Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
Monitoring the length of the bunches in the ESRF storage ring using microwave cavity pick ups.
Development of a Chromaticity measurement application using Head-Tail phase shift technique.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Cooling Accelerator Beams Eduard Pozdeyev Collider-Accelerator Department.
Latest Results from Digital Tune Monitor Vsevolod Kamerdzhiev (APD) Alexei Semenov (Instrumentation) Tevatron Dept. meeting, March 16, 2007.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Key Specifications for Tevatron BPM Hardware Architecture Choices Jim Steimel.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Eric Prebys, FNAL. USPAS, Knoxville, TN, January 20-31, 2014 Lecture 20 - Cooling 2 Anti-protons are created by hitting a target with an energetic proton.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Beam-based vacuum observations and their consequences Sergei Nagaitsev August 18, 2003.
#1 Energy matching It is observed that the orbit of an injected proton beam is horizontally displaced towards the outside of the ring, by about  x~1 mm.
F Project-X Related Issues in Recycler A.Burov, C.Gattuso, V.Lebedev, A.Leveling, A.Valishev, L.Vorobiev Fermilab AAC Review 8/8/2007.
Paul Derwent 14 Dec 00 1 Stochastic Cooling Paul Derwent 14 Dec 00
January Tevatron Lifetimes - P. Lebrun1 f On Tevatron Proton Lifetime at 150 December 3 Study vs Store data. Paul Lebrun Fermilab January-December.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Accumulator Stacktail Cooling Paul Derwent December 18, 2015.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Schottky Summary of status and plans for YETS 15/16.
Microwave Schottky Pickups at Fermilab Ralph J. Pasquinelli January 14, 2004.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
Specifications of Tevatron BPM Upgrade Jim Steimel.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Debuncher Stochastic Cooling Paul Derwent March 3, 2016.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F f Quadrupole Pick-Ups at CERN & Fermilab A.Jansson FNAL.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Update on the RHIC Stochastic Cooling J.M. Brennan M.M. Blaskiewicz and K. Mernick COOL Workshop 2015 Thomas Jefferson National Accelerator Facility September.
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Measuring Chromaticity Beam Dynamics meets Diagnostics Workshop Florence, Italy 4 th – 6 th November, 2015 Dr. Rhodri Jones Head of the CERN Beam Instrumentation.
Ion Commissioning: Thursday & Friday
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Beam-beam Effects in Hadron Colliders
A.KOLOMIETS & A.KOVALENKO
Jeffrey Eldred, Sasha Valishev
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
LHC (SSC) Byung Yunn CASA.
Energy Calibration of the SPS with Proton and Lead Ion Beams
Transverse instability in the AD?
Damping Ring parameters with reduced bunch charge
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli  Fermilab System Specifications  1.75 GHz center frequency  100 MHz bandwidth  One Horizontal and Vertical tank each for RR and TeV  Single Sideband Down Conversion preserves chromaticity information  Both transverse and longitudinal signals from same pickup  Bi-directional for both protons and pbars from same pickup  Gating (single or multiple bunch) for proton or pbar signals for TeV  Gating for hot or cold pbars in RR

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli  Fermilab System Capabilities  Continuous on line emittance monitor both TeV and RR  Longitudinal emittance for RR  Ability to measure individual or multiple bunches in TeV  Ability ot measure pbars in presence of protons in TeV  Ability to measure hot and cold pbars in RR  Down conversion utilizing RF source allows monitoring up the TeV Ramp  Single sideband down conversion allows measuring of chromaticity  Tune measurement for the TeV & RR  Built in calibration system to monitor gain variation with time

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli 1.7 GHz 109 x 75 mm aperture

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli SSB

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Measured Pickup Sensitivity in Recycler Sum ModeDifference Mode Directivity Measured at dB

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Array Assembly

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Beam Centering Reduces Common Mode Recycler Horizontal Pickup 1 x Protons

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Recycler Automated Vector Signal Analyzer Program Provides momentum spread, tune, revolution frequency, calculated emittance.

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Tevatron Schottky Signal Large Common Mode Signal Requires High Dynamic Range

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli  Time domain movie of Schottky signal during injection

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Pbar Tune variation through a Tevatron store Hours

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Proton Vertical Schottky up TeV Ramp

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Tevatron Proton Schottky Signals Horizontal Vertical

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Recycler Installation Tevatron Installation

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Tevatron Signal Processing Hardware in E17 service building

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli  Proposed LHC System Specifications  4.7 GHz center frequency  100 MHz bandwidth minimum allows bunch by bunch gating  One Horizontal and Vertical tank each LHC ring  Single Sideband Down Conversion preserves chromaticity information  Movable tank for common mode suppression  Gating single or multiple bunch

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli  Proposed LHC System Capabilities  Continuous on line emittance monitor  Ability to measure individual or multiple bunches  Down conversion utilizing RF source allows monitoring up the LHC Ramp  Noninvasive Chromaticity measurements  Noninvasive Tune measurement for each ring  Measurement of beam beam tune shift  Measurement of momentum spread  Built in calibration system to monitor gain variation with time

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli 4.7 GHz 60 x 60 mm aperture x 1.2 meter long

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli

LHC Microwave Schottky Pickups LARP CollaborationR. J. Pasquinelli Working on cost and labor estimate for the design Of the pickup, design and fabrication of the Processing electronics, travel and commissioning