I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),

Slides:



Advertisements
Similar presentations
HIGH VOLTAGE POWER SUPPLY SYSTEM FOR CMS FORWARD SUBDETECTOR Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute for Nuclear Research.
Advertisements

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Slide 117 th DCS Workshop – October, 10Francesca Poggio ZDC DCS Status Report Francesca Poggio Università degli Studi di Torino INFN, sezione di Torino.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
The Detector Control System for the ATLAS SemiConductor Tracker
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
CheckSystem 2.1 Portable Test Systems Page 1 April 2011.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
The Interface Solution Experts Intrinsically Safe Design, TCM installs in: Class I, II, & III Div 1 and 2 (Zones 0/1 & 2) Up to 32 Channels.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Adapting Muon Endcap UF/PNPI HV system for GEM V. Barashko, A. Korytov, A. Madorsky, G. Mitselmakher University of Florida/Physics N. Bondar, V. Golovtsov,
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
PHOTOMULTIPLIER HIGH VOLTAGE POWER SUPPLY SYSTEM FOR THE CMS FORWARD HADRON CALORIMETER Lubomir Dimitrov, Ivan Vankov Nuclear Electronics Laboratory, Institute.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Status of Farm Monitor and Control CERN, February 24, 2005 Gianluca Peco, INFN Bologna.
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Source Controller software Ianos Schmidt The University of Iowa.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Bennett Marsh UM CERN REU 2014 Upgrades to the CMS HCAL Run Control System.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
A Silicon Photomultiplier (SiPM) Based Readout for the sPHENIX Upgrade S. Boose, J. Haggerty, E. Mannel, A. Sukhanov For the PHENIX Collaboration Introduction:
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Submitted by:.  Project overview  Block diagram  Power supply  Microcontroller  MAX232 & DB9 Connector  Relay  Relay driver  Software requirements.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
TRANSMISSION LINE MULTIPLE FAULT DETECTION AND INDICATION TO EB
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Slow Control System at experiment D. Egorov Slow Control System at V. Shutov, D. Egorov, R. Nagdasev 1/15.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Institute of Nuclear Physics Polish Academy of Sciences
SCADA for Remote Industrial Plant
Control and data acquisition system of the KTX device
ATLAS MDT HV – LV Detector Control System (DCS)
Magnet Safety System for NA61/Shine
The Online Detector Control at the BaBar experiment at SLAC
Power Supply Control for BEPCII
Presentation transcript:

I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*), Sergeev S.(**), Vankov I.(*) (*) INRNE, BAS, Sofia, (**) FNAL,USA/JINR,Dubna

I. Vankov, NEC’2003, September ‘03, Varna HV PS System Compact Muon Solenoid (CMS) - detector of The Large Hadron Collider (LHC) in CERN CMS Hadron Calorimeter (HCAL) consists of 50 mm brass plates with thin plastic scintillators between them Light collection is provided by wave length shifting fibers

I. Vankov, NEC’2003, September ‘03, Varna HV PS System HCAL Photodetectors - Proximity Focused Hybrid Photo Diodes (HPDs) Photocathodep-i-n diode U HV ~ 10 kV U BIAS ~ 100 V Operate in high magnetic field – to 3 Tesla In all HCAL about 500 HPDs 19 pixels

I. Vankov, NEC’2003, September ‘03, Varna HV PS System 500-channel PS system 226U Eurocrates 125 HV Modules HV Module – 4 HV and 4 BV channels SDLP unit – 5 LEDs and 4 trims – U HLIM, I HLIM, U BLIM, I BLIM Crate Power Supply: 48 V, U BLIM +10 V, 5 V +8 V, -8 V U BLIM (RS485) HOST PC 220 V CRATE POWER SUPPLY CRATE CONTROLLER MODULE 1 (4-CHANNEL HV AND BIAS VOLTAGE POWER SUPPLY) BV1 HV1 BV2 HV2 BV6 HV6 STATUS DISPLAY AND LIMITS PRESETTING MODULE 2 (4-CHANNEL HV AND BIAS VOLTAGE POWER SUPPLY) MODULE 6 (4-CHANNEL HV AND BIAS VOLTAGE POWER SUPPLY) BV1 HV1 BV2 HV2 BV6 HV6 HBV 1 HV1 BV2 HV2 BV6 HV6 Fig. 1. The HV system Crate block diagram. CRATELOKALBUSCRATELOKALBUS

I. Vankov, NEC’2003, September ‘03, Varna HV PS System Crate Controller: information exchange between the host computer and the crate via RS485 interface; controls the Power Supply modules using custom backplane interface; high and bias voltages setting – from the host computer; polling of all voltage and current output values as well as the voltage and current limit values; controls all crate supply voltages and gives alarm.

I. Vankov, NEC’2003, September ‘03, Varna HV PS System HV CHANNEL - DC-DC converter – kV BV CHANNEL – Linear stabilizer V CMP – overvoltage and overcurrent control DAC – voltage setting MPX+ADC – voltage and current measurement INTERLOCK – HV line integrity control

I. Vankov, NEC’2003, September ‘03, Varna HV PS System RES I BLIM I U BLIM I HLIM U HLIM CPU CONTROL LOGIC STATUS DISPLAY AND LIMITS PRESETTING ON U TRIP I TRIP CPS TEMP A[13..15] A[8..12] D[0..7] RxD TxD A[13..15] A[0..7] D[0..7] CNTRL[0..3] KILL KILL TxD RxD INTERFACE RS485 OUT RS485 IN Fig. 3. Crate Controller and Status display and Limits Presetting block diagram ST MD[0..3] CLK D-WR D-RD MEMORY CNTR[0..3] D[0..7] A[0..12] S[0] MD[0..3] CLK D-WR RES D-RD CPU - Intel single chip microcomputer (I 8031) RS 485 Interface with host computer CONTROL LOGIC – data exchange with modules MEMORY – stores all data – for Host KILL – high priority external command

I. Vankov, NEC’2003, September ‘03, Varna HV PS System Status Display LEDs · ON (green) – when it is dark all channels in the crate are off; when it is light the output voltage of all set channels are established; · U TRIP (red) – at least overvoltage in one channel is registered; · I TRIP (red) – at least overcurrent in one channel is registered; · CPS (red) – at least one of the crate power supply voltage values is out of range. · TEMP (red) – the inside temperature of the crate is above 50 0 C.

I. Vankov, NEC’2003, September ‘03, Varna HV PS System Status parameters displayed by the Host For each channel: on/off, ready, up/down, voltage fault, overvoltage, overcurrent For each module: on/off, overvoltage in any channel, over- curent in any channel, in any channel, activated interlock For each module: on/off, overvoltage, overcurrent, voltage fault, activated interlock in any module and others

I. Vankov, NEC’2003, September ‘03, Varna HV PS System Fig. 4. The Power Supply System control program package. PROGRAM PACKAGE: Client/Server architecture INTERFACE - Distributed Information Manager (DIM) PACKAGE PROGRAMS: Server programs Client programs Debugging tools

I. Vankov, NEC’2003, September ‘03, Varna HV PS System SERVER – up to 8 RS485 interfaces SERVER PROGRAMS: 1.Tools to set/retrieve the Power Supply system hardware configuration. 2.Tools to set and check serial ports. 3.Facilities to set DIM items names and alias names for a higher level monitoring system. 4.Publishing of the control information via DIM protocol. 5.Viewing of the published information for the debugging purposes.

I. Vankov, NEC’2003, September ‘03, Varna HV PS System CLIENT PROGRAMS: Control and monitor the Power Supply System (see fig. 5). Data recording tool – data archiving. Alarming program – acoustic signals ARCHIVE BROWSER DEBUGGING TOOLS: Hardware emulator – for checking RS485. DIM information browser.

I. Vankov, NEC’2003, September ‘03, Varna HV PS System Fig. 5. The main window of the Power Supply System monitoring tool. The server works under any Windows OS of Windows NT clone Clients works at different computers with Linux or Windows OS HCAL HV power supply system will be integrated in the HCAL Detector Control System (DCS) based on the PVSS II Supervisory Con- trol And Data Acquisition System toolkit.

I. Vankov, NEC’2003, September ‘03, Varna HV PS System Max operating voltage, V Max test voltage, V Voltage resolution step, V 4 0,05 Voltage ripple, mV p-p Ramp rate, V/s 0 – Long term stability, % 0,10,1 Voltage monitoring accuracy, % 1 1 Max output current, uA 4010 Current monitoring accuracy, % 1 1 Special Floating output Parameter High voltage Bias voltage

I. Vankov, NEC’2003, September ‘03, Varna HV PS System THANK YOU FOR THE ATTENTION