F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.

Slides:



Advertisements
Similar presentations
1 Coherent Synchro-Betatron Resonance in the FNAL Booster A. Burov, V. Lebedev HB 2008.
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Development of a Chromaticity measurement application using Head-Tail phase shift technique.
E-Cloud Effects in the Proposed CERN PS2 Synchrotron M. Venturini, M. Furman, and J-L Vay (LBNL) ECLOUD10 Workshshop, Oct Cornell University Work.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
ALPHA Storage Ring Indiana University Xiaoying Pang.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
1 NuMI BEAM POSITION MONITOR via MAIN INJECTOR, and RECYCLER Brajesh Choudhary, 06.Mar.2003 MINOS Collaboration Meeting University of South Carolina, Columbia.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Figure 2 gives an overview of the hardware components of the upgraded Main Injector BPM system. The figure shows 2 signal channels which produce one position.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
3/14/2007AD/Instrumentation Department Jim Zagel 1 MFW Update 3/14/07 Latest problems RFT Looses Phase Lock –Real 53 MHz connected to the RFT at MI-10.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
F Fermilab July 6, 2005Recycler Damper Stability1 Recycler Damper High Frequency Stability Jim Crisp
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
BIC Issues Alan Fisher PEP-II Run-4 Post-Mortem Workshop 2004 August 4–5.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
TeV BPM Review 12/16/2003 Summary Status, Motivation, and Directions.
Specifications of Tevatron BPM Upgrade Jim Steimel.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.
Sub-Bunch Beam Position Measurements James Miller-Marquez Mentor: Vic Scarpine
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
8/10/04N. Michelotti1 Study of Main Injector BLT.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
A Survey of TBT Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Tevatron Department Meeting February 18, 2005 Beams-doc-1583-v2.
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
14-Oct-02MI/RR Dampers - G. W. Foster Beam Dampers for Main Injector and Recycler Bill Ashmanskas, Bill Foster, Dave Wildman Warren Schappert, Jim Crisp,
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Limits on damping times
LHC (SSC) Byung Yunn CASA.
Presentation transcript:

f Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002

f October 28-31, 2002DoE Review - Instrumentation - BLT2 Introduction Primary function of a Beam Line Tuner (BLT) is to measure turn-by-turn transverse beam positions during transfers between machines at injection to improve closing –Required in Tevatron, Main injector and Recycler –Can measure betatron oscillations, fractional tune, coupling, phase, synchrotron oscillations, chromaticities, etc Focus has been on betatron measurements for improved closing –Feed-forward correction system BLT is a key component for reducing transverse emittances and increase luminosity

f October 28-31, 2002DoE Review - Instrumentation - BLT3 Basic BLT System

f October 28-31, 2002DoE Review - Instrumentation - BLT4 Striplines and Fanout TeV Stripline Parameters: –~ 30 dB directionality –1 meter long (< 1/4 ) –D = 83 mm –0.65 dB/mm Sensitivity MI and Recycler Stripline Parameters: –Unidirectional – 1.4 meter long (1/4 ) –D = 110 mm –0.50 dB/mm Sensitivity

f October 28-31, 2002DoE Review - Instrumentation - BLT5 Operational Systems

f October 28-31, 2002DoE Review - Instrumentation - BLT6 Tevatron BLT For transfers from Main Injector to Tevatron Requirements (in order of importance – V. Lebedev) : 1.Measure initial injection oscillations for every proton and pbar bunch –first 50 turns with <50  m resolution 2.Measure tunes, coupling and chromaticities for every bunch –> ~1000 turns 3.Monitor beam position before quench –~ last 500 turns saving beam waveforms Beam formats: –Pbar: Four 53 MHz bunches separated by 392 ns at 150 GeV –Protons: Single 53 MHz bunch at 150 GeV

f October 28-31, 2002DoE Review - Instrumentation - BLT7 Tevatron Scope BLT In Operations Use Tektronix TDS7104 as fast waveform digitizer –2.5 GSample/sec/channel –Segmented memory –Embedded Celeron PC Samples proton bunch or four pbar bunches per transfer Signal processing analysis on waveform in Scope PC Decimate data to single position per bunch –Pbars – 64 turns –Protons – 256 turns

f October 28-31, 2002DoE Review - Instrumentation - BLT8 Tevatron Scope BLT Results First Pbar TransferSixth Pbar Transfer pbar bunches per transfer; 64 turns per bunch; closing on second bunch

f October 28-31, 2002DoE Review - Instrumentation - BLT9 Tevatron Scope BLT Position calculation: X = K * (A – B) / (A + B) Resolution: ~ 140  m Calculate oscillation phase and amplitude from first 16 turns Correct injection magnets for next transfer for amplitudes > 0.25 mm Betatron phase and amplitude for all 36 pbar bunches

f October 28-31, 2002DoE Review - Instrumentation - BLT10 Tevatron Scope BLT Status Tektronix scope system in operations –Limited by slow internal data transfer ~20 seconds for 64 turns for pbars Improvements –New scopes have increased memory – two scopes just arrived Allows for ~800 turns for pbars, ~2000 turns for protons –Upgrade scope software to improve internal data transfer Increase acquisition speed by ~ x10 –Modifying position algorithm to improve resolution ~ 30 to 50  m –Integrate improvements over next few weeks

f October 28-31, 2002DoE Review - Instrumentation - BLT11 Main Injector BLT Requirements: –Measure position for first 1024 turns for all pbar bunches at injection from either Accumulator or Recycler “Hot” pbars from Tevatron in future Beam Formats: 1.Accumulator to Main Injector – Four batches of 7 to 13 bunches of 53 MHz at 8 GeV 2.Recycler to Main Injector – Four bunches at 2.5 MHz at 8 GeV 3.Tevatron to Main Injector – 36 single bunches at 53 MHz at 150 GeV (Hot pbars)

f October 28-31, 2002DoE Review - Instrumentation - BLT12 Main Injector BLT in Operations Using older AM/PM modules (see J. Crisp talk on BPMs) –Originally designed for eighty- four 53 MHz bunches –Lower efficiency for 7 bunches –Less resolution –Won’t work for 2.5 MHz Digitize at 53 MHz LabView controls acquisition and analysis Output 1024 vertical and horizontal positions plus fractional tunes and betatron phase and amplitude to ACNET

f October 28-31, 2002DoE Review - Instrumentation - BLT13 Main Injector BLT Results Phase and amplitude for 9 transfers Correct for amplitude > 0.5 mm Positions and tunes for first 1024 turns Correct on second bunch in transfer

f October 28-31, 2002DoE Review - Instrumentation - BLT14 Main Injector BLT Status Present system based on old AM/PM modules –Adequate for closing but needs updated to more responsive system System can not measure 2.5 MHz beam from Recycler Plan: Installing Digital Receiver system for 2.5 MHz beam –Installation occurring now Need to replace present 53 MHz system –Decision to be made on choice of Digital Receiver system or Scope system

f October 28-31, 2002DoE Review - Instrumentation - BLT15 Recycler BLT Requirements: –Measure position for first 1024 turns for all bunches at injection from Main Injector to Recycler Waveforms: –Four 2.5 MHz pbar bunches at 8 GeV System based on Digital Receiver technology –Uses Echotek digital receiver Just into Operations

f October 28-31, 2002DoE Review - Instrumentation - BLT16 Digital Receiver Options Hardware Option (see J. Crisp talk on BPMs) –8 channel EchoTek card (VME64) –65 MHz ADC, 14 bits –Hardware digital mixer, filters and decimation Software Option –8 channel Struck digitizer (VXI) –100 MHz ADC, 12 bits –Software digital mixer –Correlation algorithm to measure channel amplitude

f October 28-31, 2002DoE Review - Instrumentation - BLT17 Recycler BLT Positions and tunes for 1024 turns

f October 28-31, 2002DoE Review - Instrumentation - BLT18 Recycler BLT Status System in operations for about one week Closing routinely to < 0.3 mm No changes planned to system

f October 28-31, 2002DoE Review - Instrumentation - BLT19 Systems in Development

f October 28-31, 2002DoE Review - Instrumentation - BLT20 TeV Scope BLT Phase Detector Measures phase of four pbar bunches relative to RF using Tektronix 7104 scope Measurement point every 18 turns –64 turns is really 1100 turns Phase error of ~11 degrees (~0.55 ns) –Resolution ~ 1 degree (50 ps) 1234

f October 28-31, 2002DoE Review - Instrumentation - BLT21 Tevatron Digital Receiver BLT Software version of Digital Receiver system for pbars 30 MHz LP to ring single 53 MHz bunch –Ring for ~100 ns Digitize at 100 MHz Correlate with normalized response function Generate position and bunch phase for >1024 turns

f October 28-31, 2002DoE Review - Instrumentation - BLT22 TeV Digital Receiver BLT Horizontal TunesVertical Tunes

f October 28-31, 2002DoE Review - Instrumentation - BLT23 TeV Digital Receiver BLT Vertical Position vs TurnHorizontal Position vs Turn

f October 28-31, 2002DoE Review - Instrumentation - BLT24 TeV Digital Receiver BLT Comparison of position data to theory (courtesy of V. Lebedev) + Horizontal Position, --- Difference from fitPosition, --- Difference from fit Synchrotron factored out

f October 28-31, 2002DoE Review - Instrumentation - BLT25 Tevatron Waveform Movie Proton injection Vertical Stripline into fast scope Red = A-B Blue = A+B 1 to 2000 turns by ns sampling Negative Vertical Chromaticity Longitudinal dampers off

f October 28-31, 2002DoE Review - Instrumentation - BLT26 Head-Tail Measurements (courtesy of P. Ivanov) Developing of the head-tail instability with dipole longitudinal configuration Developing of the head-tail instability with monopole longitudinal configuration

f October 28-31, 2002DoE Review - Instrumentation - BLT27 Chromaticity Measurement by the Head-Tail Monitor (courtesy of P. Ivanov)

f October 28-31, 2002DoE Review - Instrumentation - BLT28 Summary Tevatron, Main Injector 53MHz and Recycler 2.5 MHz operational for injection closing Main Injector 2.5 MHz being installed Upgrades progressing for Tevatron and Main Injector 53 MHz systems Multi-systems need to be evaluated and decision made on priorities and how many systems to support –Advantages and disadvantages of each system –Need to guard against over design

f October 28-31, 2002DoE Review - Instrumentation - BLT29 Cast of Characters Instrumentation: Jim Crisp, Brian Fellenz, Eugene Lorman, Warren Schappert Pbar Source: Dave McGinnis Tevatron: Petr Ivanov, Valeri Lebedev Advise and Consent: Church, Pasquinelli, Pordes and others …with apologies to anyone forgotten