Booster Acceptance, Apertures, and Alignment Kiyomi Seiya Proton Source WorkshopDecember 07, 2010.

Slides:



Advertisements
Similar presentations
Transparent Re-alignment of the Diamond Storage Ring M. Apollonio – Diamond Light Source Ltd ESLS – XXII Workshop, ESRF Grenoble, November 25 th /11/2014M.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Fermilab Booster Diagnostics, Monitors, and Software for Operational Control of Residual Radiation William Pellico Booster Accelerator FNAL HB2008.
SuperKEKB Lattice and Dynamic Aperture H. Koiso Apr. 20, 2005 Super B Factory Workshop in Hawaii.
Booster Corrector Upgrade October William Pellico.
SPEAR3 Chicane, Accelerator Physics Update, February 10, 2005 Electron optics design review August 11, 2004 –“… no show stoppers. However, …” Additional.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Accelerator Physics Issues Shekhar Mishra Sept 17-19, 1996 Main Injector DOE Review.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
Vacuum Issues from the Beam Dynamics Point of View Marc Muñoz.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Dynamic Aperture Study for the Ion Ring Lattice Options Min-Huey Wang, Yuri Nosochkov MEIC Collaboration Meeting Fall 2015 Jefferson Lab, Newport News,
New Corrector System for the Fermilab Booster E.J. Prebys, C.C. Drennan, D.J. Harding, V. Kashikhin, J.R. Lackey, A. Makarov, W.A. Pellico Fermilab, Batavia,
Beam Loss Simulation in the Main Injector at Slip-Stacking Injection A.I. Drozhdin, B.C. Brown, D.E. Johnson, I. Kourbanis, K. Seiya June 30, 2006 A.Drozhdin.
F AAC Review, May 10, Prebys 1 Answer to Question  What is the analysis backing up the claim that the losses will be reduced with the new corrector.
Booster Alignment & Magnet Moves Kiyomi Seiya. Aperture scan B75 : Aperture scan program with new corrector Kent Triplet, Alex Waller BPM data from B40.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Source 1/12/07 E Prebys 1 Proton Delivery Because MiniBooNE is off.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Dec 04 Beam Stability First considerations for beam stability at ALBA Marc Muñoz ALBA Team.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
Status of the AP2 Optics Keith Gollwitzer Antiproton Source Department November 19, 2004.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Update of Booster Alignment & Magnet Moves February 20, 2013 Bill Marsh, Kiyomi Seiya, Dean Still, Kent Triplet Alex Waller.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Proton Planning Eric Prebys FNAL Accelerator Division.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Proton Plan Eric Prebys, FNAL Accelerator Division.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Booster Beam Notching PMG Meeting Salah Chaurize August 21, 2013.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
A Possible Source of the Tune Drift on the Front Porch in the Tevatron.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Booster lattice measurement and correction with LOCO C.Y. Tan & K. Seiya Booster workshop 23 Nov 2015.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
TBT Data & Lattice Measurement for Recycler Ming-Jen Yang December 17, 2014.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
Orbit Response Matrix Analysis
Orbit Control For Diamond Light Source
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
Beam-based alignment measurements
3rd ATF2 Project Meeting, December 18-20, 2006
Startup program, 1 Machine setup (i.e. R:\Controls\matlab\acceleratorcontrol\docs\SRSetupUsingMatlab_ALS.doc) Bergoz BPM/orbit checks: monbpms, correct.
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
CLIC damping rings working plan towards the CDR
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Electron Collider Ring Magnets Preliminary Summary
Multipole Limit Survey of FFQ and Large-beta Dipole
First Look at Error Sensitivity in MEIC
Multipole Limit Survey of Large-beta Dipoles
Status of IR / Nonlinear Dynamics Studies
Error Sensitivity in MEIC
Presentation transcript:

Booster Acceptance, Apertures, and Alignment Kiyomi Seiya Proton Source WorkshopDecember 07, 2010

Contents  Magnets in the Booster  Survey and data analysis  Magnet move  Lattice calculation  Aperture scan Proton Source WorkshopDecember 07, 2010

Main components in the Booster  F-magnet * 48  D-magnet * 48  Corrector * 48  H & V dipole  Normal & Skew Quad  Normal & Skew Sextupole  Long Proton Source WorkshopDecember 07, 2010

FOFDOOD F F D D C C Short straight section Long straight section Proton Source WorkshopDecember 07, 2010

Survey and data analysis  December, 1993(S. Shukla)  F-magnet, D-magnet  April, 2005 (O. Oshinowo, P. Kasper)  F-magnet, D-magnet  BPM  August, 2009(O. Ohinowo)  F-magnet, D-magnet  Corrector magnet  RF cavity Proton Source WorkshopDecember 07, 2010

Magnet move  December, 1993(S. Shukla)  Moved magnets and improved aperture  April, 2005 (J. Lackey)  Moved F & D in horizontal & vertical Proton Source WorkshopDecember 07, 2010

Lattice calculation  Shukla’s program - Java application (A. Waller)  Last update was in 2006  MAD v8 – Console application (W. Marsh)  1994 (C. Johnstone)  Calculated with alignment error on F & D magnet and compared with ideal lattice  (A. Drozhdin)  Calculated Dog leg magnet at injection and compared with measurement.  2010 (J. Lackey)  Put all components including new correctors Proton Source WorkshopDecember 07, 2010

Aperture scan  November, 1994 (D. McGinnis, S.Shukla)  B75  Moved magnets  December, 2003 (B. Pellico)  Before septa was moved to MI-8 from L13.  December, 2004 (B. Pellico)  Measured lager aperture after septa was moved. Proton Source WorkshopDecember 07, 2010

Orbit data with 3 bump Proton Source WorkshopDecember 07, 2010

Aperture scan with B75 Proton Source Workshop  Using 3bump  DCCT  Need to be modified for the new correctors  CAMAC card (465  473)  Bump ratios  Current limit December 07, 2010

Aperture scan on current operation Proton Source Workshop  Using 3bump  Loss monitor  H: F-magnet  V: D-magnet December 07, 2010

Loss monitor Proton Source Workshop H Loss monitor V Loss monitor December 07, 2010

Next…  Aperture scan  1 bump, 3 bump or 5 bump  Modified B75  Survey data analysis  Data from August, 2009  Lattice calculation  Make sure that all elements are in MAD file.  Put in alignment error.  Compare with Shukla’s. Proton Source WorkshopDecember 07, 2010