Weaver Mountain Fuels Treatment Project BLM Phoenix Field Office 21605 N. 7 th Ave Phoenix, AZ.

Slides:



Advertisements
Similar presentations
Project Introduction Consists of 9,040 acres of deeded land and 52,000+ acres of state and federal lands. Encompasses 16.6 miles of the South Fork and.
Advertisements

Perform Range Forage Inventory for Large Ungulates Confederated Tribes of the Colville Reservation, Cooperative Fish & Wildlife Dept. and Range Dept. Project.
Lion Wildland Fire Background The Lion Fire was ignited by lightning on July 8, 2011 in the Golden Trout Wilderness on the Western Divide Ranger District,
080820_v1DP TRAVEL MANAGEMENT - PROCESS ON THE GILA NATIONAL FOREST.
BLM Plant Conservation Program: Its Role in Sage Grouse Conservation
HUD Environmental Review Requirements November 30,2010.
1 Washington Invasive Species Council Recreation and Conservation Office Purple Loosestrife.
Careers in Wildlife Management WORKING ON THE WILD SIDE.
HCP Implementation in Pima County, Arizona Julia Fonseca Pima County Office of Sustainability and Conservation Photo by Aaron Flesch.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
2013 TN Prescribed Fire Survey 11 State & Federal Agencies - 18 separate work units or grouped areas 2 Conservation Organizations 5 Private Burn Vendors.
Regional mitigation sites for three Arizona solar energy zones: The Nature Conservancy nominations Dale Turner Marcos Robles The Nature Conservancy in.
Bureau of Land Management NAIP Information Meeting July 19 th, 2006.
FIVE CREEKS RANGELAND RESTORATION PROJECT FALL 2008 Burns District, BLM.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
BLM Lower Sonoran Field Office Arizona. BLM Lower Sonoran Field Office Arizona.
SOUTH COAST RESOURCE MANAGEMENT PLAN REVISION BUREAU OF LAND MANAGEMENT Palm Springs-South Coast Field Office California Desert District.
Chapter 15 1 CHAPTER 15 – EMERGENCY RESPONSE PLAN CEE 698 – Construction Health and Safety.
POWER & PROTECTION ELECTRICITY, ENVIRONMENT, SITING.
Environmental Impact Assessment Review Process for Oil and Gas Projects In Saskatchewan Larry Lechner, P. Eng. Director Environmental Assessment Branch.
THE U.S. FOREST SERVICE AND FORESTRY IN THE UNITED STATES International Visitor Program Orientation.
Wildland Fire: A Natural Process Wildland Fire Education Working Team.
Sacred Sites. Documentation Documentation: Forest Supervisor or Ranger District Offices may document Sacred site (s) information in a variety of ways.
Nutrient Management Planning Canada-Manitoba Farm Stewardship Program Steve Sager, P.Ag. Soil Resource Specialist Agriculture and Agri-Food Canada-PFRA.
Invasive Species Chapter 4 Module 5 1. Invasive Species What are they? 1) non-native (or alien) to the ecosystem under consideration and 2) whose introduction.
A Campaign for Forest Management. FUEL FOR THOUGHT Forest Density has Increased 30% Since 1953 Forest Mortality at a 50 Year High 73.5% of NFS Lands Need.
Ian McBride Earth and Physical Science Department Western Oregon University Monmouth, Oregon
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
T&E Species, Special Sites and HCVF! Sarah Crow ATFS Webinar Series May 16, 2013.
The Rain Saved Us – Examining Drought Impacts Yesterday and Today Grade class sessions.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Cheatgrass Management Plan for NM. MANAGEMENT PLAN OUTLINE INTRODUCTION MISSION STATEMENT – GOAL SCOPE OF THE CHEATGRASS PROBLEM POLICY AND DIRECTION.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Sears Point ACEC: SEZ Regional Mitigation Site Thomas Jones Asst. Field Manager Bureau of Land Management Yuma Field Office November 14, 2014.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Involvement in SW Jemez Mountains Landscape Restoration Project (SWJMLRP), under CFLRP March 12, 2015 PUEBLO OF JEMEZ.
Considering Vulnerability and Adaptive Capacity in fire-prone communities along Colorado’s Front Range Hannah Brenkert-Smith University of Colorado November.
Wildland Fire Management Policy Procedures, Perspectives, and Implications.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Resource Management Plan (RMP) Revision for the Las Vegas and Pahrump Field Offices Muddy Mountains.
Transmission Siting Considerations, Best Practices, and Lessons Learned Gary Graham, Ph.D. Transmission Project Director.
Phase 3 Environmental Documentation Process SEQUOIA NATIONAL FOREST AND GIANT SEQUOIA NATIONAL MONUMENT.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
PLANNING FOR SUPPRESSION REPAIR How to estimate the amount of Suppression Repair work and design your strategy to complete it.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Treatments and methods to manipulate stand structure suitable for fuel reduction.
A Fire Managers Approach to Invasive Species Cooperate Coordinate Collaborate.
Utah’s Watershed Restoration Initiative Mule Deer.
Erv Gasser Natural Resource Specialist nps Baer Field Manager National Interagency BAER Team Leader - North team National Park Service, Seattle, Wa BAER.
BUREAU OF LAND MANAGEMENT RESOURCE ADVISOR TRAINING / REFRESHER May 1, 2014.
Smoke Education Communication Strategy 2007 Key Messages.
Effects Analysis and Comparison. Objectives Accurately determine which impacts need to be evaluated in the land use plan. Develop a matrix comparing the.
Federal Wildland Fire Policy Prescribed Natural Fire Yellowstone South Canyon Federal Fire Policy Review PNF Escapes.
National Forest System Grazing Objectives 1.Manage range vegetation to protect basic soil and water resources, provide for ecological diversity, improve.
New Millenium Wildfires: Paradigm Shifts for the 21 st Century: Assessing the Home Ignition Zone February 13, 2013 Austin, Texas Hank Blackwell Wildfire.
MODULE 2 READNESS. OBJECTIVES Prioritize personal values and describe their relationship to incident management and firefighter safety Company Officer’s.
United States Department of Interior Bureau of Land Management Winnemucca District Draft Resource Management Plan and Draft Environmental Impact Statement.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
Introduction to BMPs U.S. Department of the Interior Bureau of Land Management May 2006.
DOE IMPLEMENTATION WORKSHOP FIRE MANAGEMENT LEE BANICKI (202)
Guidelines for use This presentation was created by staff of The Nature Conservancy's Wildland Invasive Species Team. It describes many of the consequences.
Draft Supplemental Environmental Impact Statement for the Upper Las Vegas Wash Conservation Transfer Area Nevada BLM Southern Nevada District Office.
POLICY, PLANNING, & MANAGEMENT OBJECTIVES S-244 Field Observer & Fire Effects Monitor Goals Objectives Monitoring.
Restoration Under a Future Climate Understanding and managing climate change effects on federal lands Dr. Cynthia West, Director Office of Sustainability.
Invasive Species National Assessment
Community Shaded Fuel Break Project
FIRES IN RIPARIAN AREAS AND WETLANDS
Landscape Approach to Resource Management
Presentation transcript:

Weaver Mountain Fuels Treatment Project BLM Phoenix Field Office N. 7 th Ave Phoenix, AZ

Northern portion of project area (looking toward Round Mountain)

Northwestern portion of project area

Western portion of project area (dense interior chaparral vegetation)

Wild Horse Mesa (looking northwest)

Central portion of project area (looking toward Round Mountain)

Central portion of project area (looking west)

Central portion of project area

Arizona cypress

Arizona cypress along drainage

Wild Horse Mesa (looking northwest)

Riparian zone

Photo point

ISSUES AND CONCERNS IDENTIFIED FOR SCOPING To protect the desert tortoise habitat. Adverse impact(s) to T&E and other special status species. Big game habitat destroyed by catastrophic wildland fire. Functional damage to range improvement and facilities. Damage public and private improvements. Public safety during project burning. Impacts to local air quality. Introduction or spread of noxious and invasive weed species. Burns conducted within the drainages. Impacts to the wilderness in the case of an escape.

OPPORTUNITIES IDENTIFIED FOR SCOPING Improve big game habitat and ecosystem health. Reduce fire suppression costs, property loss, and environmental damage. Improve firefighter and public safety. Proper placement of firelines and no direct ignitions in riparian areas. During treatment, allow no-non fire personnel in treatment area. Coordinated/communicate to reduce conflict. –Adjust livestock grazing practices. Conduct special status surveys and heritage resource surveys. –Coordination between the BLM and other federal and state agencies. –Identify mitigation or monitoring. Modified ignition patterns to avoid Tortoise habitat. Consultation with BLM staff specialist(s) for burn plan development. –Precautions for protecting cultural sites and address resource concerns. Coordination between internal specialists prior to and post treatments.

ISSUES AND CONCERNS IDENTIFIED AFTER SCOPING Tribal: Proper clearances are conducted. Proper plant protection. Identification and protection of ancestral sites. Full communication and written reports/correspondence shared. Other: Protection for special species, species of concern and sensitive. Protection of resources prior to re-introduction of grazing privileges. Protection of riparian habitat areas. Protection of identified plant and animal species for tribal use.

OUT COME FROM PUBLIC SCOPING A Public Scoping Invitation was mailed on November 9, 2002, to 530 interested parties, identified on the National Mailing List for the Bradshaw Planning Project effort. Over ninety (90) letters were returned “undeliverable”, and six interested parties responded with endorsement and concerns. There were no additional/new issues or comments identified in the 30 day period. Alternative(s) will be developed to address identified issues and concerns.

Photo point

ORGANIZATIONAL CHART

THE END THANK YOU FOR YOUR INTEREST IN OUR PROJECT THE PFO FUELS STAFF