Presentation is loading. Please wait.

Presentation is loading. Please wait.

Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.

Similar presentations


Presentation on theme: "Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration."— Presentation transcript:

1 Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration

2 Americas Preamble In preparing this analysis of the scope and resources needed to carry out 1) GDE Task Force Recommendation (or under discussion recommendation) –The R&D to address crucial issue with ILC cavity and Cryomodule & 2) Regional Interest Draft Recommendations to –Strengthen U.S. SRF technical capabilities and prepare the U.S. with the infrastructure, expertise and industrial capabilities necessary to host the machine. We have tried to make a balance between the scope and resources. The Cavity, Cryomodule and RF Unit R&D Program has a higher priority over the Regional Interest Recommendations. We have discussed this with Gerry, Satoshi and others. This presentation includes their comments. Please tell us what we have missed so that we can improve this program.

3 Americas Step - 1 At the ART meeting at SLAC we presented the scope of a collaboration plan that attempts to capture both the “GDE R&D objectives” as well as the “Regional Interest objectives” as expressed by the US Regional Interest Panel The following table re-iterates the growth model and yield improvement model we presented. It scopes activities in terms of number of cavities, cryomodules, RF units per year. We analyzed the needed infrastructure to carryout this program with a vision for the future We invited people to submit comments on the scope so it could be adjusted.

4 Americas Plan Presented at SLAC S0  S1  S2… (Including Regional Interest Discussions)

5 Americas Step - 2 We conferred with the principals and the management at MSU, LANL, JLab, ANL, Cornell and Fermilab –Described the scope as presented at the ART meeting held at SLAC –Reviewed their capabilities to address the scope –Made specific proposals to these labs based on our analysis of strength and interest. –Invited these labs to submit specific proposals and costs to address the scope –Present the work package from each collaborating laboratory later in the talk

6 Americas Step - 3 We have analyzed four programs based on the following budget guidance from Gerry –$75M (150% of Target 2) –$50M (100% of Target 2) –$25M (50% of Target 2 and Close to Target 1) –$10M (50% of Target 1) We started with determining the cost for the full scope plan as presented at SLAC. We call this Plan I. The cost for Plan I is came very close to Gerry’s 150% x Targets 2 for 08 and 09.

7 Americas US SRF Infrastructure Strength Cavity Processing and Vertical Testing R&D Facility –Jlab (30 FY07, 40 FY08, 50 FY09) cycles/yr –ANL/FNAL ( 50 FY08, 60 FY09) cycles/yr –Cornell (12) cycles/yr –VTS @FNAL 70 cycles/yr (07) Horizontal Test Stand –FNAL 24 cavities/yr Cavity Dressing and Cryomodule Assembly –FNAL 12/yr (FY07) Limited cavity fabrication capability in US industry

8 Americas US SRF Infrastructure Direction Automated Cavity Tuning –100+ Cavity/yr (FY09) Processing and Vertical Testing (Pre-Production Next Generation Facility, with redundancy) –100+ Cavity/yr (FY09) Horizontal Test Stand –Additional 48 Test/yr (Maximum Capacity needed) Cryomodule and RF Unit Assembly and Test without and with beam Increased cavity fabrication capability in US industry –Electron Beam Welder

9 Americas Jlab: Production Schedule for 31 Cycles / Year With some Upgrade This can be 40-50 cy/yr

10 Americas Schedule for Pre-Production and Next Generation Processing Facility

11 Americas Plan I (150%) = 75 M$ for 08, 09 0809 Cavities & Cryomodules, for S0, S1 and Regional Interest 32.254.5 Basic R&D to improve performance, incl ACD activities 4.33.4 Cavity, CM and RF Unit Infrastructure37.717.7 Grand Total74.275.6 Plan 1 Spreadsheet

12 Americas Distribution of FTE FY08 FY09

13 Americas Plan 1: Summary of FY08-09 Detailed Plan 1 Spreadsheet

14 Americas Distribution of Fund FY08 FY09

15 Americas Plan II (50 M) Plan 2 Spreadsheet Strategy: Drop processing and testing cavity and CM infrastructure, Reduce regional interest cavities in 09 0809 Cavities & Cryomodules, for S0, S1 and Regional Interest 32.244.7 Basic R&D to improve performance, incl ACD activities 4.33.4 Cavity, CM and RF Unit Infrastructure12.82.2 Grand Total49.350.3

16 Americas Plan III (25 M) Plan 3 Spreadsheet Strategy: –Further reduce cavities and CM from Regional Interest, –Put all cavity processing and testing, cryomodule and RF Unit infrastructure to zero 0809 Cavities & Cryomodules, for S0, S1 and Regional Interest 20.420.8 Basic R&D to improve performance, incl ACD activities 4.33.4 Cavity, CM and RF Unit Infrastructure00 Grand Total24.724.2

17 Americas Plan IV (10 M) Plan 4 Spreadsheet Strategy: No Cavity and Cryomodule processing infrastructure Reduce Cavity and Processing R&D by x2, Reduce cavity activity. 0809 Cavities & Cryomodules, for S0, S1 and Regional Interest 7.758.81 Basic R&D to improve performance, incl ACD activities 2.141.7 Cavity, CM and RF Unit Infrastructure00 Grand Total9.910.5

18 Americas Plan 1: MSU Work Package Recommended Program –Cavity Autopsy –Single Cell Cavity (R&D) –Advanced Cavity and Material Science studies (R&D) SRF Infrastructure –Upgrade ultra-pure water and high pressure rinse –Nine-cell structure vertical test dewar Budget –UPW and HPR: $80k (08), $60k (09) –Vertical dewar: $150k (08), $60k (09) –Cavity Autopsy: $250k/year –Test single-cell cavities: $50k/year –Advanced Cavity and Material Science studies: $135k/year FY08: $635k and FY09: $555k

19 Americas Plan 1: LANL Work Package Recommended R&D Program –Cavity Autopsy SRF Infrastructure (Partly Funded in FY07) –Re establish cavity testing at LANL –1.3 GHz Power Amplifier –Thermometry provided by Fermilab Budget –2.5 FTE FY08,09 : $208k and $214k –M&S FY08,09: $495k and $689k –Indirect Cost FY08,09: $288k and $297k FY08: $991k and FY09: $1,200k

20 Americas Plan 1: Cornell Work Package Goal : S0.2 Contributions, Determine if a new cavity is qualified to reach high gradients Plan: Vertical EP, HPR, test new 9-cell cavities Background –Proven successful for single cells –EP under development for 9-cells –Scope of Work : Process and test one cavity per month: (Production cavity activities) –Heat treatment and tuning to be carried out elsewhere (need to include cost of those treatments and shipping in overall budget). Budget: –2 FTE + 100 K (liquid helium, acids…) –RF power source 300 – 400 Watt (60 K$) (if not funded in 07) –Smaller diameter vertical test dewar (60 K$) (if not funded in 07) –Present dewar was used for very large 200MHz cavities –Reduce liquid helium usage per test M&S cost = 220 K each in 08, 09

21 Americas Plan 1: Cornell Work Package (R&D) Explore basic parameters for HPP with 9-cell ILC Cavity – Qe, Pulse Length, Power Level Complete vertical test stand insert for HPP of 9-cell cavities (0.5 FTE) –Test stand design started in 06, continue in 07 Available –About 2 MW, 1.3 GHz source, 250 us pulse length –Waveguide to coax switch and waveguide run to test pit –Input coupler/cold window Scope: EP, HPR and Vertical tests 9-cell cavities with HPP including vacuum accidents and recovery. 6 tests per year (1 FTE + 50 K M&S)

22 Americas Plan 1: Cornell Work Package (ACD) Design 9-cell cavity with HOM couplers to achieve adequate damping (0.5 FTE) –Chose best aperture 60 – 70 mm Order two 9-cell re-entrant cavities with HOM couplers (250 K) –One with fine-grain, one with large-grain Nb? Process and test two 9-cell re-entrant cavities (0.5 FTE) –Fine grain with EP, large-grain with BCP –6 tests per year

23 Americas Plan 1: Cornell Work Package Budget Summary 20082009 FTEM&SFTEM&S S0 9-cell EP and Vertical Test 22202100 HPP 9-cell1.5501 ACD: 9-cell Reentrant 0.52500.550 Totals400 k520 k350 k200 k With Overhead680 k710 k595 k340 k Total1390 k940 k

24 Americas Jlab: Modified Funding Request for FY07 Existing FY07 MOU would need modification –Include costs for 31 process cycles (≈ 32.2K/cycle) 999.4K$ w/ 5 FTE’s, ½ from Jlab –Infrastructure support Dedicated RF system 100K$ Second Test-stand 60K$ Tooling Development 60K$ Process monitoring 60K$ (implement witness sample program) Total 280K$ –Contingency 15% on 31 cycles 192K$ Total $1471K in FY07 (We recommend this: S0)

25 Americas Plan 1: Jlab Work Package Processing and Vertical Testing of 9 Cell Cavity –30 cy/yr in FY07 (Estimate Based on Previous Slides, additional M&S resources may be needed in 08 and 09) –Process 40 cy/yr in FY08, 32 k per (1.23 M) –50 cy/yr in FY09 (1.6 M) –$200k per year as an estimate for additional resources contingency –$365k per year Cryogenic cost Single Cell R&D to improve the Processing (0.25M each year) Field Emission studies for tracking the contamination (0.1M each year) ACD: LL Shape Cavities, Large Grain and Single Crystal (0.5 each year) FY08: $2.65M and FY09: $2.62M

26 Americas Plan 1: ANL Work Package 08 Electropolish S0.2 ILC cavities - 1.5 FTE, $225 K M&S for full-time operation and throughput of 1 procedure/week Install new HPR system, $200k High-pressure rinse S0.2 ILC cavities –1.0 FTE, $60K M&S Installation of a PLC-based control system for EP - 0.5 FTE, $75 K Optimize existing EP hardware/Interface with U.S. EP vendors/develop and optimize hardware suitable for large-scale EP (1 FTE)

27 Americas Plan 1: ANL Work Package 09 Electropolish S0.2 ILC cavities – 2.0 FTE, $337 K M&S for full-time operation and throughput of 1.5 procedures/week High-pressure rinse S0.2 ILC cavities – 1.0 FTE, $60 K M&S Optimize existing EP hardware/Interface with U.S. EP vendors/develop and optimize hardware suitable for large-scale EP (1 FTE) FY08: $1.4M and FY09: $1.5M

28 Americas Order 125 cavities Heat treat, tune, HPR and Vertical test: 50 cycles/ EP at Argonne Horizontal test 16 “good” cavities Work with LANL and MSU to supply thermometry diagnostics for failed cavities Single cell R&D Materials R&D collaboration Continue Testing First cryomodule (type III) assembled in 07 from DESY supplied cavities Assemble cryomodule #2 (Type III) Test cryomodule #2 Plan 1: Fermilab Work Package 08

29 Americas Plan 1: Fermilab Work Package 08 Assemble cryomoudle #3 (Type IV) Order parts for 4 Cryomodule Gen IV – For S2 RF units, & industrialization start Continue Next Generation CM design, manufacturability, transportability, cost reduction Involve industry in activities Test and treatment facility operations Refrigeration (and misc) for Operation, S0, S1

30 Americas Plan 1: SRF Infrastructure Work Package 08 Install 2 sets of vertical test stands VTS including refrigeration Install one additional HTS Install CM test stand (RF is in X.8) RF unit infrastructure Install one beam welder for cavity industry to increase number of cavity vendors Install Next Generation and Pre-Production cavity processing (scanning, EP, BCP, tuning, heating) and preparation (HPR, clean room, baking) infrastructure to handle 100 cycles per year

31 Americas Order 218 cavities Heat treat, tune, HPR and Vertical test 90 - 100 cycles/ EP at Argonne & FNAL Horizontal test 48 “good” cavities Assemble 4 cryomodules (Type IV) Test 4 CM Order parts for 12 CM (Type IV) – CM industrialization (18 M) Continue Next Generation CM design, manufacturability, transportability, cost reduction Test facility operations Involve industry in activities Single cell R&D Materials R&D collaboration Plan 1: Fermilab Work Package 09

32 Americas Plan 1: SRF Infrastructure Work Package Finish and commission cavity processing (scanning, EP, BCP, tuning, heating) and preparation (HPR, clean room, baking) infrastructure to handle 100 cycles per year Install one beam welder for cavity industry, increase number of cavity vendors Finish installation of module test stand 2 M RF unit infrastructure

33 Americas Next Step Take a Break Take a over all view of the ILC Projects in US and see if all topics are covered. Look at balancing the plan, schedule, resources. Study and discuss other R&D and Production models Suggest a more realistic 2010 and beyond plan


Download ppt "Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration."