QMWG Update to WMS S. Looney February 5, 2014. NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –

Slides:



Advertisements
Similar presentations
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Advertisements

Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
February 25, 2011 Demand Side Working Group EILS Update Mark Patterson ERCOT, Manager Demand Integration.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
July QMWG Update (WMS). GREDP Discussion GREDP is currently used as a compliance tool ERCOT is considering now just using it as an investigative tool.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 Market Trials Update NATF June 1, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 NPRR to Clarify RUC Capacity Shortfall Ratio Share Formula.
Protocol Revision Subcommittee Sandy Morris December 1, 2011.
March 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 1, 2014 TAC Update to RMS 1.
October Project Release (NPRRs 710, 706, 698 and 595) ERCOT Operations & Market Operations WebEx Training October XX, 2015.
October 02, 2009 Austin, Texas Quick Start Task Force Meeting 1.
Project Funding Report November 1, Business Integration Update – Agenda –Project Portfolio Updatep Revision Request Funding Reconciliation.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
1 Business Integration Update to PRS Troy Anderson ERCOT Enterprise Project Portfolio Management May 19, 2011.
MISUG TAC Update Jackie Ashbaugh ERCOT 4/7/ TAC4/7/ /31/2011 Meeting Continued to focus on the high priority items from MISUG task list:
Technical Advisory Committee (TAC) update to RMS Kathy Scott January 3, 2013Technical Advisory Committee 1.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
TAC Update April 7, Update Nodal Protocol Revision Requests (NPRRs) (Vote): –NPRR306, Revisions to Protected Information to Include Black Start.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
Protocol Revision Subcommittee Tom Burke January 3, 2013.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
ERCOT Market Design & Operations
RTDF Overview of Data Analysis & Status of “Consesus Items”
Presentation transcript:

QMWG Update to WMS S. Looney February 5, 2014

NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market – Same timeline for failure to provide, additional AS or undeliverability – Added the change to reconfiguration SASM settlement so that MCPC is not the maximum cleared for that hour – Removed the requirement for ERCOT to issue a Watch for insufficient offers in the SASM – Need WMS approval to submit comments on behalf of QMWG

NPRRs Referred by WMS NPRR585, Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines on a Resource Committed by RUC – ERCOT clarified that when a CC configuration is RUC’d another GT could be started and the revenue from the new configuration contributes to the RUC guarantee. Also has clawback. – Probably still need this NPRR to clarify what is to be done with the EOC. – Request clarifying comments be submitted by ERCOT

NPRRs Referred by WMS NPRR576, Changing Non-Spin Service to an Off-Line Service Discussed the reliability value of Non-Spin. ERCOT needs the reserves. Needs the operational awareness of when reserves are deployed by SCED. Either the Online NS need to be behind the HASL or need price floors. Price floors solve the issues of operational awareness and price reversal. The NPRR sponsor considering submittal of comments reinstating price floors.

NPRRs Referred by WMS NPRR574, Removal of Offer Curve Flexibility for DAM-Committed Resources – ERCOT staff has planned a meeting with PUCT staff to discuss. – No action/recommendation from QMWG at this time

General Update NDCRC Upgrade – Still on track for April release Generation Commissioning Check List and Resource Interconnection Handbook – ERCOT has provided a mark up and will schedule a Webex before the end of the month to discuss the changes. Other considerations for RUC/ONOPTOUT – System change to EOC automatic for RUC – System change to allow COP change when RUC VDI after end of Adjustment Period