The STAR MRPC TOF Project BNL December 1, 2005 Geary Eppley, with Jo Schambach, for the TOF Group.

Slides:



Advertisements
Similar presentations
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Advertisements

Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
STAR MRPC TOF: Project Overview BNL January 26, 2006 Geary Eppley Rice University.
1 STAR TOF Calibration. 2 Detectors TPC(TPX) - tracking MRPC TOF (TOFr) – stop time measurement pVPD/upVPD - start time measurement Particle momentum;
Frank Geurts Rice University.  Time-of-Flight in STAR ◦ start & stop detectors in Run 9  Time-of-Flight Calibration ◦ upVPD ◦ Barrel TOF ◦ preliminary.
1 MTD Readout Electronics J. Schambach University of Texas Hefei, March 2011.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
24-28 May, 2010 S. Mastroianni - 17th Real-Time Conference, Lisboa, Portugal ARGO-YBJ is a cosmic ray air shower detector based on a single layer of RPC.
D. Peterson, “Status of the Cornell/Purdue Program” TPC R&D Mini Workshop, Orsay 12-January Status of the Cornell/Purdue Program: first events with.
Preparation of MTD production Yongjie Sun Center of Particle Physics and Technology University of Science and Technology of China.
MRPC R&D and production Yongjie Sun Center of Particle Physics and Technology, USTC.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
1 TOF Electronics Overview J. Schambach University of Texas DoE Review, BNL, 25 Sep 2006.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Frank Geurts Rice Univ..  Introducing ◦ barrel TOF and upVPD in Run 9  TOF software ◦ past, present, and future  Calibrations ◦ start, stop, and status.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Feb. 23rd, 05, STAR Collaboration Meeting, BNL X.Dong, USTC/LBNL 1 Time-Of-Flight in Data Stream in Run 4 and Run 5 Outline  TOF in Run 4  New design.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
1 MTD Calibration for Cosmic Ray Triggered Data in RUN 10 at STAR Lijuan Ruan (BNL), Liang Li (UT Austin) 04/01/ Workshop on STAR MTD Production.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Nov.14-20, 2006 QM2006 Shanghai J.WU USTC1 A barrel TOF for STAR at RHIC Outline  Introduction  Performance of STAR-TOF prototypes  Physics results:
The Readout Electronics for Upgrading of BESIII End-capTOF Chunyan Yin University of Science and Technology of China University of Science and Technology.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Frank Geurts Rice University.  Time-of-Flight in STAR ◦ start & stop detectors in Run 9  Time-of-Flight Calibration ◦ upVPD ◦ barrel TOF ◦ preliminary.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
PHENIX TOF Upgrade Project Tatsuya Chujo for the PHENIX Collaboration.
April 27-29, Hangzhou1 STAR time-of-flight detector Calibration Ming SHAO USTC.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
STAR-MTD March 30 th -April 1 th, 2011 Wang Yi, Tsinghua University 1 Final design and plan for LMRPC production Outline: LMRPC structure.
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
Performance of Prototype MRPC Detector for STAR Frank Geurts (Rice Univ.) for the STAR TOF collaboration.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
ETD meeting Architecture and costing On behalf of PID group
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Multigap Resistive Plate Chambers (MRPC)
QUARTIC TDC Development at Univ. of Alberta
Conceptual design of TOF and beam test results
10th particle physics conference
Commissioning of the ALICE-PHOS trigger
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

The STAR MRPC TOF Project BNL December 1, 2005 Geary Eppley, with Jo Schambach, for the TOF Group

Design considerations The integration space available for TOF in STAR is that currently occupied by the CTB. The space is about 2.2m from the beam line: requires precision time measurement. The clearance between the TPC and EMC is about 10 cm. The space has a uniform 0.5T magnetic field parallel to the beam. There is limited space for “nearby” electronics outside the magnet steel.

MRPC development Multigap glass RPCs developed in the late 1990s at CERN, C. Williams, et.al. STAR TOF group designed STAR-specific MRPC modules that would fit existing CTB trays and tested them at CERN in 2000 & 2001.

MRPC prototypes in STAR One tray of MRPC modules has been installed in STAR for Runs 3, 4, & 5. An improved tray design each year but some modules have been installed for all 3 years. Runs 3 & 4 used CAMAC electronics. Prototype HPTDC based electronics used in Run 5 NINO/HPTDC based electronics for Run 6/7.

Electronics integral to tray 95% of the electronics resides on the tray inside the cover 4 external electronics boxes located on the magnet steel connect the 23k-channel system to STAR trigger and DAQ

Tray specifications There are 32, 6-channel modules per tray. The active area covers about 87% of -0.9<eta<0.9 Occupancy in central AuAu is ~12%. HV provides +-7 kV. Gas mixture: 95% r134a, 5% isobutane. Average noise rates are ~15 Hz/channel with greater than 100% correlation. Detection efficiency is ~95%.

Time measuring Absolute times are recorded and buffered by the HPTDC for all hits above threshold. A single 40 MHz oscillator provides the clock for the 2882 HPTDCs in the system. Both start and stop detectors use the HPTDC to record times eliminating systematic uncertainty from the choice of counter. Each HPTDC has a 21 bit clock counter providing a 51 us clock period. The HPTDCs are reset by a signal with a common origin at the beginning of each run giving each HPTDC a different phase that may be learned from the data. Since this phase is always the same, the phase becomes a powerful tool to monitor the integrity of the data through buffering, trigger matching, event building, transmission to DAQ, and global event building.

Total time resolution from Run 5: 200GeV CuCu, 105ps 62GeV CuCu, 124ps

Time resolution by channel

Timing results, Runs 3, 4, &5:

Manufacturing overview Module production and test, electronics production and test, and tray assembly and test each have a duration of ~2.2 years. Module production begins ~3 months before the start of tray assembly and electronics production ~1.5 months before the start of tray assembly. Modules are thoroughly tested in China with integral HV wire and signal cables. Electronics cards are tested in groups of 17, 1 tray, with their integral cables and sent to the tray assembly site as a set. Modules are assembled into trays, the electronics added, and tested for 2-4 weeks as a complete detector unit. Tested trays are shipped to BNL as complete detector units ready for insertion into STAR. Trays are re-tested at BNL: HV current, noise rates, gas leak test Test beam at BNL for selected trays?

STAR TOF publications: Physics –Open charm yields in d+Au collisions: STAR Collaboration, Phys.Rev.Lett. 94 (2005) –Cronin effect of identified particle at RHIC: STAR Collaboration, Phys.Lett.B 616 (2005) 8. Technical –B. Bonner et al., Nucl.Instr.Meth.A 478 (2002) 176. –M. Shao et al., Nucl.Instr.Meth.A 492 (2002) 344. –W.J. Llope et al., Nucl.Instr.Meth.A 522 (2004) 252. –F. Geurts et al., Nucl.Instr.Meth.A 533 (2004) 60. –J. Wu et al., Nucl.Instr.Meth.A 538 (2005) 243. –Y. Wang et al., Nucl.Instr.Meth.A 538 (2005) 425. –Y.E. Zhao et al., Nucl.Instr.Meth.A 547 (2005) 334.

TOF electronics schematic

Electronic board status BoardCurrent StatusFuture PlansTimeline TPMTUsed in Run 5Rev design: add discriminators Ready for production by Q4 FY06. TINOPrototype designed and built. Testing with cosmics. Test in test beam.Decision milestone by Q2 FY06. Production by Q4, FY06 TDIGUsed in Run 5.Rev design by Q3 FY06: delete comparators & 1 TDC, add L0-mult. Production by Q4 FY06 TCPUUsed in Run 5Rev design: add TCPU- THUB I/F, delete SIU, TCD I/Fs Production by Q4 FY06 THUBPrototype currently in preliminary design stage Prototype with 3 I/F channels, redesign after bench test Production Q1 FY07

Interface to L0 trigger Provides multiplicity at 9.4 MHz with <~700 ns latency. The multiplicity range is 0-12 for each half-tray, where a bit is added to the sum if any of the 8 TOF channels in a NINO chip is above threshold. The multiplicity sum is formed asynchronously and sent to L0 where it is gated and readout either by the current CDB or by the DSMI directly. The point of this is that the RHIC clock is not used anywhere by the TOF electronics (other than to readout trigger commands). It is not clear that the noise rates will be low enough for the TOF system to be a useful trigger for UPC. If it does work well enough for UPC, it will still take an enormous amount of manpower to calibrate and commission such a trigger. The barrel EMC is already in L0 and has a granularity of 300 compared to 240 for the CTB. It could serve as the complement to the ZDC for centrality triggers.

Interface to L2 trigger The intent is to provide a 23K bit map of the TOF hits to L2 for each “L0 accept” command At the STAR review of TOF in April 2004, the L2 connection was to be implemented by sending this information to the TOF DAQ receiver which would pass the information to L2 over a network connection. This plan has since been dropped by STAR DAQ. The trigger group is now implementing a custom-designed fiber connection (STP) from L0 to L2, and TOF could send its information to L2 over the same type of connection. There is no budget in the TOF project to implement this connection, however, the THUB card has not yet been prototyped and it might be relatively straightforward and low-cost to add the necessary components to THUB for an STP fiber connection

L2, continued. STAR Trigger could use the CERN/ALICE DDL link that will be the fiber interface between all STAR detector subsystems and DAQ in the upgraded STAR detector to receive L2 trigger data from detector subsystems. A similar scheme will be implemented in ALICE and just requires splitting the fiber. The software to receive data using the DDL protocol is already implemented in STAR DAQ and could easily be implemented in trigger as well. The existing trigger STP fiber concentrator is already full just from L0 so a second custom concentrator would need to be installed to accommodate TOF, and any other subsystems.

Interface to DAQ The TOF system needs to be faster than the upgraded TPC so as not to introduce any additional dead time. The TOF information is only useful in a STAR event if the TPC is also readout in that event. The system will handle L0 accept commands at >10 kHz. The system will handle L2 accept commands at >2 kHz. A design issue with a large expense consequence is the required size of the pre-L2 buffer. Or, how many tokens are allowed in the system for events with TPC/TOF readout? The ALICE/CERN ALTRO has buffering for 3 events. Is STAR DAQ planning extra buffer space for TPC events somewhere to allow for asynchronous L2 trigger processing? TOF is currently thinking of allowing for a 256-event buffer and this costs ~$10k for memory. Is there a minimum dead time between L0 accept commands because of TPC readout limitations?

Current project status: The official closeout report from the DOE review of the TOF project in August has been received and all the issues dealt with. A revised management plan has been accepted by the DOE. Cosmic ray testing of the TINO front-end board is ongoing. Automated TINO board production has not been achieved. Trying a new vendor. Upgraded 38-channel start detector under construction. Based on a recommendation from the review, the China TOF project built a few new modules with highly resistive electrodes. Cosmic testing is underway. Layout of the first prototype THUB is underway. Waiting for the DOE go-ahead to start the project.