 Derek Blash  Team Leader  Faculty Liason  Sarah Hoefker  Secretary  Kyle Latz  Finance Officer  Client Liason.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

Top of Car Load Assisting Bike Lift.  Summary & Objectives  Mission Statement  Key Product Design Specifications  Top Level Design Options  Final.
Finite Element Analysis and Testing Correlation of the Mercury Laser Altimeter Craig L. Stevens Mechanical Systems Analysis & Simulation.
Case-New Holland Steer-by-Wire Detailed Design. Today’s Agenda  Who is CNH?  Background  Project Goal  System Level Concept  Design Components 
ELM: ESPA Launch Load Module Department of Mechanical & Industrial Engineering Northeastern University Boston, MA April 17, 2007 Ben Kneppers, Matthew.
HFT PIXEL Mechanical Progress Strasbourg June-2009 Wieman 1.
Team Members Duc Le Ron Pahle Thanh Nguyen Khoa Tran Sponsor Edwards Vacuum Ltd. Advisor Dr. Dave Turcic.
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) SAE AERO Chase Beatty.
May, 2004S. Irish/542 FEMCI Poster Development of Cryogenic Accelerometers for 4K Principal Investigators: Petar Arsenovic/551, S. Irish/542, Brian Ross/549.
R·I·T Kate Gleason College of Engineering Design of a Tensile Load Frame for a Scanning Electron Microscope Senior Design Project Project Manager.
Liquefied Natural Gas Fuel tank
P11213: Modular Student Attachment to the Land Vehicle for Education Jared Wolff, Andrew Komendat, Oyetunde Jolaoye, Dylan Rider.
AAE450 Spring 2009 Mass Savings and Finite Element Analysis (FEA) Preparation for Orbital Transfer Vehicle (OTV) 100 gram Case Tim Rebold STRC [Tim Rebold]
ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.
Team Xerox Progress Report Mechanical Engineering Design Team Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt.
ME 491 Mini Competition Solar Water Irrigation Project Rev D 10/9/2008.
Team K-TRON Team Members: Ryan Vroom Geoff Cunningham Trevor McClenathan Brendan Tighe.
Polaris 6x6 UTV Instructions for Fuel Tank Vent Tube Modification 2005 – 2009 models For further information contact: Michelle Ryerson or Carl Dorsey,
Bamboo Bike Capstone Team Members Camrun Arkills Kyle Heitmeyer Fay Gibson Matt Brown Faculty Advisor Hormoz Zareh, PhD Associate Professor of Mechanical.
ITW Structural and Strength of Materials Teaching Laboratory Civil & Materials Engineering UIC November 2009.
NASA moon buggy project
General Motors Tutor Presentation : Peter Foss Project Supervisor : Professor Ahmad Barari Faculty of Engineering & Applied Science University of Ontario.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
Physics 145 Introduction to Experimental Physics I Instructor: Karine Chesnel Office: N319 ESC Tel: Office hours: on appointment.
World’s Tallest Tower Case Study #1 Northern Highlands Regional High School Applied Technology Department Real World Engineering List Design/Build Engineering.
LaRC Test Cases for Modeling and Validation of Structures with Piezoelectric Actuators Mercedes C. Reaves and Lucas G. Horta Structural Dynamics Branch.
C osmic R Ay T elescope for the E ffects of R adiation Telescope Mechanical Design Albert Lin The Aerospace Corporation Mechanical Engineer (310)
Eglin 1 Design of Acoustic Sensor Eye Housing Eglin 1 Design of Acoustic Sensor Eye Housing Group Members: Erik Fernandez Kevin Garvey William Heffner.
Braking System for a Hospital Bed Approach Calculations Design Team Nicholas Beechnau Aaron Cole Nicholas Nwabueze Matthew Hays Brainstorming sessions.
SAE AERO Chase Beatty (Team Leader) Brian Martinez (Organizer) Mohammed Ramadan (Financial Officer) Noe Caro (Historian) Chase Beatty.
LASER AND ADVANCES IN METROLOGY
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
Design of a Wheelchair-Mounted Transfer Assist Device University of Pittsburgh Senior Design – BioE 1160/1161 Michael Anderson Andrew Feola Jill Marion.
Mechanical Testing of Flag Joint Assembly. TF Flag Assembly to be Tested.
TEAM 14 John Armitage Douglas DeVoto Brian Polkowski Marykate Wioncek SOUTHCO Vibration Fatigue Tester.
Automated Geometric Centroiding System Matthew Shanker, Eric Harris, David McArthur; Faculty Mentor: Dr. James Palmer; Client: Jim Clark Department of.
AAE450 Spring 2009 Finite Element Analysis (FEA) for Orbital Transfer Vehicle (OTV) Tim Rebold STRC [Tim Rebold] [STRC] [1]
Design of a Lightweight Mounted Tip/Tilt Mirror
Reusable Stacked Design V. 4 Problem Background Tom Amundson, Drew Hanken, Laura Limon & Jacob Pinello Solution Modeling and Simulation Research Testing.
EPT 221 PARAMETRIC DESIGN. Objectives of Lecture Describe the parametric design phase. Describe and apply the steps involve in the parametric design phase.
Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.
P15741: Air Table Mover Photo: Newport.com. Team Members Cameron Young – Team Leader Daniel Miller – Lead Mechanical Engineer Nicholas LeBerth – Edge.
Bi-Directional RF Data Communication A Robot Control Device.
P16453 Problem Definition Review Kris Kidder | John Dolan | Shay Stanistreet | Anthony Miuccio.
High Speed Vessel Fendering System Design Presenters: Cameron Clark Dave Maharaj Okason Morrison Jean-Pierre Njante Alexandra Ortiz Advisor: Prof. Sadegh.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
High Powered Rocket Team Fall Project Manager Wesley M. Harpster Team Members James Lawrence Ryan Horton Karna Shah James “Trey” Simmons Irfan Shaukat.
Aircraft Carrier Draft Measurement Ship Draft Team - Fall 2015.
P – , TOW TANK FOR TETHERED HYDROFOIL TEAM MEMBERS: Hope Alm (ME)Tim Buckner (ME) William Lentlie (ME) Andres Santizo Matheu (ISE) Shauna.
Customer Needs Increase Productivity Safety of Machine Minimize Physical Exertion Reduce Downtime Complete through cut of straws on first actuation with.
Finite-Element Analysis
P14471 Vibration Testing Application. Team Introductions NameRoleMajor Brett BillingsTeam LeaderIndustrial Engineer Nick GrecoLead EngineerMechanical.
Composite Joining Techniques: Bolted Joints LBNL Composites Workshop February 29-March 3, 2016.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
14-Jun-161 Status of Horizontal Test Stand (HTS-2) Development Efforts Pradeep Kush, Prashant Khare, RRCAT, India Team Members: S.Gilankar, Rupul Ghosh,
Turbo Installation Manipulator Final Design Review
Telescope - Mechanical
LARP Phase II Secondary Collimator RC1
Composite Mirror Applications, Inc
Load Balancing: List Scheduling
Equilibrate System upgrade
Duct Insulation Attachment Team
Team Members: Sagar Sheth Team Leader Leonardo Silva Industrial Eng.
Active Reciprocating Compressor Valve Assembly P16452
Designing and Manufacturing of a hand operated plastic injection moulding machine envisioned for the mesoscale range. Freddy Travieso
The First Free-Vibration Mode of a Heat Exchanger Lid
PIPE TESTING
Individual Nameplate Inspector
Load Balancing: List Scheduling
Presentation transcript:

 Derek Blash  Team Leader  Faculty Liason  Sarah Hoefker  Secretary  Kyle Latz  Finance Officer  Client Liason

Navy Prototype Optical Interferometer (NPOI) Naval Research Lab  James H. Clark, III  Started in 1990  Optomechanical Lead Designer Naval Research Lab/Lowell Observatory  Joel Dugdale  NPOI Mechanical Engineer Academic Advisor  Dr. Ernesto Penado  Chair of Mechanical Engineering

 Placed between siderostat mirror and vacuum tube  Compresses the 14in beam to 5in beam  More photons per square inch

 Beam compressor begins to vibrate at a low frequency which disturbs the beam of starlight  Verify finite element analysis (FEA) presented in client/advisor’s paper  Project Goal: To design and modify the current beam compressor to increase its fundamental frequency and reduce the amplitude of the vibrations increasing visibility from 7,000 to 70,000 stars.

Weight Limit (Beam Compressor) Must not exceed 258 pounds (or 10%) Materials Aluminum 6061 thin walled tubing Material dimensions 1 inch diameter with.0625 inch wall thickness Budget$300 Mounts4 FrequencyWithin 30% of desired 128 Hz

 “Stiffening an off-axis beam compressor mount for improved performance” published by Ernesto Penado, James H. Clark, III, and Frank Cornelius  ISOTRON accelerometers  Endevco website  National Instruments  LabView manual  Mechanical Vibrations by S.S. Rao

Allocated Budget: $300 MaterialPricePurchased From Aluminum Tubing$104Industrial Metal Supply Hardware$7Copper State Nut & Bolt Computer Costs$75Data Doctors Poster Mounting$60Michael’s Total Cost$246

 Phase 1: Research (9/27/ /25/2010)  Phase 2: Design and Manufacture Support Modifications (10/11/ /1/2010)  Phase 3: Testing for Max Displacements of Beam Compressor (3/1/2011 – 3/19/2011)  Phase 4: Data Reduction (3/19/2011 – 4/1/2011)  Phase 5: Prep for possible Optics Lab testing (4/22/2011-5/8/2011)  Total Hours: 240 hours (Jan-April 2011)

 Memo showing final prototype for structural members (2/17/2011)  Memo describing our testing results (4/1/2011)  Reports with Tables and Graphs Comparing Actual Data to Predicted Data (4/17/2011)  Final Presentation/Poster (4/29/2011)  Final Capstone Paper (5/6/2011)

 Prototype 1: Machined joint/end attachment

 Prototype 2: NASA joint

 Prototype 3: Crimped tubing (Rounded edges)  *Desired by Client*  Cracked: Unable to use

 Prototype 4: Plugged ends to prevent crushing  Open source loading

 Tested max displacement points  Tested other points  LabVIEW VI (virtual instrument)

Test CasesFrequency (Hz) FEA Actual Difference% Error > Frequencies (Hz) Test CasesFEAActualDifference% Error

 Original Frequency: 13.3 Hz  Final Frequency: 97.3 Hz

 Final Weight: lbs (<10%)  Test Results within 30%  4 points of contact  Recommendations