On the Relative Benefits of Multi-Center Grand Ensemble for Tropical Cyclone Track Prediction in the Western North Pacific 2 Nov 2012 (Fri) The Fourth.

Slides:



Advertisements
Similar presentations
RSMC La Réunion activities regarding SWFDP Southern Africa Matthieu Plu (Météo-France, La Réunion), Philippe Arbogast (Météo-France, Toulouse), Nicole.
Advertisements

Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
Recent Developments of Medium-Range EPS at JMA
The THORPEX Interactive Grand Global Ensemble (TIGGE) Richard Swinbank, Zoltan Toth and Philippe Bougeault, with thanks to the GIFS-TIGGE working group.
Proposed Predictability, Dynamics & Ensemble Forecasting Expert Team Richard Swinbank, with Heini Wernli, Masayuki Kyouda and Istvan Szunyogh, and thanks.
Severe Weather Forecasting Demonstration Project in Southeast Asia Yuki Honda RA II Theme Leader on NWP Systems and Products Japan Meteorological Agency.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
HURRICANE GORDON and the NWP models near the Iberian Peninsula.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
Gridded OCF Probabilistic Forecasting For Australia For more information please contact © Commonwealth of Australia 2011 Shaun Cooper.
Introduction to Numerical Weather Prediction and Ensemble Weather Forecasting Tom Hamill NOAA-CIRES Climate Diagnostics Center Boulder, Colorado USA.
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
Forecasting Tropical cyclones Regional Training Workshop on Severe Weather Forecasting and Warning Services (Macao, China, 9 April 2013)
Impact of the 4D-Var Assimilation of Airborne Doppler Radar Data on Numerical Simulations of the Genesis of Typhoon Nuri (2008) Zhan Li and Zhaoxia Pu.
Tropical cyclone analysis and forecasting : products and tools
On-going WMO Demonstration Projects related to EXPO2010 Multi Hazard Early Warning System Multi Hazard Early Warning System Leading by SMB/CMALeading by.
GEO Work Plan Symposium 2014 WE-01 Jim Caughey THORPEX IPO.
MPO 674 Lecture 9 2/10/15. Hypotheses 1.Singular Vector structures are dependent on the barotropic instability condition in the initial vortex.
NSF Hurricane Research National Science Foundation Pamela Stephens Geosciences Directorate.
Munehiko Yamaguchi 1 21 August 2014 (Thu.) Multi-model ensemble forecasts of tropical cyclones using TIGGE World Weather Open Science Conference Montreal,
Current status of development of TIGGE products and support to SWFDP KYOUDA Masayuki 1, YAMAGUCHI Munehiko 2, and MATSUEDA Mio 3 1: Japan Meteorological.
How can LAMEPS * help you to make a better forecast for extreme weather Henrik Feddersen, DMI * LAMEPS =Limited-Area Model Ensemble Prediction.
30 November December International Workshop on Advancement of Typhoon Track Forecast Technique 11 Observing system experiments using the operational.
Celeste Saulo and Juan Ruiz CIMA (CONICET/UBA) – DCAO (FCEN –UBA)
On the ability of global Ensemble Prediction Systems to predict tropical cyclone track probabilities Sharanya J. Majumdar and Peter M. Finocchio RSMAS.
1 Takuya KOMORI 1 Kiyotomi SATO 1, Hitoshi YONEHARA 1 and Tetsuo NAKAZAWA 2 1: Numerical Prediction Division, Japan Meteorological Agency 2: Typhoon Research.
Tropical Cyclone Information Processing System (TIPS) Li Yuet Sim Hong Kong Observatory May 2009.
TIGGE and operational EPS 経田 正幸 KYOUDA Masayuki Numerical Prediction Division, Japan Meteorological Agency 9 th THORPEX GIFS-TIGGE Working Group meeting.
KIT – University of the State of Baden-Württemberg and National Laboratory of the Helmholtz Association Variability in forecasts of the track.
The THORPEX Interactive Global Ensemble (TIGGE) and development of a future Global Interactive Forecast System (GIFS) GIFS-TIGGE WG report for WWRP JSC4.
Report from GIFS-TIGGE working group Richard Swinbank, and Zoltan Toth, with thanks to the GIFS-TIGGE working group, THORPEX IPO and other colleagues Presentation.
PREDICTABILITY OF WESTERN NORTH PACIFIC TROPICAL CYCLONE EVENTS ON INTRASEASONAL TIMESCALES WITH THE ECMWF MONTHLY FORECAST MODEL Russell L. Elsberry and.
Application of Numerical Weather Prediction Prognoses to Operational Weather Forecasting in Hong Kong Pre-CAS Technical Conference on "Environmental Prediction.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
Huiling Yuan 1, Xiang Su 1, Yuejian Zhu 2, Yan Luo 2, 3, Yuan Wang 1 1. Key Laboratory of Mesoscale Severe Weather/Ministry of Education and School of.
Report from GIFS-TIGGE working group Richard Swinbank, and Young-Youn Park, with thanks to the GIFS-TIGGE working group, THORPEX IPO and other colleagues.
Munehiko Yamaguchi, Sharanya J. Majumdar (RSMAS/U. Miami) and multiple collaborators 3 rd THORPEX International Science Symposium 14 Sep Coordinated.
18 September 2009: On the value of reforecasts for the TIGGE database 1/27 On the value of reforecasts for the TIGGE database Renate Hagedorn European.
Munehiko Yamaguchi, Sharanya S. Majumdar (RSMAS/U. Miami) and multiple collaborators 3 rd THORPEX International Science Symposium 14 Sep Coordinated.
An Examination Of Interesting Properties Regarding A Physics Ensemble 2012 WRF Users’ Workshop Nick P. Bassill June 28 th, 2012.
Ensemble Forecasting at RSMC La Réunion WMO/WWRP Training, Nanjing, dec 2011 Matthieu Plu, Thierry Dupont, Sébastien Langlade, Nicole Girardot METEO-FRANCE.
Impacts of Rossby Wave Packets on Forecast Uncertainties and Errors
Exploring Multi-Model Ensemble Performance in Extratropical Cyclones over Eastern North America and the Western Atlantic Ocean Nathan Korfe and Brian A.
Improvement of the JMA typhoon track forecast Kenji KISHIMOTO National Typhoon Center Forecast Division JMA.
Table 2.1 Monthly and annual total numbers of products issued by the RSMC Tokyo - Typhoon Center in 2011.
TIGGE Archive Access at NCAR Steven Worley Doug Schuster Dave Stepaniak Hannah Wilcox.
Munehiko Yamaguchi Typhoon Research Department, Meteorological Research Institute of the Japan Meteorological Agency 9:00 – 12: (Thr) Topic.
A study on the spread/error relationship of the COSMO-LEPS ensemble Purpose of the work  The spread-error spatial relationship is good, especially after.
THORPEX THORPEX (THeObserving system Research and Predictability Experiment) was established in 2003 by the Fourteenth World Meteorological Congress. THORPEX.
NCEP CMC ECMWF MEAN ANA BRIAN A COLLE MINGHUA ZHENG │ EDMUND K. CHANG Applying Fuzzy Clustering Analysis to Assess Uncertainty and Ensemble System Performance.
Forecasting Oceanic Cyclones at the NOAA Ocean Prediction Center Joseph M. Sienkiewicz, D. Scott Prosise, and Anthony Crutch NOAA/NWS/NCEP/Ocean Prediction.
Munehiko Yamaguchi 12, Takuya Komori 1, Takemasa Miyoshi 13, Masashi Nagata 1 and Tetsuo Nakazawa 4 ( ) 1.Numerical Prediction.
Fuzzy Cluster Analysis Investigating Wavebreaking in the Tropics Philippe P. Papin Team Torn Meeting – April 15, 2015 Department of Atmospheric and Environmental.
Figures from “The ECMWF Ensemble Prediction System”
Seoul National University
Uncertainty cones deduced from an ensemble prediction system
Observation-Based Ensemble Spread-Error Relationship
Use of TIGGE Data: Cyclone NARGIS
A Review of the CSTAR Ensemble Tools Available for Operations
Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier
Studies on Tropical Cyclone Forecasting using TIGGE
Motivation Investigation of predictability using ensemble forecasts
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Science Objectives contained in three categories
Report from GIFS-TIGGE working group
Status Report of T-PARC/TCS-08
Update of NMC/CMA Global Ensemble Prediction System
Tropical storm intra-seasonal prediction
Verification of Tropical Cyclone Forecasts
Presentation transcript:

On the Relative Benefits of Multi-Center Grand Ensemble for Tropical Cyclone Track Prediction in the Western North Pacific 2 Nov 2012 (Fri) The Fourth THORPEX Asian Science Workshop Kunming, China Munehiko Yamaguchi 1, Tetsuo Nakazawa 1,2 and Shunsuke Hoshino 1 1: Meteorological Research Institute, Japan Meteorological Agency, Tsukuba, Japan 2: World Meteorological Organization, Geneva, Switzerland 山口 宗彦

Background Past Present Future Research Phase TIGGE (started 2006) TIGGE CXML (started 2008) Goal: Enhanced use of ensemble prediction for operational purposes Operational Phase Various projects to demonstrate the value of ensemble prediction have been conducted. Example 1. A WWRP-RDP “North Western Pacific Tropical Cyclone (TC) Ensemble Forecast Project (NWP-TCEFP)” Example 2. Severe Weather Forecast Demonstration Project (SWFDP)

NWP-TCEFP Homepage URL: Main Page Send to to get ID and The Meteorological Research Institute of the Japan Meteorological Agency (MRI/JMA) created a website for the NWP-TCEFP.

Ensemble TC track forecast -MCGE- Track forecasts from CMA (ensemble size is 15), ECMWF (51), JMA Typhoon EPS (11), JMA One-week EPS (51), KMA (17), MSC (21), NCEP (21), STI (9) and UKMO (24) are available as of December Ensemble TC track forecast by all ensemble member of all centers. (Ensemble TC track forecast by each center is also available)

Ensemble TC track forecast -Each Center-

Multi-Center Grand Ensemble Past Research Phase TIGGE (started 2006) TIGGE CXML (started 2008) TIGGE has made it possible to construct a new ensemble, that is Multi-Center Grand Ensemble MCGE EPS at ECMWF EPS at CMA EPS at JMA EPS at KMA EPS at XXX Relative benefits of MCGE over single model ensemble (SME), that is ensemble prediction system (EPS) at each NWP center, have yet to be verified from a perspective of typhoon track predictions. MCGE is an ensemble of ensembles of major NWP centers.

SME vs MCGE Using the TIGGE dataset, the relative benefits of MCGE over SME are investigated from both deterministic and probabilistic perspectives. Verified TCs: 58 TCs in the western North Pacific basin from 2008 to 2010 Verified items: 1.TC strike probability (verification of probabilistic forecasting) 2.Confidence information (verification of ensemble spread) 3.Ensemble mean track prediction (verification of deterministic forecasting)

TIGGE providers Verifications are conducted for the forecasts initiated at 00 and 12 UTC only. Meteo France is eliminated from the verifications since their forecasts are initiated at 06 and 18 UTC only. NCEP’s forecasts initiated at 06 and 18UTC are not included in the verifications. The verification results of BOM is based on the data in 2008 and 2009 only because the data in 2010 is not available. The number of verification samples of JMA is smaller because JMA’s forecasts are initiated at 12 UTC only.

TC strike probability Original idea by Van der Grijn (2002, ECMWF Tech. Memo): “A forecaster is often more interested in whether a TC will affect a certain area than when that TC will hit a specific location.” He defined the strike probability as “the probability that a TC will pass within a 65 nm radius from a given location at anytime during the next 120 hours”. Example -TC strike probability map- It allows the user to make a quick assessment of the high- risk areas regardless of the exact timing of the event. The strike probability is based on the number of members that predict the event with each member having an equal weight.

Verification result of TC strike probability -1- Strike prob. is computed at every 1 deg. over the responsibility area of RSMC Tokyo - Typhoon Center (0 ∘ -60 ∘ N, 100 ∘ E-180 ∘ ) based on the same definition as Van der Grijn (2002). Then the reliability of the probabilistic forecasts is verified. Reliability Diagram -Verification for ECMWF EPS- In an ideal system, the red line is equal to a line with a slope of 1 (black dot line). The number of samples (grid points) predicting the event is shown by dashed blue boxes, and the number of samples that the event actually happened is shown by dashed green boxes, corresponding to y axis on the right.

Verification result of TC strike probability -2- All SMEs are over-confident (forecasted probability is larger than observed frequency), especially in the high-probability range.

Benefit of MCGE over SME -1- Combine 3 SMEs Reliability is improved, especially in the high-probability range. MCGE reduces the missing area (see green dash box at a probability of 0 %).

Best SME (ECMWF) MCGE-3 (ECMWF+JMA+UKMO) MCGE-6 (CMA+CMC+ECMWF+JMA+NCEP+UKMO) MCGE-9 (All 9 SMEs) Benefit of MCGE over SME -2- MCGEs reduce the missing area! The area is reduced by about 1/10 compared with the best SME. Thus the MCGEs would be more beneficial than the SMEs for those who need to avert missing TCs and/or assume the worst-case scenario.

Verification of ensemble spread Verification at 3 day predictions x axis: ensemble spread y axis: position error of ensemble mean track prediction Verification at 3 day predictions x axis: ensemble spread y axis: position error of ensemble mean track prediction

Verification of confidence information Position errors (km) of 1 to 5 day ensemble mean TC track predictions with small (blue), medium (orange) and large (red) ensemble spread. Each color has five filled bars, corresponding to the position errors of 1 to 5 day predictions from left to right. If a SME is successful in extracting the TC track confidence information, the average position error of small-spread cases would be smaller than that of medium-spread cases, and the average position error of large-spread cases would be larger than that of medium-spread cases. The frequency of each category is set to 40%, 40% and 20%, respectively (Yamaguchi et al. 2009).

Relative benefit of MCFE over SME 3 days 4 days 5 days Position errors (km) of the ECMWF EPS (blue) and the MCGE-3 (green) for extremely small ensemble spread cases (20% of the total number of prediction cases). The position error of MCGE is generally smaller than that of the best SME, indicating that when multiple SMEs simultaneously predict the low uncertainty, the confidence level increases and a chance to have a large position error decreases.

Verification of ensemble mean track prediction Position errors (km) of 1- to 5-day TC track predictions by the unperturbed control member (unfilled bars) and ensemble mean (filled bars) of each SME. The circle (hyphen) mark means that the difference in the errors between the control member and ensemble mean is (not) statistically significant at the 95 % significance level. The ensemble mean has better performance than the control prediction in general and the improvement rate is relatively large for the longer prediction times.

Position errors (km) of 1- to 5-day TC track predictions by the ensemble mean (EC MEAN) and high-resolution deterministic model of ECMWF (EC DTM) and the ensemble mean of the MCGEs and MCEs. Verification of ensemble mean track prediction The position error of 5-day predictions by the MCGE-3 is slightly smaller than that of the ensemble mean of the best SME, which is the ECMWF EPS, though the difference is not statistically significant at the 90 % significance level. The TC track prediction by the high-resolution deterministic model of ECMWF has better performance than the ensemble mean of the ECMWF EPS up to 3 days.

Summarize the points so far… The relative benefits of MCGE over SME are investigated from both deterministic and probabilistic perspectives. 58 TCs in the western North Pacific from 2008 to 2010 are verified. 1.TC strike probability Reliability is improved in MCGE, especially in the high-probability range. MCGE reduces the missing area by about 10 %. 2.Confidence information When multiple SMEs simultaneously predict the low uncertainty, the confidence level increases and a chance to have a large position error decreases. 3.Ensemble mean track prediction The position error of 5-day predictions by the MCGE-3 is slightly smaller than that of the ensemble mean of the best SME though the difference is not statistically significant.

Typhoon track prediction by MCGE-9 Good example Bad example There are prediction cases where any SMEs cannot capture the observed track. => It would be of great importance to identify the cause of these events and modify the NWP systems including the EPSs for better probabilistic forecasts. Typhoon Megi initiated at 1200 UTC 25 th Oct Observed track Typhoon Conson initiated at 1200 UTC 12 th Jul. 2010

 Most of the published studies using TIGGE data are focused on predictability & dynamical processes  Examples:  Prediction of SH cyclones (Froude, 2011)  Prediction of MJO (Matsueda & Endo, 2011)  Impact of ET transition of cyclones (Keller et al, 2011)  Planned paper reviewing TIGGE research, in conjunction with PDP WG. A range of papers based on TIGGE forecasts have demonstrated benefits of multi-model grand ensembles, in particular for surface air temperature, rainfall, tropical cyclone tracks, e.g.: –Matsueda & Tanaka (2008), Johnson & Swinbank (2009), Yamaguchi (2012) Other papers have also compared multi-model ensembles with use of reforecasts to correct systematic errors – with similar benefits, e.g.: –Hagedorn et al (2012), Hamill (2012)

ECMWF (50 members) Sinlaku initiated at 12UTC 10 Sep Dolphin initiated at 00UTC 13 Dec Some contradictions of ensemble spread among EPSs Japan Philippines Taiwan NCEP (20 members) Black line: Best track Grey lines: Ensemble member

What controls the ensemble spread of tracks? 1.Methods: Different methods of creating initial perturbations may control it, resulting in different growth of the perturbations. 2.Amplitudes: Initial amplitudes of the perturbations may affect the size of the ensemble spread, especially in the early forecast stage. ECMWFNCEPJMA MethodSV methodEnsemble Transform SV method Amplitudes are determined in each NWP center in a statistical way

Best track and intensity of Typhoon Sinlaku by RSMC Tokyo-Typhoon Center Best track Intensity MSLP (hPa)

Vertical profile of perturbation Kinetic Energy Perturbation kinetic energy at each vertical level is averaged over the all ensemble members over a 2000 km x 2000 km domain centered on Sinlaku JMA ECMWF NCEP

day forecasts 3 day forecasts Relationship of spread of ensemble track forecasts between ECMWF and NCEP

Baroclinic energy conversion within a vortex The dynamics of the baroclinic instability in the mid-latitude waves can be applied to a TC-like vortex in a cylindrical coordinate system. Certain latitude North pole Mid-latitude Certain radius TC center Tropical cyclone Streamfunction perturbation Temperature perturbation C C W W

ECMWF ensemble member 21 before recurvature Shade: Streamfunction perturbation Contour: Temperature perturbation ECMWF ensemble member 21 (500hPa) Schematic L L H +T -T

Wind perturbation at 500 hPa in storm relative coordinate Radial heat flux at r=500km T = 0 hour (initial time) 3000 km N W E S NWESN

Wind perturbation at 500 hPa in storm relative coordinate Radial heat flux at r=500km T = 6 hours 3000 km N W E S NWESN

Wind perturbation at 500 hPa in storm relative coordinate Radial heat flux at r=500km T = 12 hours 3000 km N W E S NWESN

Wind perturbation at 500 hPa in storm relative coordinate Radial heat flux at r=500km T = 18 hours 3000 km N W E S NWESN

1. Perturbation growth as well as the initial amplitude of the perturbations control the spread of ensemble track forecasts. 2. Baroclinic energy conversion plays a role in the modification of the track Summary Though the ECMWF initial perturbation amplitudes are small, the growth of the perturbations helps to obtain an appropriately large ensemble spread of tracks. Meanwhile, the relatively large amplitudes of initial perturbations seem to play a role in obtaining the ensemble spread of tracks in NCEP.

Thank you for your attention

 Most of the published studies using TIGGE data are focused on predictability & dynamical processes  Examples:  Prediction of SH cyclones (Froude, 2011)  Prediction of MJO (Matsueda & Endo, 2011)  Impact of ET transition of cyclones (Keller et al, 2011)  Planned paper reviewing TIGGE research, in conjunction with PDP WG.

Recent studies by Hamill et al. (2011a, 2011b, MWR) ECMWF vs EnKF + GFS