US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.

Slides:



Advertisements
Similar presentations
MOBILE DISTRICT FY 2007 DREDGING PROGRAM MOBILE DISTRICT FY 2007 DREDGING PROGRAM US Army Corps of Engineers Mobile District US Army Corps of Engineers.
Advertisements

DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
US Army Corps of Engineers Portland District West Coast Regional Hopper Contract.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
Civil Works Baltimore District River and Harbor Projects.
JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE JACKSONVILLE DISTRICT FY08 DREDGING SCHEDULE NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD REGIONAL DREDGING.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Presentation to the: Governor’s Advisory Commission Chris Accardo Chief, Operations Division.
Q AVG US Army Corps of Engineers BUILDING STRONG ® Q AVG US Army Corps of Engineers BUILDING STRONG ® USACE Regional Sediment Management Program Linda.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
US Army Corps of Engineers BUILDING STRONG ® HYDROGRAPHIC SERVICES REVIEW PANEL Stakeholder Panel: Alaska Regional Needs for NOAA’s Navigation Services.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
US Army Corps of Engineers BUILDING STRONG ® Charleston District Charleston Harbor Post 45 Deepening Feasibility Study Barbara Melvin Senior Vice President.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
Period 3 Kiana Brayton Lyle Swallows
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
NAD/SAD REGIONAL DREDGING MEETING/WEDA Jacksonville Harbor and Other Developments U. S. ARMY CORPS OF ENGINEERS COASTAL NAVIGATION BRANCH 10 October 2007.
Dredging Engineering: Building & Maintaining Underwater Highways
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
US Army Corps of Engineers BUILDING STRONG ® CORPS OF ENGINEERS NAVIGATION PROGRAM David Martinson Alaska District Corps of Engineers Elmendorf.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Building Strong! May Deep Draft Navigation Cost Sharing Jeremy LaDart Office of Water Project Review HQUSACE.
Modeling in the USACE US Army Corps of Engineers BUILDING STRONG ® Bruce Ebersole U. S. Army Engineer Research and Development Center Coastal & Hydraulics.
Building Strong! May Deep Draft Navigation Module 2011 Planning Associates Class Jeremy LaDart Office of Water Project Review HQUSACE Mission Overview.
OP-Navigation.ppt1 U.S Army Corps of Engineers Savannah District.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
Pacific County, Washington a a Area of Significant Tsunami Exposure Pacific Ocean Willapa Bay 18 Mile Exposure to the Columbia River 975 Square Miles –
Port of Long Beach 76 Foot Main Channel Dredging Project Doug Thiessen, Port of Long Beach (POLB),Al Moro, Chief Harbor Engineer, POLB Emily Ueda, Program.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Pacific County, Washington a Area of Significant Tsunami Exposure Pacific Ocean Willapa Bay 18 Mile Exposure to the Columbia River 975 Square Miles – Pop:
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Department of Army Permitting Process: Dredging
Engineering Surveys & KGPS. Outline Problem Example Applications / uses of KGPS Project Example.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
US Army Corps of Engineers BUILDING STRONG ® Intracoastal Waterway Setback Guidance Shelley Trulock Project Manager, Programs & Project Management Division.
CDP Morehart 2808 Lafayette Avenue Newport Beach.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
Harbor Resources Manager’s Report February 10, 2010.
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Ecology and environment, inc. ecology and environment, inc. International Specialists in the Environment Georganna B. Collins, International.
Dredging & Other Issues Newport Beach City Council
Galveston Bay Bottom Ecosystem System Features
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
R. E. Randall Center for Dredging Studies
Aiding Navigation through Centralizing Information Dissemination
Options for Improved Boater Access to the Jacksonville Zoo & Gardens Presented to the Jacksonville Waterways Commission October 11, 2017.
Application Focus Area (AFA) 1: Discovering breakthrough science
Galveston Bay Bottom Ecosystem System Features
Beneficial Use of Dredged Material
Breaches.
Southern Maine Dredge Purchase Feasibility Study
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
INTRODUCTION TO PORT DESIGN
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram Arden Operations Division, Navigation Section Seattle District November 2009

BUILDING STRONG ®

NAVIGATION PROGRAM Channel & Harbors - 23 active  8 high use harbors (over 1 million tons commercial cargo)  15 low use harbors  15 deep draft channels (14 ft+ depth) Toke Point Marina  7 shallow draft channels  2 without channel maintenance (breakwater & revetment)  Conduct hydrographic surveys  Navigation hazard removal.

BUILDING STRONG ® Willapa Harbor Navigation Project Features:  Ocean bar channel  Deep draft river channel to Raymond  Toke Point Marina  Bay Center Channel & Marina  Nahcotta Marina Toke Pt.

BUILDING STRONG ® TOKE POINT AT WILLAPA BAY, WASHINGTON Photo Courtesy Port of Willapa Harbor Photo by Merrill Photography

BUILDING STRONG ® Aerial view of Toke Point Marina & Entrance

BUILDING STRONG ® 2006 Pacific / Wahkiakum Southwest Washington Port Cooperative :  Port of Willapa Harbor  Port of Chinook  Port of Peninsula  Port of Ilwaco  Port of Wahkiakum #1  Port of Wahkiakum #2

BUILDING STRONG ® Chronology of Toke Point federal entrance dredging  1958 New Const. 184,000 cy Pipeline w/upland disposal  1964 O&M 12,000 cy Pipeline w/ upland disposal  1970 O&M 16,500 cy Pipeline w/upland disposal  1974 O&M 14,000 cy Pipeline w/upland disposal  1987 O&M 27,800 cy Clamshell w/openwater disposal  1991 O&M 27,100 cy Clamshell w/openwater disposal  1998 O&M 27,650 cy Clamshell w/openwater disposal  2009 O&M 20,000 cy Pipeline with flowlane & beneficial use disposal (Underway & funded by Port of Willapa Harbor)  2012 O&M 15,000 cy  2015 O&M 15,000 cy  2019 O&M 15,000 cy

BUILDING STRONG ® Corps & Port Partnership Effort  Corps & Port conduct joint sediment sampling & analysis that confirms sediments suitable for unconfined disposal or beneficial use.  Corps & Port coordinate required permit approvals to conduct O&M dredging for whoever gets funds first?  Stakeholder collaboration nets proposal for pipeline dredging with flowlane & beneficial use disposal.  Corps & Port Strategy “Get Dredge Ready”

BUILDING STRONG ®  Corps Federal Entrance Public Notice #CENWS-OD-TS-NS-28  Port of Willapa Harbor Individual Permit Application Public Notice No. NWS SO JOINT PORT/ CORPS PUBLIC NOTICE August 11, 2008

BUILDING STRONG ®  Federal Entrance 100 ft wide, 700 ft long to -17 ft mllw  Port Moorage area depths vary from -13 ft to -19ft mllw. August 11, 2008 JOINT PORT / CORPS PUBLIC NOTICE

BUILDING STRONG ® Port of Willapa Harbor / Corps JARPA Application August 11, 2008  Flowlane disposal of silty materials in “deep hole “, thalweg.  Beneficial use placement of sandy entrance materials for beach nourishment on Port property.

BUILDING STRONG ® Commercial Fishing Vessel Moored at Toke Point

BUILDING STRONG ® Commercial fishing vessel moored at Toke Point

BUILDING STRONG ® Ellicott Dredges Model 370 Cutterhead 10-inch pipeline dredge delivered to Port of Willapa dock in Raymond, WA September 2009

BUILDING STRONG ® Port of Willapa Harbor’ dredge at work Dredge Window 1 October - 31 March

BUILDING STRONG ® Float marking 12-inch HDPE Discharge Line

BUILDING STRONG ® Commercial Fishing Vessel Moored at Toke Point Dredge discharge diffuser float for flowlane disposal

BUILDING STRONG ® Tokeland Dredging Celebration October 16, 2009

BUILDING STRONG ® Commercial Fishing Vessel Moored at Toke Point Flowlane Disposal ‘‘Deep Hole” bathymetric survey 28 Oct 2009