Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Nick Walker KEK-DESY meeting 7 th March 2005.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Question 25: Delineate the R&D program remaining before a technical design review (TDR) and full cost estimate can be prepared. What are the major projects.
Office of Science U.S. Department of Energy 1  Now in international R&D phase (baseline design defined); validate technology, engineering design, cost.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
Global design effort 1-2 May 06 LCFoA Meeting Global design effort Americas 1 G. Dugan ILC/GDE and Cornell University LINEAR COLLIDER FORUM OF AMERICA.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Global Design Effort ILC: From RDR to EDR or “How to Spend the Money” Nick Walker GDE.
Tor Raubenheimer SLAC FY07 Budget Proposal ART FY07 Budget Meeting SLAC May 3 rd, 2006.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Global Design Effort 22 March 2007 Tor Raubenheimer1 ILC Machine Overview and Critical R&D ALCPG Meeting Tor Raubenheimer.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
July 25, 2007 Fermilab ILC School Americas Slide 1 ILC Test Facilities Sergei Nagaitsev Fermilab.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
On the Way to ILC Shekhar Mishra Fermilab Talk presented on behalf of ILC-GDE 2/16/06 Talk Presented at the 2006 Aspen Winter Conference: "Particle Physics.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
ILC-GDE ILC-Americas 9/21/05ILC-Americas Regional Efforts1 G. Dugan ILC/GDE and Cornell University International Linear Collider Industrial Forums Fermilab.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Fermilab SUMMARY of DISCUSSION Work packages for EDR Main Linac: QUAD package and Instrumentation N.Solyak/K. Tsuchiya Installation and Alignment F.Asiri/A.Tetsuo/R.Ruland.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Presented by Marc Ross - for the ILC Project Managers: Research and Development Resources PAC Review, Vancouver, Marc Ross, Fermilab - Global.
Global design effort Americas 20 April 06 P5 meeting 1 G. Dugan ILC/GDE and Cornell University P5 meeting Apr. 20, 2006 ILC-Americas Regional Program.
J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.
26 Apr. 07 ILCSC-MAC, FNAL Global Design Effort 1 Asian R&D Activity and Resources K. Yokoya KEK ATF/ATF2, STF KEK budget Korea, China, India.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Tor Raubenheimer SLAC ILC Accelerator Efforts SLAC DOE Program Review June 13 th, 2007.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
ART and the SLAC program Nan Phinney SLAC. DOE/NSF ART Program Review April 29/30, 2009 Page 2 Linear Collider R&D SLAC has been working towards a Linear.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
Chris Adolphsen Sergei Nagaitsev
ILC Global Design Effort
Barry Barish GDE Caltech
Electron Source Configuration
Presentation transcript:

Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas Regional Team Director

Global design effort DOE meeting 8/10/06 Global design effort Americas 2 FY07 Budget process April ‘06: Labs submit FY07 ILC program requests, in the form of work packages (leader and key personnel, scope of work, milestones and deliverables, FTE, M&S) May 3-4, ‘06: Meeting at SLAC to review FY07 requests: ~200 WP’s >$100M. May-June ‘06: –Solicit guidance from GDE Global R&D Board on priorities of the R&D-related work in the FY07 request –Solicit guidance from the GDE RDR Management Board on priorities of the RDR- and TDR-related work in the FY07 request –Identify FY07 WP’s which could be candidates for funding from lab infrastructure or generic R&D programs

Global design effort DOE meeting 8/10/06 Global design effort Americas 3 FY07 Budget process April-July ‘06: In a parallel process, Ozaki panel of the LCSGA evaluates and prioritizes the regional interest component of the FY07 request. This process concludes at the July GDE meeting in Vancouver. July ‘06: On the basis of input from the GDE and the LCSGA, the ART Director reviewed the FY07 request and, for each WP, chose a category: –Support fully in FY07 –Defer 25%, 50%, 75%, or 100% to FY08 or later –Support 1/2 on ILC FY07 funds, 1/2 on lab infrastructure or on generic R&D (in FY07, if funding is available) –Support fully on lab infrastructure or on generic R&D (in FY07, if funding is available)

Global design effort DOE meeting 8/10/06 Global design effort Americas 4 $60M Budget Funding by program element $12M Reserve: $5M for detectors, $6.2M for accelerator (incl. univ. prog.), $1M for detectors or accelerator

Global design effort DOE meeting 8/10/06 Global design effort Americas 5 $60M Budget Funding by lab

Global design effort DOE meeting 8/10/06 Global design effort Americas 6 FNAL Program 100% funded: Cavity fabrication, Cryomodule assembly facility, Vertical test stand, BCP+EP+Vertical test at Jlab and Cornell, 3.9 GHz Cryomodule, Conventional facility design, MDB Cryogenics and Horizontal Test Stand, magnet, instrumentation and cryogenics TDR engineering 75% funded: Program management, Type IV cryomodule design and parts 50% funded: ILCTA RF power systems, ILCTA instrumentation and controls, MBD operations, linac acceleration simulations, EP R&D, BDS collimation system design, cryomodule TDR engineering, cavity fabrication cost reduction study, vibration study 25% funded: BCP facility at ANL, magnet prototyping, LLRF controls, control system TDR engineering

Global design effort DOE meeting 8/10/06 Global design effort Americas 7 FNAL Program Defer: DR accelerator physics, Control system design, Instrumentation design, Cavity EM simulation, 3.9 GHz crab cavities, pre-production EP facility, second horizontal test stand 50% funding from infrastructure: Test facility control and instrumentation systems, Full funding from infrastructure: Test facility LLRF, NML facility infrastructure, NML cryogenics, NML electron source upgrade, NML and IB1 operations 50% funding from generic R&D: EP R&D, cavity cost reduction, Full funding from generic R&D: SCRF materials research

Global design effort DOE meeting 8/10/06 Global design effort Americas 8 SLAC Program 100% funded: HA power supply and diagnostic processor development, positron source design, ATF2 optics, magnets and movers, cavity BPMs, associated electronics, and operations, electron cloud studies, linac wakefield calculations, Marx modulator prototype, RF distribution system, conventional facility design, linac beamline design 75% funded: Program management, BDS design, SC linac quad and BPM development, DR design, HA kicker, RTML design, global system design, NC positron capture structure, ATF beam dynamics, instrumentation, and multibunch feedback, L-band klystron acquisition, Marx modulator DFM 50% funded: Sheet beam klystron, photocathode R&D, BDS vacuum, IR and collimation system TDR engineering, positron source TDR engineering, test facility co-ordination, installation studies, electron source design, ESA/LCLS bunch length monitor, control systems design, FNAL test facility instrumentation, controls and LLRF, DTI modulator

Global design effort DOE meeting 8/10/06 Global design effort Americas 9 SLAC Program 25% funded: Coupler improvement effort, laser/gun/injector R&D, HA control system modules, control system design 50% funding from infrastructure: Photocathode R&D, FNAL test facility instrumentation, controls and LLRF Full funding from infrastructure: L-band facilities in ESB 50% funding from generic R&D: Sheet beam klystron, ESA/LCLS bunch length monitor Full funding from generic R&D: Polarized RF gun

Global design effort DOE meeting 8/10/06 Global design effort Americas 10 ANL Program 100% funded: EP processing, DR design and optimization, HA power systems 75% funded: Program management, positron source design, HA instrumentation 50% funded: Control system work, DR beam dynamics 25% funded: HA control system Defer: RF phase distribution, time-resolved diagnostics, X-ray alignment, gamma-ray undulator, DR magnet design

Global design effort DOE meeting 8/10/06 Global design effort Americas 11 BNL Program 75% funded: FF quad full length coil, BDS conceptual design work, 50% funded: Vibration R&D, FF systems TDR engineering, direct wind quench threshold Full funding from generic R&D: Polarized SRF photocathode development, emittance and flat beam simulations, laser development, gun tests

Global design effort DOE meeting 8/10/06 Global design effort Americas 12 JLab Program 100% funded: EP+Vertical test at Jlab (also listed as part of Fermilab program), Large/single grain cavity R&D 50% funded (other half on infrastructure): Cryomodule value engineering Full funding from generic R&D: Dark current studies, multi-layer films,

Global design effort DOE meeting 8/10/06 Global design effort Americas 13 LBNL Program 100% funded: ATF injection/extraction kickers 75% funded: Program management, DR collective effects, inj/extraction transient effects, 50% funded: DR vacuum and mech. systems TDR design, DR studies at ALS, multi-bunch impedance and feedback systems, ATF beam dynamics studies 25% funded: LLRF and RF signal distribution Defer: DR injection/extraction line design, dynamic aperture, low emittance tuning, positron source undulator design, higher-order beam diagnostics and tune monitor, IR magnet design Full funding from generic R&D: Universal accelerator parser

Global design effort DOE meeting 8/10/06 Global design effort Americas 14 LLNL Program 100% funded: Marx modulator, nanoBPM system 75% funded: Positron source target design 25% funded: Coupler development Defer: Laser system development for laser wires, beam dump development

Global design effort DOE meeting 8/10/06 Global design effort Americas 15 LANL Program 50% funded: Cavity processing Defer: Optimized converter-modulator

Global design effort DOE meeting 8/10/06 Global design effort Americas 16 $1.2M “pure” regional interest: –Fermilab site civil engineering development (FNAL, SLAC), site-specific linac and damping ring design (FNAL) ~$15M “mixed” GDE and regional interest: - ILC-Americas communications (ART), sheet beam and CPI klystron (SLAC), SCRF power couplers and cavities (FNAL), EP processing and cavity test infrastructure (FNAL, ANL, Jlab, LANL,Cornell), large grain/single crystal R&D (Jlab), Cryomodule fabrication and assembly (FNAL), FF magnet development (BNL) Regional Interest items Identified by LCSGA Ozaki panel:

Global design effort DOE meeting 8/10/06 Global design effort Americas 17 Infrastructure

Global design effort DOE meeting 8/10/06 Global design effort Americas 18 Generic R&D

Global design effort DOE meeting 8/10/06 Global design effort Americas 19 $45M Budget $6M Reserve: $5.2 M for accelerator (incl univ. prog), $0.8M for accelerator or detector

Global design effort DOE meeting 8/10/06 Global design effort Americas 20 $45M Budget Funding by lab