Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Optical Manufacturing Solutions 1 Probe Assembly.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Sputter Stand Safety Specifics Electrical Hazards High Voltage : Electrical power is required for the high voltage supply, gauging, system controller and.
Ion source maintenance on the MAT 253
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Progress and Plan for Superconducting RF Cavity RF Group.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Improvements for next parts PIMS production meeting February 2013 Rolf Wegner.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
ESS cavities interfaces
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Manufacturing process, validation and factory test
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
Assembly of the doorknob
SPL RF coupler: integration aspects
CERN – Zanon discussions
Cryomodule test stand at ESS site
Assembly of Crab Cavities couplers in SM18 clean room
T5.2: Harmonization - Material and Component Reference
Status of straw production straw module assembling
Operating SRF systems reliably in a “dirty” accelerator
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Mathieu, Gabriel, Max, Spyros, Guillaume
UK RFD Pre-Series cryomodule
Test box for ProtoDUNE SP – Integration Test
WP 3 coordination meeting Saclay May 2008
Main Coupler R&D at DESY
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Assembly instructions for M-K all bolt together hoppercone kit.
IMP Cryomodule Assembly and Alignment
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
Cryomodule Assembly Plan
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting: Assembly of the ISOLDE Cryomodules K. Artoos, A. Boucherie, P.F. Marillac, T. Renaglia, G. Villiger, K. Schirm, W. Venturini

OVERVIEW CONDITIONING OF PIECES FOR CLEANROOM CAVITIES DELIVERY COUPLER SYSTEM ASSEMBLY PROCEDURE TUNER SYSTEM ASSEMBLY PROCEDURE RF CABLES ASSEMBLY PROCEDURE 19/03/2014Mathieu Therasse BE/RF/SRF2

CONDITIONING OF PIECES FOR CLEANROOM 19/03/2014Mathieu Therasse BE/RF/SRF3 Baldaquin ISO5 in SM18 (for conditioning) Piece preparation - All piece has to be degreased -Before entering in baldaquin clean it with alcohol and blow with N 2 gas -The person inside has to blow it with N 2 gas -Clean it again inside the Baldaquin (with cleanroom cloth with alcohol) -Put it in 2 plastic bag (Antistatic and used for clean room) with N 2 gas and close it Cleanroom assembly SM18 Before entering in ISO7 -Remove the first plastic bag -Blow it with N 2 gas -Give it to the person inside the cleanroom (who blows the bag from inside to outside with N 2 gas) -Open the last plastic just before installation Rmk: The person outside has to manipulate all piece with gloves (without powder)

CAVITIES DELIVERY 19/03/2014Mathieu Therasse BE/RF/SRF4 Cavity storage: -Beamport support (installed before the RF test) -Tuning plate and tuning plate collar (installed before the RF test) -Special support for the multifunction trolley (installed after the RF test) -Beamport, pick-up and coupler protections (under design) -2 plastic bags (antistatic, PEBP) with N 2 gas Cavities will be stored in SM18 in ISO5 Baldaquin on a support trolley. Cavities will be transported between the baldaquin and the cleanroom with a special trolley.

COUPLER SYSTEM ASSEMBLY PROCEDURE 19/03/2014Mathieu Therasse BE/RF/SRF5 RF coupler line Motor Control UHV rotary motion Rod RF power coupler

UHV ROTARY MOTION FEEDTHROUGH INSTALLATION 19/03/2014Mathieu Therasse BE/RF/SRF6 Preparation - Reception of the UHV rotary motion from MDC Vacuum - Drilling of the rotary axis on the vacuum part and of the extension rod - Leak detection of the UHV rotary motion - Connection of extension rod and UHV rotary in the ISO5 baldaquin - Conditioning in double plastic bags (PEBP) with N 2 gas Installation on the top plate (for top plate leak test) -Clean (dust cloth and alcohol) and check (no particle, scratch) top flange and UHV Rotary motion knifes -Put the CF 40 copper gasket -Fix the UHV rotary motion extension rod feedthrough

ROTARY AXIS INSTALLATION ON THE CRYOMODULE 19/03/2014Mathieu Therasse BE/RF/SRF7 Preparation -Axis reception (+ support ring) -Degreasing (102bldg or 867bldg) -Conditioning in Baldaquin ISO5 in SM18 (alcohol and 2 plastic bags with N 2 gas) Procedure -Pass the axis through the passive thermal screen from the bottom, and plug it to the UHV rotary motion axis (Hexagonal head). -Fix the support ring in order to maintain the rod on the passive screen (2 half rings). The rod is supported by the thermal screen Support ring Top view Screen Support ring Bottom view

RF POWER COUPLER INSTALLATION 19/03/2014Mathieu Therasse BE/RF/SRF8 Preparation -Coupler reception (Cold tested in SM18 vertical Test stand) -Conditioning in baldaquin Procedure -Put the antenna all out (in order to protect it) -Put the Hexagonal head of the coupler in the cylindrical piece of the axis -Give an angle to the axis in order to pass the coupler through the support -Screw it on the cavity -Put the antenna ALL IN

Preparation -Mount the motor control in the baldaquin ISO5 -Conditioning with 2 plastic bags with N 2 gas COUPLER MOTOR CONTROL INSTALLATION 19/03/2014Mathieu Therasse BE/RF/SRF9 Procedure -Put the handle on the motor -Put the motor on the TOP switch position (antenna ALL IN) -Fix it on the UHV rotary motion (tighten the bellow and 4 screws) -Put the antenna ALL OUT (by hand with the handle) -Adapt the position of the BOTTOM switch (antenna ALL OUT) if it is necessary -Put the antenna all in Bellow Switch

PICK-UP INSTALLATION 19/03/2014Mathieu Therasse BE/RF/SRF10 Preparation -Reception of the antenna, copper extension, RF connector -Degreasing of each piece at the chemistry -Clean each part with alcohol, blow with N 2 gas and do the assembly in baldaquin ISO5 in SM18 -Conditioning with 2 plastic bags with N 2 gas Installation on the cryomodule - Fix the antenna on the cavity

19/03/2014Mathieu Therasse BE/RF/SRF11 TUNER SYSTEM ASSEMBLY PROCEDURE Tuner line Motor control Axis Lever arm

TUNER MOTOR INSTALLATION 19/03/2014Mathieu Therasse BE/RF/SRF12 Procedure (top plate leak test) -Check that the motor is on the BOTTOM END switch (corresponding to the tuner plate flat position) + 6mm (6 turns) -Clean the knife with a dust cloth and alcohol -Check particle or default on motor and top plate knifes -Put a CF 63 copper gasket -Fix the motor on the top plate flange and screw it Preparation -Motor control reception -Conditioning with 2 plastic bags with N 2 gas

19/03/2014Mathieu Therasse BE/RF/SRF13 TUNER AXIS INSTALLATION Procedure - Pass the axis through the thermal screen from the bottom - Connect the second part of the axis to the tuner control Preparation - Reception of the 2 axis parts, 2 link motion -Degreasing -Assembly of the axis in baldaquin ISO5 -Conditioning with 2 plastic bags with N 2 gas

LEVER ARM INSTALLATION (I) 19/03/2014Mathieu Therasse BE/RF/SRF Procedure -Put the central screw on the tuning plate and block it with a nut. -Fix the tuning mechanism to the tuning plate collar. Screw the grey part. Preparation -Reception of lever arm mechanism -Degreasing in Bldg 102 -Mounting and conditioning in baldaquin in SM18 -Conditioning in 2 plastic bags with N 2 gas 14

19/03/2014Mathieu Therasse BE/RF/SRF15 Procedure - Adjust position of levers and clevis at the rod and in the centre - Fix the screws and the counter screws to connect the rod LEVER ARM INSTALLATION (II)

RF CABLES ASSEMBLY PROCEDURE 19/03/2014Mathieu Therasse BE/RF/SRF16 Preparation -Cable reception from Huber and Suhner with connectors (N type, 7/16”) -UHV RF connector receipt from Hositrad Ceramtec cie, and Allectra -Leak detection on each connector -Cable testing (with Network analyser, attenuation…) -Conditioning cables and connectors with 2 plastic bags and N2 gas Procedure -Clean and check connectors and top plate flanges knifes (dust, scratch) -Pass the cable through the thermal screen and connect it to RF connector on the top plate -Fix the insulating tube on the passive screen -Connect cables to the pick-up and the RF power coupler N type double sided on CF 40 flange (Allectra) 7/16” double sided on CF 63 flange (Ceramtec)

19/03/2014Mathieu Therasse BE/RF/SRF17

19/03/2014Mathieu Therasse BE/RF/SRF18

19/03/2014Mathieu Therasse BE/RF/SRF19

19/03/2014Mathieu Therasse BE/RF/SRF20

19/03/2014Mathieu Therasse BE/RF/SRF22

19/03/2014Mathieu Therasse BE/RF/SRF23

19/03/2014Mathieu Therasse BE/RF/SRF24

19/03/2014Mathieu Therasse BE/RF/SRF25