1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.

Slides:



Advertisements
Similar presentations
Agua Hedionda Watershed Management Plan Copyright © 2005 Kenneth & Gabrielle Adelman. All rights reserved.
Advertisements

Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
Propositions 1E and 84 November 2006 Ballot Southern California Water Dialogue July 26, 2006.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Modeling the Regional Economic and Social Impact of Marine Pollution in Southern California Principal Investigators: Michael Hanemann, Linwood Pendleton,
Meridian Township’s Land Preservation Program Meridian Township Land Preservation Advisory Board.
Don Edwards San Francisco Bay National Wildlife Refuge Where Wildlife Comes First!
U.S. Fish & Wildlife Service CRITICAL HABITAT AND MILITARY LANDS.
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
Restoration and Enhancement Delivery on Private Lands Lessard Outdoor Heritage Council Monday, January 26, 2009 Kevin Lines Board of Water and Soil Resources.
Measure M2 Freeway Environmental Mitigation Program.
Regional View Ballona Creek Watershed December 19, 2003 Area A & part of Area B (192 acres total) purchased for $139 million (Prop 50 funds) Area B.
Elkhorn Slough Tidal Wetland Plan Barb Peichel October 13, 2004 Tidal Wetland Plan Coordinator Elkhorn Slough National Estuarine Research Reserve.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
Habitat Restoration in the Commencement Bay Nearshore & Tidelands Area.
JOINT VENTURES Celebrating 25 Years of Bird Conservation.
1 Preservation Parcels Investigation Report to the Board of County Commissioners September 19, :30 PM.
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
 To conserve our remaining natural resources for future generations  To protect a valuable economic revenue stream  To organize management efforts.
Natural Resource Value of Edison Farms/Agripartners Through Research and Science Presented by: Jessica Stubbs, Natural Resources Specialist.
Ballona Wetlands Restoration Sean Bergquist - Restoration Program Manager photo provided courtesy Jonathan Coffin.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
CONFIDENTIAL Gulf Environmental Benefit Fund July 2015.
Los Angeles District and South Pacific Division CERB June 4, 2009 Technical Tools for Regional Sediment Management Susan Ming – USACE, Los Angeles District.
1 South San Francisco Bay Salt Ponds Long-Term Restoration Planning.
UPPER NEWPORT BAY, CALIFORNIA ECOSYSTEM RESTORATION FEASIBILITY STUDY.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
October 3, 2014 Santa Ana Regional Board Wetlands Restoration Opportunity LOS CERRITOS WETLANDS, ORANGE COUNTY.
1 Preserving Swainson’s Hawk Habitat LAFCO October 5, 2005.
Program Implementation Lower Colorado River Multi-Species Conservation Program.
IRWM Grant Program Scoping Meeting Department of Water Resources January 23, Sacramento January 31, Alhambra.
Kitsap County Department of Community Development Updating Kitsap County’s Shoreline Master Program (SMP) – process overview, public outreach, involvement.
San Francisco Estuary Partnership PCBs in Caulk Project Overview PCBs in Caulk Project Overview October 26, 2010.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Laguna Canyon Creek Protection and Restoration. Major Watercourse Laguna Canyon Creek is a major watercourse. The City identifies it as that and treats.
Prepared for: Prepared by: Identifying and Constructing a Dredged Material Placement Site while Protecting a Unique Coastal Freshwater Marsh October 2012.
Take & Incidental Take Permit Take: means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, collect or attempt to engage in such conduct.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
Copyright © Kenneth Adelman, California Coastal Records Project. Malibu Lagoon Slide 1.
California Department of Fish and Game Conservation and Mitigation Banking Program Update by Cara Roderick Statewide Banking Coordinator 6/29/2010.
Report On The Status Of The Remediation Of The Sonoma County Waste Tire Sites Board Meeting Agenda Item 4 February 18, 2004.
November 12th, 2014 Commission Meeting 1 LCP LOCAL ASSISTANCE GRANT RECOMMENDATIONS (FY ) Miramar Inn, Half Moon Bay| © Jack Sutton.
Hohnloser De novo review of proposed boundary line adjustment at and South Highway One, Gualala, Mendocino County (APN ) Item F12a.
Ecosystem Restoration Program Focused Proposal Solicitation Package 2010/2011 Prepared by ERP Implementing Agencies: California Department of Fish & Game.
Division of Federal Program Activities Sikes Act Coordination Activities Fish and Wildlife Service.
Federal Consistency Certification Sorrento To Miramar Double Track - Phase 1.
Department of Environmental Quality Coastal Habitat Protection Plan (CHPP) 2 Department of Environmental Quality Environmental Management Commission.
October 16, 2013 Mira Monte Marina PERMITTING MITIGATION UPDATE MIRA MONTE MARINA.
Parcel 9U Marina Marsh. Postpone De Novo Hearing Noticing requirements for the de novo hearing were not met as required under CCR §13063 and §13054 –
The Fish and Game Commission has designated the states portion of the South Bay Salt Ponds an Ecological Reserve. Planning for the management of Ecological.
California Department of Fish and Game Inland Desert - Region 6 San Jacinto Wildlife Area A Presentation to the California Fish and Game Commission March.
Canine Commons Dog Park City Council Meeting October 2, 2013 Larkspur Park & Rec Department & Public Works Department.
GALVESTON BAY ESTUARY PROGRAM A CATALYST FOR PARTNERSHIPS AND COLLABORATION Sarah Bernhardt, Ph.D. Lower Rio Grande Valley 18 th Annual Water Quality Management.
2014 POLLUTION RECOVERY FUND GRANTS STATUS EPC Meeting October 16, 2014.
California Energy Commission Redondo Beach Energy Project Biological Resources- PSA Andrea Martine
Ocean Protection Council: Proposition 1 February 3 rd, 2016 Amy Vierra, OPC Deputy Director Nick Sadrpour, OPC Sea Grant Fellow 1 Item 5.
1 Los Angeles County Santa Monica Mountains Local Implementation Plan Malibu Santa Monica Mountains Pepperdine Univ. Topanga County Beach Leo Carrillo.
California Department of Fish and Wildlife Wolf Plan Status DRAFT Gray Wolf Conservation Plan December 2015 Karen Kovacs Wildlife Program Manager Northern.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Chapter 15, Amended Article X Wetland Conservation Areas Presented by the Orange County Environmental Protection Division February 5, 2008 Presented by.
NO NET LOSS of PUBLIC HUNTING LANDS in FLORIDA June 2008 Update.
CONSERVATION AND RESOURSE PROTECTION GRANT PROGRAM NEVADA DIVISION OF STATE LANDS Question 1.
Western Riverside Multiple Species Habitat Conservation Plan California Department of Fish and Game Inland Deserts Region Bobcat photo by Gerald and Buff.
Colorado Lagoon Ecosystem Restoration Project
Carlsbad and Huntington Beach Seawater Desalination Facilities
Presentation transcript:

1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary Restoration Plan May 15, 2010 Agenda Item F5a

2 MLMP Acreage Requirements  MLMP approved in 2008  Requires up to 55.4 acres of estuarine wetland restoration  37 acres in Phase I  Up to 18.4 acres in Phase II  Poseidon voluntarily offered 11 additional acres of mitigation (5.5 acres in each phase)  Total of up to 66.4 acres of wetland restoration now required

3 Only Site Selection and Preliminary Plan are Before the Commission  MLMP Section 2.0 (Site Selection) requires :  “[T]he permittee shall submit the proposed site(s) and preliminary wetland restoration plan to the Commission for its review and approval or disapproval.”  “The basis for the selection shall be an evaluation of the site(s) against the minimum standards and objectives set forth in subsections 3.1 and 3.2 below.”

4 Restoration Plan Development is a Thorough, Multi-Step Process  Evaluation of 11 sites – Completed  Agency consultation – Completed  Required submission of site selection and Preliminary Plan – Completed  Site and Preliminary Plan Approval - Today  Environmental Review of Final Plan - Future  Commission consideration of Final Plan - Future  Will include confirmation that Plan fully satisfies all MLMP requirements

5 MLMP Site Selection Requirements  MLMP required:  Evaluation of 11 sites in the Southern California Bight  Evaluation against minimum standards and objectives  Consideration of input from Commission staff and Commission’s Scientific Advisory Panel

6 Site Selection and Preliminary Plan are Products of Extensive Consultation  Poseidon evaluated sites and developed Preliminary Plan based on extensive consultation with:  U.S. Fish & Wildlife Service (USFWS)  California Department of Fish & Game (CDFG)  San Diego Regional Water Quality Control Board staff  Commission staff and the Commission’s Scientific Advisory Panel  All agencies consulted concur with selection of Otay River Floodplain site

7 Otay River Floodplain Site  Located in San Diego National Wildlife Refuge  Former intertidal mudflats and salt marsh  USFWS manages entire site exclusively for restoration  Poseidon would partner with USFWS to:  Protect, manage, enhance and restore open water coastal wetlands and native upland  Benefit native fish, wildlife and plant species in Refuge  Provide habitat for salt-marsh dependent species

8 Otay River Floodplain Site Location Site is located in the South San Diego Bay Unit of the San Diego National Wildlife Refuge.

9 All Required Sites Were Evaluated  Poseidon evaluated the following 12 potential sites:  Tijuana Estuary in San Diego County  Otay River Floodplain in San Diego County  San Dieguito River Valley in San Diego County  Agua Hedionda Lagoon in San Diego County  San Elijo Lagoon in San Diego County  Buena Vista Lagoon in San Diego County  Huntington Beach Wetland in Orange County  Anaheim Bay in Orange County  Santa Ana River in Orange County  Los Cerritos Wetland in Los Angeles County  Ballona Wetland in Los Angeles County  Ormond Beach in Ventura County

10 How Did Sites Compare?

11 Only Otay River Floodplain Site Ranked “High”  Basis for Otay River Floodplain site ranking:  Restored intertidal mudflats provide breeding habitat for goby species impacted by Carlsbad Project  Provides opportunity for all 66.4 acres at a single site  Approved Comprehensive Conservation Plan (CCP) and Environmental Impact Statement (EIS) provide a framework for how the site should be restored  Site best complies with MLMP’s minimum standards and objectives –Including likely delivering Final Restoration Plan to the Commission within 2 years  USFWS partnership enables long-term protection

12 Other Site Advantages  No hard structures such as jetties are needed  Maintenance dredging would not be required  Buffer requirements can be met  Would restore site where no other funding source exists

13 Conceptual Site Plan 13

14 Otay River Floodplain Site Supporters  USFWS  CDFG  San Diego Regional Water Quality Control Board staff  Commission staff  Commission’s Scientific Advisory Panel  Coastal Conservancy

15 Additional Slides

16 USFWS Support  “Our collaboration with Poseidon Resources will allow the restoration and monitoring of significant salt marsh and estuarine habitats in a timely and efficient manner without the expenditure of public funding. We continue to strongly support this project...”  (Sept. 28, 2010 Letter to Commission staff)

17 CDFG Support  “The Department concurs that South San Diego Bay NWR is an important project location and mitigation would be valuable there... We look forward to the opportunity to assist Poseidon in optimizing its mitigation strategy for the proposed desalination plant.”  (Mar. 18, 2010 Letter to Commission staff)

18 Regional Board Staff Support  “On July 29, 2010, Poseidon submitted a proposed mitigation site at the Otay River Floodplain... We will be recommending approval of the proposed mitigation site.”  (Sept. 21, 2010 Letter to Commission staff)

19 Commission Staff Support  “[T]he Otay River Floodplain site has the greatest likelihood of meeting the requirements and objectives of the MLMP.”  “The site contains enough area to meet the acreage requirements in the MLMP, including space for transition and buffer areas.”  (Sept. 22, 2010 Staff Report)

20 South Bay Power Plant Location South Bay Power Plant South Bay Power Plant Location

21 Request  Poseidon concurs with Commission staff’s recommendation  Poseidon requests that the Commission:  Approve the proposed Otay River Floodplain site and Preliminary Restoration Plan under the MLMP for both Phase I and Phase II restoration obligations