacuum Vessel Single Cavity Vacuum Vessel and MuCool Coupling Coil Magnet Vacuum vessel stand Vacuum vessel Vacuum vessel cover plate

MICE RFCC Module – MICE Schedule Review at RAL, UK Page 15 Derun Li - Lawrence Berkeley National Lab – May 24, 2011 MICE RFCC Module Update – MICE CM32 at RAL, UK Page 15 Allan DeMello- Lawrence Berkeley National Lab – February 9, 2012 RFCC Future Work RFCC Vacuum Vessel: RFCC Vacuum Vessel: Vessel design is complete but needs to be updated to incorporate changes to the interface with the new coupling coil cryostat design Vessel design is complete but needs to be updated to incorporate changes to the interface with the new coupling coil cryostat design Fixturing for the assembly process needs to be finalized and drawings for fabrication generated Fixturing for the assembly process needs to be finalized and drawings for fabrication generated RFCC Module: RFCC Module: Finalize fixturing for module assembly and shipping Finalize fixturing for module assembly and shipping for aligning the frequency tuners onto cavities for aligning the frequency tuners onto cavities for inserting the cavities into vacuum vessel for inserting the cavities into vacuum vessel shipping skid/tilt fixturing for shipping RFCC to RAL shipping skid/tilt fixturing for shipping RFCC to RAL RF control/analysis : RF control/analysis : Diagnostics/control/analysis/interfaces Diagnostics/control/analysis/interfaces LLRF control (amplitude/phase) and correlations with detectors LLRF control (amplitude/phase) and correlations with detectors Timing signal from detector, and calibration & synchronization with RF Timing signal from detector, and calibration & synchronization with RF